First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement.

Slides:



Advertisements
Similar presentations
Front end test stand — WP2
Advertisements

Personalisation Implications for the workforce. On the internal workforce –What does the new agenda mean for social care staff? –What changes will we.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
Measuring and reporting outcomes for your BTOP grant 1Measuring and Reporting Outcomes.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
GENERAL INSURANCE Formed under Act.,1972..
Fitness for Practice: How Can Junior Doctors Ensure They Keep Up To Date? K Knight, R Wright, N Whybra University of Leicester Aim Producing medical students.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
Production visibility: KPI’s in Real-time BASF – The Chemical Company
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
Skill Management for accelerator operation and maintenance. Hiromi Inokuchi National Institute of Radiology Sciences, Japan
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
Program Overview The College Community School District's Mentoring and Induction Program is designed to increase retention of promising beginning educators.
Jack Schmidt Fermilab NLIT  The 1 st Year  Staffing Issues  Internal Tool Audit  Problem Management  Change management  Process Improvements.
STFC Safety, Health and Environment (SHE) Codes SHE communication is an area the STFC needs to improve and a simple demonstration of effective safety management.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Chipir A new neutron single event test facility at the UK’s ISIS Neutron and Muon Source.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Principles of Information Technology
Training Provider Briefing Session 2.00pm Welcome 2.10pm Walsall Works 2.40pm Q&A session 3.00pm Networking 3.30pm Close.
Training Advanced Photon Source Operators: From the Street to the MCR Joseph Sutton Assistant Chief of Operations Advanced Photon Source Argonne National.
Standardization of Oxygen Monitoring and Suctioning for Inpatient Care of Bronchiolitis in an Academically-Affiliated Community Setting Grant Mussman,
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation,
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Dept of Materials Engineering l Use of a Virtual Laboratory to plan, execute and analyse Neutron Strain Scanning experiments. John A James 1, Javier R.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Lesson 9: Types of information system. Introduction  An MIS is a decision support system in which the form of input query and response is predetermined.
CHMRAT Roll Out th February 2013 Practice Support and Development Officer GNC.
Creating & Building the Web Site Week 8. Objectives Planning web site development Initiation of the project Analysis for web site development Designing.
Tungsten Powder Jet Update Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target Meeting 6-7 November-2008.
ISIS Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement Rutherford Appleton Laboratory, Oxfordshire.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
DESY. Deutsches Elektronensynchrotron Introduction of DESY and MKK group Jens-Peter Jensen Asset and Maintenance Management Workshop 2013 Genf,
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
Improving access to CAMHS Applying LEAN within CAMHS Beverley Mack Bexley CAMHS.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Beam losses on ISIS and induced radioactivity from MICE David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
FLDt First Line Diagnosis tool ‘The fault analysis tool for the ISIS Accelerator’ Update Oct 2014 WAO Mainz Julian Brower CEng FIET Section Leader ISIS.
ISIS operational update
UK Neutrino Factory Conceptual Design
Challenges of Dual Harmonic RF Systems
MICE Computing and Software
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Risk assessment of science experiments: the logic and the process
Snr Power Supply Engineer
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Report on EUCARD WP6: MICE Transnational Access (TA)
1- Short pulse neutron source
Neutron Detector Systems at ESS
Unit 3 & 4 VCE PHYSICAL EDUCATION
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
DIMETRA™ EXPRESS SYSTEM SERVICES
Some Thoughts on the JLEIC Ion Injector
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement

FLD Rutherford Appleton Laboratory, Oxfordshire

ISIS World’s class Spallation Neutron Source Flagship STFC facility [Science & Technology Facilities Council] ~354 staff (1 st Feb 13) UK has largest national neutron user community of any country, 750/800 experiments/yr, up to 450 papers/yr Research fields; clean energy, environment, pharmaceuticals, health care, nanotechnology, materials engineering, IT

Ion Source:35 keV H –, RFQ: 665 keV H –, LINAC: 70 MeV H –, 4 tank, MHz, 200 µs, 50 pps Synchrotron:800 MeV proton, 10 accelerating cavities, 50 Hz Targets: uA, Tantalum coated Tungsten, TS1/160kW TS2/40kW

User Cycles cycles/yrs 120days/yr 30 day cycles 1 day maintenance day mid cycle Typical experiment 1/2day – 2 weeks Overall availability 85% + (pk 94%) (2nd Harmonic and RFQ)

Some reasons for non availability Running an accelerator Machine age Running harder Speed to faults

Operating ISIS 4 man crew, 8 hour shifts Duty Officer, 3 others, engineering backgrounds Deal with all first line faults Use existing skills and knowledge to analyse faults On call system for specialists 24/7

FLD, improving availability by effective fault resolution FLD, First Line Diagnosis Interactive fault analysis tool Technical knowledge base Provides centralised resources for fault finding Aim to reduces beam downtime of ISIS

FLD, a network of interconnected flow diagrams, with links to technical resources

PC accessible WiFi accessible FLD Presents information in a Web Page Format Available On line and Off Line

Start Interactive tabs Numbered and revisioned Standardised format

FLD Features Standardised tabs

Appendices Word search Live scopes Equipment Risk assessments

Procedures Spares Movements

Ski Slope Competency/callout matrix

Benefits Increase speed to fault resolutions Aiming for 12 ½ %/yr of ISIS down time saved Standardisation of fault approach Efficient and effective use of time and resources Increase residual skills and knowledge of crew, social capital

Project deliverables/timescales Roll out 6 high consequence pathways (within 3 months) Roll out much of FLD to ISIS (2 years) Implement SSC/Spares/Document/Word search (1year) Employ 2 additional staff to facilitate growth (2 years) Utilise metrics and feedback lessons learned (constant) 12 ½ % lost time/yr, return on investment (within 5 years)

Questions?