CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)

Slides:



Advertisements
Similar presentations
Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Slice Test DAQ Wrapping Event Builder Communications Local File Writing File Input to Event Builder Interpreting the Binary Data Format ROOT Analysis Trigger.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Overview We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger trackfinder data through an XDAQ Event Builder.
CSC Muon Trigger September 21, 2004 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Paul Padley.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
TB2004 DAQ Code Development Status & Prospect. July 1, 2004TB2004 DAQ Code Development2 Contents 1.TB status –run control –peripheral/FED crate –DAQ column.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
1 The TrackFinder GUI D. Acosta, L. Gray, N. Park, H. Stöck University of Florida.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Muon Track-Finder Trigger
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
Preliminary CSC Trigger Results from September Testbeam
CSC Trigger Meeting Summary
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
Presentation transcript:

CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 2 Previous Tests The EMU group tested CSC pre-production chambers at CERN in 1997 and 1998, along with early electronic prototypes R&D on CSC performance was performed in beam tests even earlier More recently, the EMU group had two test beams in 2003, with the goal of validating peripheral crate electronics and testing trigger path with LHC-like beam for first time Two chambers tested: //

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 3 Goals for 2004 n We know that the CSC chambers work, along with the front-end electronics and peripheral electronics n What we want to do is stress-test the system with more chambers, the latest pre-production prototypes, and a new radiation tolerant clock distribution system u Trigger, DAQ, software n More importantly, we are testing/developing integration and synchronization procedures, which will help us with the commissioning CMS

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting Beam Test Goals n Base goal: u Set up pre-production system of USCMS EMU electronics and repeat prior tests using LHC-like 25 ns structured beam l Test new radiation tolerant clock and control timing module (CCB 2004), which is required before production n Additional goals: u Test CSC trigger primitive logic with RPC and CSC Anode transition card (so-called “RAT” transition card on TMB2004) u Use fully functional XDAQ-based run control and event builder u Use fully functional Level-1 Track-Finder system (self-triggering) u Use new DDU+DCC (so-called Front End Driver, FED, for DAQ) u Use new peripheral crate VME controller developed by OSU u Add in ME1/1 (Dubna groups) u Add an ME1/2 chamber (IHEP group) u Construct and mount an endcap RPC on ME1/2 (CERN, Korea, China) u Connect and test RPC trigger Link board to RAT (Warsaw) u Add a small block of iron absorber between to validate OSCAR/ORCA simulation (As set out in April) This marks a first “slice test” in the CMS Muon community

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 5 Even more goals added once started u Test slow control (DCS) prototype u Test data quality monitoring (DQM) prototype u Unify Track-Finder and Peripheral Crate run control u Add automated calls to database to log run configuration u Test multiple peripheral crates l Toward a Slice Test of the CMS Endcap Muon system, where one peripheral crate corresponds to one disk u Test multiple Sector Processors to one Muon Sorter l A 1/6 trigger “data challenge” of Track-Finder crate l Tests SP  MS communication with real tracks u Test new trigger primitive logic for anodes (ALCT) with ghost-busting improvements u Spatial and HV scan of the Dubna ME1/1 chamber u Offline simulation of testbeam setup u Injection of raw data into ORCA

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 6 CSC Cosmic Ray Test Facility n Much of the DAQ and trigger development can be tested (and has been tested) at a cosmic ray test stand devoted to such purposes in Florida u But the cosmic rate is low (Hz), and asynchronous of course u Only have CSC chambers

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 7 25 ns Structured Beam n LHC-like bunch structure during synchronous running n Trigger rates at X5A during spill u Muons: 3  10 kHz u Pions: >100 kHz n CSC readout system is designed for a L1A*LCT rate at LHC design luminosity of order 5 kHz 924 BX

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 8 May/June Running Periods 3 weeks asynchronous beam 1 week asynchronous beam Location of tests: x5a in CERN “West Area”

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting CSC Beam Test (Muon Slice Test) ME 1/1 ME 1/2 ME 2/2 ME 3/2 RE1/2

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 10 RE1/2 Installation (Endcap RPC)

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 11 Initial Geometry Dubna survey

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 12 XML Geometry Description XML version created by Michael Case

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 13 Peripheral Electronics Peripheral Crate #1 ME1/1+ME1/2 Peripheral Crate #2 ME2/2+ME3/2 RPC Link board Crate Two peripheral crates used only during 25 ns running period, otherwise all boards in PC#2

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 14 Track-Finder, TTC & Trigger Electronics TTCmi crate (machine interface for clock & orbit) TTCvi crate Level-1 Track-Finder crate

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 15 Test Beam 2004 DAQ Configuration DMB/TMB MPC CCB Peripheral Crate(s) data to BigPhys DDU (CCB) (FED Crate) XDAQWI N CFEB ALCT SP CCB TrackFinder Crate Run Control VME Local DAQ PC CFEB ALCT CFEB ALCT CFEB ALCT Configuration commands distributed via XDAQ. Event-building tested Raw file “geurts1” “acosta1” ddu???.dat.bin or RunNum???Evs*.bin SP_DDU_DAQ_run????.dat

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 16 The Integrated EMU GUI The Track-Finder GUI has been extended to include the XDAQ-based run control system Controls 4 crates: 2 Peripheral crates, Track-Finder crate, TTC crate

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 17 EmuDAQ TB2004 Data n 130GB of data collected in various DAQ modes u raw reader from bigphysarea device l debugging purposes u EmuFED-based standalone reader l debugging purposes u EventBuilder based EVB output l official output u Standalone Track-Finder output n data sample sizes: u ddudumper (raw reader): l 64GB u hardwareDumper: l 57.4GB u EVBOutput: l 11GB u SPFed data: l 0.5GB Trigger data volume is much smaller than CSC data (as expected)

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 18 Accomplishments n Using new Peripheral Crate (XDAQ) software to control 4 chambers and multiple crates n Single column of event builder tested n Monitoring prototype working offline n DCS prototype working n CCB2004 with radiation-tolerant discrete logic capable of driving all electronics u Drives gigabit optical links on trigger path, for example n Level-1 Track-Finder is successfully finding tracks and self-triggering the experiment u Became default mode of triggering for the last week n RPC signals seen in coincidence with the CSC trigger

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 19 TB2004 DQM Architecture User ROOT GUI Application xDAQ Environment EMU FED Module Event Data Source FileHardware EMU Mon Module unpacking (ORCA) DQM analyses - DQM histograms Histogram Display Server Display GUI ROOT Objects via Sockets ROOT Objects via XDAQ SOAP Direct File Writing Raw Event Data via XDAQ I2O FED: Alex Tumanov (Rice) Unpacking to ORCA: Rick Wilkinson (Caltech) DQM Analyses+Histograms: Victor Barashko, Yuriy Pakhotin (UF) CDF Display Server: Hans Wenzel (FNAL) Display Server adaptation for xDAQ: Victor Barashko (UF) CDF Display GUI: Kaori Maeshima (FNAL) Integration: Victor Barashko (UF)

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 20 TB2004 DQM Very useful for debugging data unpacking problems, and DAQ problems

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 21 DCS n Valeri Sytnik has working DCS prototype using PVSS II for EMU peripheral crate electronics n Upgraded to handle TMB2004 and CCB2004 at beam test, and demonstrated to work n Will need to resolve issues with sharing access to peripheral crate

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 22 Data analyses: Trigger Primitives J.Mumford (UCLA) Several offline programs were run to validate data immediately after run taken for trigger efficiency and any strange effects

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 23 Anode Trigger Primitive Study (ALCT) n Accelerator muon pattern efficiency (straight tracks in wires) decreases with angle as you would expect Offline analyses continuing as well…

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 24 ALCT Ghost Rate n Ghost rate very high if accelerator patterns and collision patterns both enabled without ghost cancellation mode (would flood trigger links)

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 25 ALCT Pattern Studies n Several other ALCT parameters were varied and will be studied by summer student n For example, ALCT Patterns: u Default “Miss4” “Andrey” Pat A and Pat B n Goal is to achieve high efficiency, low ghost rate, and good discrimination between collision and accelerator patterns n Hardware results should be validated against ORCA || | || |||.||.| | || ||. |. | ||.|. ||..|. || |.|.||

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 26 Track-Finder Tests n First time we tested with full Track-Finding logic to identify tracks in data n Full DAQ logging of inputs and outputs for offline comparisons u Can compare with data sent by Peripheral Crates as well as internal TF logic n L1A generation a major synchronization accomplishment for trigger u Data must be aligned spatially and temporally u Very useful for slice tests Lit LED indicates tracks found L1A signal distributed out of crate

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 27 TF: ORCA vs. Hardware Check n Correlation of track ,  between 2 stations, and track type agrees perfectly between hardware and ORCA simulation u n.b. Some aspects of the standalone ORCA trigger package still must be incorporated into CERN repository Run 366, Scurlock 64K events

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 28 Time Alignment of CSC data in Track-Finder n Able to get all trigger data from multiple chambers and crates on same BX (at least for some runs): Issue with anode timing for this chamber Run 293

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 29 Sector Processor BX Distribution n BX counter resets every time BC0 arrives 48 BX Some random triggers Run 380, muons Many spills

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 30 Track-Finder Crate Tests Cont’d n First test of multiple peripheral crates to TF crate u Synchronization test n Various clocking solutions tried to test robustness of optical links u MPC used QPLL 80 MHz clock on backplane for 25 ns runs? n First test of multiple Sector Processors to one Muon Sorter u Detailed offline checks of exchanged data should follow to validate boards SP1SP2MS

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 31 RPC  CSC Interface Test Link Board RAT Board

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 32 Preliminary RPC/CSC Results n RPC chamber operating efficiently at 9.1 kV u Both single gap and double gap modes tested n RPC signals seen in coincidence with Track-Finder trigger by Link Board monitoring package n Correlated RPC data seen in CSC trigger motherboard (local trigger primitive logic for cathodes) n Detailed quantitative checks must still be done n Problem: the RPC and Anode Transition card (RAT) seems to be significantly reducing ALCT efficiency

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 33 Continuation of Integration Tests n Plans are underway to move our Muon “slice test” to the H2 beam line to integrate with HCAL in September u Will be crowded: DT also will there, as maybe Tracker n This extends the integration to another CMS subsystem n Main objective would be to synchronize the two systems with respect to each other, possibly triggering from CSC’s n Possible to merge to some degree the run control and DAQ software, since based on a common framework u Degree to which this is done depends on remaining amount of time

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 34 Offline: Data Unpacking n Two CSC packages exist: n DataFormat u Standalone package that reads raw CSC data u Has been used extensively for over a year, including 2003 CSC TB u Still widely used in analyses (e.g. trigger studies) n METBRawFormat u It is integrated with official CERN ORCA, at least for earlier ORCA versions (but private CVS version kept as well) u Constraint: ORCA/Muon cannot depend on ORCA/Trigger l Need to think where to put trigger primitive data classes u Needs updating to the latest ORCA FED redesign by G.Bruno l Max Chertok (UC Davis) volunteers to work on this n Problems: u Both packages frequently crash on recent data, and must be made more robust l Due to data corruption, subtleties in CSC data format A.Tumanov, R.Wilkinson

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 35 Offline: Simulation n Michael Case created first XML geometry file for CSC beam test u Initial geometry only, chambers were moved around during tests n Next step is to run OSCAR job around this geometry u Tim Cox volunteers to work on this n Ultimately should inject raw data into ORCA for reconstruction, and compare with simulation u Validate CSC digitization u Verify multiple scattering in iron u Check possible impact of RPC operation on CSC n Need more volunteers, at least for ORCA-based analyses!

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 36 Conclusion n 130 GB of data logged u Many analyses still to be done! n May-June 2004 test beam program had many accomplishments u New fully XDAQ-based run control and data acquisition system tested u Pre-production prototypes working well u Trigger system synchronized and self-triggering u RPC interface tests performed n Some problems crept up: u Data unpacking robustness (more thorough studies required) u Anode LCT interface through RAT card n Will return to CERN in September/October at H2 u Continue progress toward a CMS slice test

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 37 Most documentation linked off here

Darin Acosta, University of Florida 6 July 2004 PRS/Muon Meeting 38 Thanks n I would like to thank everyone contributing to the muon beam test effort, especially those experts putting in countless hours in the control room + RPC chamber (CERN, China, Korea) and electronics (Warsaw) groups (apologies to anyone I left off)