Instrument Control Systems Seminar, 20 October 2014 Instrument Development Process Hans Dekker.

Slides:



Advertisements
Similar presentations
THE PROJECT LIFECYCLE National Contact Point
Advertisements

Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Automation (21-541) Sharif University of Technology Session # 5
PRJ270: Essentials of Rational Unified Process
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Systems Engineering Management
Planning. SDLC Planning Analysis Design Implementation.
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
The Software Development Life Cycle: An Overview
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Introduction to Software Quality Assurance (SQA)
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Thirteenth Lecture Hour 8:30 – 9:20 am, Sunday, September 16 Software Management Disciplines Process Automation (from Part III, Chapter 12 of Royce’ book)
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
SQA System Overview Chapter 4. Where we have been so far, Where we are going Where do software errors come from? What is quality? How can quality be measured?
INAF and E-ELT Filippo Maria Zerbi DS-USC-II. Italy (INAF) and ESO Italy joined ESO on may 24 th 1982 as the 8 th member of the organization. About 20.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
S Q A.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Michael deLamare Requirements Management Program Functions R-9.
RISE Grant: Proposal Writing Workshop UAF RISE Board February 21, 2014.
Project Management Methodology Giorgio Musso Physics Department SOSMCE 2013 Summer School Genoa, Italy.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
PROJECT LIFECYCLE.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Critical Design Review (CDR)
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
MITM743 Advanced Project Management Dr. Abdul Rahim Ahmad Assoc. Professor College of IT, UNITEN Kerzner Chapter 4 Project Management Methodologies.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Day 3 in the pmProject Management Project Management (PM) ADJUST.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Preliminary Design Review (PDR) Advanced Energy Vehicle.
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Team-Based Development ISYS321 Managing the Information Systems Project.
New Paradigms for Capital Planning in IT Security Sandy Washington Federal Railroad Administration July 22, 2008.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
First-Year Engineering Program Preliminary Design Review (PDR) Definition PDR Objectives PDR Material Project Management Review.
Camera PDR/CD1 Planning 19 September 2008
Session 2 Dr. Dan C. Surber, ESEP
Introduction to Project Management
Supportability Design Considerations
Electric Vehicles and the Environment (EVE IWG)
PM view of SAFe SAFe Construction Planning Workshop A J Casson
2K CB FDR Overview:  Agenda, Charge, Review Process
Engineering Processes
Lockheed Martin Canada’s SMB Mentoring Program
EMIS 7307 Chapter 6.
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Project Management Process Groups
Systems Engineering for Mission-Driven Modeling
Engineering Processes
Workshop commissioning Installation Coordination at ESS
PSS verification and validation
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Executive Project Kickoff
AOB General Assembly, February 2014.
MAORY Status of the project
Presentation transcript:

Instrument Control Systems Seminar, 20 October 2014 Instrument Development Process Hans Dekker

Nasmyth Architecture Change Request meeting, 17 September 2014 Contents  The Role(s) of ESO  Role of ESO Contact Person.  Ticket based support system (Jira).  Phases of the instrument development.  Documents to provide, guidelines for writing documentation

Nasmyth Architecture Change Request meeting, 17 September 2014 ESO Role(s) Consortium Interactions with ESO have two flavours: Consortium ESO/Customer Consortium ESO/Partner Statement of Work Technical Specification, ICD with Observatory Progress reports and meetings Review meetings (PDR, FDR, IRR, PAE, PAC) Verification at System level MOU (as other partners in the consortium) Workpackage description Subassembly specification, internal ICD WP progress reports to Consortium Project Office Verification at subassembly level Detector System Handling Carriage Modifications Infrastructure Cryo/Vac controller ESPRESSO ERIS MOONS FOREMOST ….

Nasmyth Architecture Change Request meeting, 17 September 2014 ESO Role(s) II Interactions with ESO Consortium ESO/Customer Consortium ESO/Partner PIESO Project scientist Project Manager ESO Project Responsible System EngineerESO Contracts Dept Project Manager System Engineer ESO WP manager(s) PI NO FORMAL CONNECTION Informal internal communications, meetings, reporting, …. ESO Contact is responsible for contract follow-up But also information “scout”

Nasmyth Architecture Change Request meeting, 17 September 2014 ESO Contact Person Normally Member of INSY (Instrument Systems)  Official channel of communication e.g. in case of RFW, delays, ICD modifications,..  Helps you to find e.g. standards, suppliers, persons at ESO with specific know-how

Nasmyth Architecture Change Request meeting, 17 September 2014 JIRA JIRA EXAMPLE Problem Information exchange/orientation (informal) Create Issue on JIRA Comments and discussion phase Recommendation by CRE review Board Decision by Change Control Board (CCB) Modification/amendment of contractual documents High energy consumption during warmup Longer warmup time? More efficient heaters? Lightweight cold structure? Use more than one SCP? RFW on JIRA Change in spec and verification matrix: warmup 7 days instead of 48 hours Change ICD: LPO will install additional SCP

Nasmyth Architecture Change Request meeting, 17 September 2014 Project Phases SOW Spec ICD ADs LIFE CYCLE DOCUMENT Pre-Phase A: Demonstrate the need for the product and identify a possible concept Phase A: Show the technical and managerial feasibility of the project -> budget, manpower, schedule Phase B: Provide one (or more) realistic technical concepts for the design + confirm Phase A estimates Phase C: Design the product so that it can be manufactured Phase D: Manufacture the components, assemble them and verify the product’s compliance with the specifications Phase E: Bring the product in its operational condition and verify its compliance with the specifications under operational conditions SOW

Nasmyth Architecture Change Request meeting, 17 September 2014 Documents to provide

Nasmyth Architecture Change Request meeting, 17 September 2014 Guidelines for good documents Use document templates (provided by ESO or project office) or ask ESO contacts for examples of “good” documents Write document during the design phase (not just for one single review) -> documents should be “live” documents that grow and mature in the course of the project Know, understand and apply all ADs Avoid where possible writing multiple documents within one discipline Allocate sufficient time for internal review process (pre-review) to check interfaces with other workpackages Reviews can be fun and productive when understood as an opportunity to answer following questions, within the consortium and together with ESO/customer: - what do we want to build and why? - how will we organize our work? - how much will the instrument cost, how long will it take? - which areas of risk (technology, schedule, cost,…) do we see and how do we tackle them? - what will be the performance and how do we verify it (in Europe and on the telescope)? - what are the interfaces with the telescope, how do we install and maintain the instrument? - how do we calibrate and operate the instrument, what will be its impact on telescope operations and data flow ?