DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST.

Slides:



Advertisements
Similar presentations
Euratom 1 AIA robot – DEVELOPMENT OF AN ITER RELEVANT INSPECTION ROBOT Euratom.
Advertisements

Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Chapter 19 GMAW–Equipment
Welding Details.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
1 Cables A large portion of electrical signals are transmitted through solid electrical solid electrical conductors. A wire is a single conductor. A cable.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Preliminary Design for the Coupling Coil Cryostat in MICE
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
WELDING TESTS & OTHERS ISSUES SUMMARY
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
P.Barclay CLRC1 SCT HEX PRR ( ) Design and qualification of fittings and filters l Background comments: »Space and assembly constraints prevent us.
HELIUM LEAK TEST OF INNER BORE WELDS OF TUBE#TUBESHEET JOINT
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Logo area Cold Mass Design, Assembly Plans & QC by US HL-LHC-AUP Antonios Vouris MQXF International Review – CERN, June 7 th – 10 th, 2016.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
Teleconf ACS – FREIA 28th March 2017
Cryostats for superconducting magnets
Organization of proposed cryolab collaboration with AEGIS
MQXC Nb-Ti 120mm 120T/m 2m models
Presented by.
Date of download: 10/11/2017 Copyright © ASME. All rights reserved.
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
LARP Phase II Secondary Collimator RC1
UNIT-2 CASTING AND WELDING
Flexible lines assembly
Control Blade Design and Fabrication Improvements using Laser Welding
Test box for ProtoDUNE SP – Integration Test
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
IMP Cryomodule Assembly and Alignment
Cryomodule Assembly Plan
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
SC1R Cold Box PDR Assembly Sequence
Model Dipole Fabrication & Testing 2016 Plan, Schedule, Budget
Technical Drawings.
Presentation transcript:

DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST REACTOR TECHNOLOGY GROUP Introduction The main vessel (MV) of PFBR contains the reactor components, which are immersed in sodium pool. In case of sodium leak from the MV, it will be collected in the safety vessel (SV). The leaked sodium in SV is detected by Extended Spark Plug type Leak Detector (ESPLD) provided in the inter space between MV and the SV. MI type leak detector is used as a diverse method of leak detection. PFBR VIEW Fig. 2. ESPLD SENSOR PORTION (PHOTO) Fig. 1. ESPLD SENSOR PORTION (SCHEMATIC) ESPLD WITH 24 METER LONG M.I. CABLE The SS needle tube (O.D.0.9&I.D.0.6mm) will work like a conductor The active length of the sensor is around 50 mm and the overall diameter is 5 mm. M.I cable of 1.5 mm dia. 24 m long is used for electrical signal from sensor. A 4 mm dia. 24 m long S.S. capillary tube is welded with sensor to protect M.I cable. Challenges involved The assembly of this sensor consists of 5 laser weld joints with close tolerance. The SS sleeve and 24 meter long M.I cable is to be joined using laser welding. Each joint has different sizes and has different welding parameters. One of the challenging jobs is to laser weld the M.I. cable center conductor (0.59mm dia.) to the SS needle. For this weld joint, M.I. cable conductor portion has to be machined from 0.9 mm dia. to 0.59 mm dia. for a length of 30 mm long. Specially designed jigs and fixtures were used and machined the conductor successfully at IDEAS. To set the welding parameters, and for welding procedure qualification, three sets of mock up pieces are machined and welding parameters are set. The welding procedure has been qualified by visual, liquid penetrant test and macro examination. After improving the I.R. value of M.I. cable using tape heaters, the laser welding was carried out on the actual job. In each stage of welding, quality assurance was ensured and welding was qualified with visual and Liquid penetrant test. Conclusion The ESPLD with a suitable leak tight arrangement has been developed and fabricated. This sensor has been successfully qualified for PFBR. After insertion of sensor in the guide tube of PFBR, the leak tightness (nitrogen) of the sensor should be ensured. Hence a leak tight arrangement was designed, for guide tube (1), capillary tube (2) and M.I cable (3) which are shown in Fig.3. The leak tight arrangement will be welded after insertion of the sensor in the guide tube at PFBR site. 3 Nos. Of ESPLD with leak tight arrangement are ready for delivery to BHAVINI for installation in PFBR. Fig. 3. ESPLD SEALING ASSEMBLY Construction details The schematic and photographic of active sensor portion is as shown in Fig-1 and Fig.2 respectively. It consists of a center S.S. needle tube insulated from the outer SS tube by alumina. There is a ceramic to metal seal between the SS tube and the alumina insulator as well as between the insulator and the SS needle tube.