Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov 2014 1.Design of the.

Slides:



Advertisements
Similar presentations
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
CALICE Collaboration Meeting March 2014 Roman Pöschl LAL Orsay On behalf of: D. Grondin, J. Giraud J. Bonis, P. Cornebise, A. Thiebault, C. Bourgeois,
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
ECAL EUDET MODULE progress & perspective EUDET annual meeting, oct, 18 st, Munich.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
1 Engineering issues for FPCCD VTX Detector Y. Sugimoto KEK July 24, 2007.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Physics requirement Radial envelope: 1265 mm to 1473 mm 12 wedges over 2  20 tungsten layers of 2.5 mm 10 tungsten layers of 5 mm Instrumented gap 1.25.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
The HCAL barrel absorber structure
CALICE Si-W ECAL (& ILD) power pulsing (cabling) C.Clerc LLR, Ecole polytechnique, Palaiseau R. Cornat P.Mora de Freitas G.Musat J.-F. Roig.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SPS High Energy LSS5 Thermal contact & cooling aspects
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Dead zone analysis of ECAL barrel modules under static and dynamic loads Marc Anduze, Thomas Pierre Emile – LLR CALICE Collaboration Meeting.
Hcal Geometry and Assembly
HCAL preliminary analysis and results
ECAL EUDET MODULE Summary talk
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Local Supports for Inclined Layout: CERN Update
Mechanical aspects of SiW Ecal PCBs
WP9 ITS Mechanics and Cooling
CALICE Meeting Tokyo University, 26/09/2017
Vertex Detector Mechanical R&D Design Questions and Issues
WG4 – Progress report R. Santoro and A. Tauro.
CALICE Collaboration Meeting at UT Arlington
SiD Engineering Status Report
Presentation transcript:

Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the EM end-caps 2. Cooling system (end-caps + barrel) 3. Assembly of the EM calorimeter (ends-caps + barrel)

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 2 2 Fastening system on HCAL: thick.3cm 185 mm Detector slab (Si) Moulding of one layer / 3 alveoli L = m wall thick. = 0.5mm R~2050 End-Caps: modular alveolar structure - composite W / Carbone HR - 25,5 t 2 x 12 independent modules - 2 x 540 alveoli Ongoing developments Moulding of 3 layers of 3 alveoli - 2,5m End-Cap - Design of specific tools / long wrapping - Optimization of deflection values / skin thickness - Design of an assembly mould for End-cap demonstrator I - Towards full detector – End Caps End-Cap thick composite plate 13mm+ inserts for double row rails

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 3 3 I.2- Composite structure: shearing tests Charge & discharge cycles: hysteresis in specimens’ behaviour which evolves towards a progressive decrease in the force / displacement with the gradual breakdown of the resin before destruction of the composite Impact on ECAL dead zone CC202-ET445 sample n°4 (after CRP cycles) Progressive load Carbone w g Problem of bending stress of alveoli skins: influence / evolution of thickness of outer plies Sample E4, decrease of effort at constant displacement Shearing tests stress in the structure Dummy composite structures for plies’ thickness validation

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 4 4 Progressive loss of stiffness for the dummy structure after each cracking level – constant displacement I.3- Composite structure: shearing tests Ongoing developments 2015 Coming next: Reduction of diameter -> modification of all modules... Tsaï wu criteria Adapt FEA parameters to simulate the whole structure Safety coefficient Static: Sufficient / to the stress induced by weight of modules not sufficient / seism (s =3.2 for Japan?) / risks during integration and transport -> increase nb of ext. plies... Impact on ECAL dead zone M2M1 s = Cc / Cs = 2,8 S = 2,2 S = 1,5 MODULE -Correlation of tests with FEA simulations ● Optimization of composite wrapping / long structure ● Shearing tests on demonstrator -Ensure repeatability of process & characteristics

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 5 5 ECAL: Optimization impact Possible new geometry (H.Videau): Barrel: 5 modules of 3 alveoli – LBarrel = 3829mm (Z endcap = 3929mm). Endcaps: Quadrants of 2 modules of 2 and 3 alveoli – with R (ECAL Ring) = 40cm + Integer number of Wafers ⇒ REndcap = 1726mm Impact / Evolution of diameter -Infrastructure Module‘s weight / deformation Module‘s length / composite fab. -Cooling -Electronics in development => uncertainty on final power (4.5 KW to 30 KW) -We must move forward and propose models and tests / re-adaptation of the full leak less loop General distribution for now: - Water sub atmospheric pressure - Water temperature input: 18°c - Water temperature output: 23°c - Maximal power per column: 150 W - Pipes diameter : 13 mm ECAL End-cap D=4188 Weight(kg) Module Module Module

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 6 6 Study from the power source to the global cooling II.2-1Thermal tests of the heat exchanger II.2-2 Full scale leakless loops cooling station 13m High Line 9 m Low Line 10 m Medium Line 2,5 m 5,1 m 4,5 m Cooling Station LPSC cooling test area with a drop of 13 m II – Cooling: leakless water system -Thermal simulations / power variations (limit of pulsing) - Water heat exchanger design near detector Ongoing developments Full scale leakless loop Integration - Cooling station integration+ network -Update of water heat exchanger / BGA -Thermal tests & simulations / power variations (limit of pulsing) Cooling station Validation of leakless system (<1atm) EUDET adaptation of Water heat exchanger Caloduc Prototype Water Heat Exchanger / EUDET

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 7 7 II.1 - Cooling: Full scale leakless loops 3D Barrel distribution Distribution test plate Leak less loops construction : Distribution test plate Goal : Pressure measurement / residual bubble……. cooling station 13m High Line 9 m Low Line 10 m Medium Line 2,5 m 5,1 m 4,5 m Cooling Station ECAL End-Cap Intrados: integration with cooling leak less lines Link Tube Ti /fitting electron beam welding Ti Titanium Fitting LAPP / ATLAS IBL Insulator: Transition Ceramic/Titanium Connection integration

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 8 8 II.2 - Cooling: on going work Cooling station assembling : - Pipe wiring => ok - Electrical wiring => to be done Full scale leak less loops : cooling station 13m High Line 9 m Low Line 10 m Medium Line 2,5 m 5,1 m 4,5 m Cooling Station Cooling station assembling Pipe /valve / flowmeter

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap 9 9 Test of a two-phase HEATPIPE II.3 - Cooling: Thermal tests Study & prototype of a flat two-phase thermal diffuser (spreader) ALICE ITS IB stave Microchannels Water Heat exchanger preferred EUDET adaptation of Water heat exchanger to BGA geometry Test bench XX ?

LPSC – Third JCL - Nov 2014 R&D Detector – Si/W ECAL End-cap mm Example of ALICE integration tooling Too large / 3 cm for CALICE < 3 cm Guiding and fastening system of modules (ends-caps + barrel) III - Assembly of the EM calorimeter 1 / Specific shaped rails HCAL END-CAP ECAL END-CAP Ongoing developments 2015 Validation of technological solutions (bending of modules) Optimization / simulation of best localisation on modules Integration of heavy handling tool for modules’ tests / rails 2 / Self-aligning rollers Double row sized rail on End cap thick plate specific handling and positioning tool for integration Construction on going