CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.

Slides:



Advertisements
Similar presentations
City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary.
Advertisements

City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Presentation to the TRSD School Board April 17, 2014 Michael Hollow, Grade 5.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Slide 1. Slide 2 Introduction How did you get to school as a child?
SOUTH TAMA COUNTY COMMUNITY SCHOOL DISTRICT SAFE ROUTES TO SCHOOL
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Safe Routes to School Technical Assistance Resource Center Walk It Out: Walking to Transform Individual and Community Health June 7, 2013 Lake Merritt.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
Downtown Project Scope Downtown Project Reality.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Public Safety Committee September 28, 2015 David O. Brown Chief Of Police Pedestrian Safety.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015.
Where is the Safe Routes to School program in Fairfax County?
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
SAFE ROUTES TO SCHOOL: INFRASTRUCTURE DESIGN TO CONSTRUCTION.
Proposed Wedgefield K-8 School safe routes to school begin with school siting Board of County Commissioners’ meeting February 24, 2015.
39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon.
TROY ISD Long Range Facilities Planning Committee Maintenance and Operations Action Plan Transportation System Action Plan.
Lompoc Walkability Assessment September 24, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Arizona Forward Update
Improvements to Stockton Street
Scranton/Carter Road Reconstruction
District 3 Complete Streets Projects
Kerr Tar Project Update – June 2016
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SW Gage Blvd - Street Repair Project
COACT ODOT Update September 13, 2018.
CH 42 & TH 13 Construction Update
PROJ. 566(17) LOR PID MAJOR WIDENING
Gunnerson Street Safety Project
Meadow Lake Boulevard Street Extension Project
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
ARCHIE BRIGGS Traffic Calming
Presentation transcript:

CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL

Goals of the Safe Routes to School Program (SRTS) Reduce injuries and fatalities to school children. Enhance the safety of the pathways, trails, sidewalks and crossings to attract and encourage other students to walk and bike to school.

NAMES OF THE SCHOOLS SRTS Phase 3 School Locations: Benjamin Franklin Elementary School Cerritos Elementary School Chamilian Armenian School Thomas Edison Elementary School Valley View Elementary School

PROJECT LOCATION MAP

SCOPE OF WORK Modification of curb return and Installation of bulb outs and curb ramps

SCOPE OF WORK Widen Winchester to create a drop off zone for the students

SCOPE OF WORK Install traffic circles at Justin/Garden St & Justin/Randall St. Intersections

SCOPE OF WORK Install new sidewalk on Randall Street and Justin Ave

SCOPE OF WORK Fill the parkway on South side of Lake Street between Winchester and Justin and North side of Randall between Winchester and Justin with Concrete. Remove existing six street trees on Winchester and planting new trees. Reconstruction/Resurfacing of existing pavement at select intersections.

SIGNING AND STRIPING Install New Signing and Striping to Comply with New CALTRANS Standards SCOPE OF WORK New Pavement Markings, Lane Lines, Curb Markings, Retro-reflective Pavement Markings Installation of New Fluorescent and High Intensity Signing for Improved visibility

ANTICIPATED CONSTRUCTION START DATE: June 2016 PROJECT DURATION: 90 Working Days barring any unforeseen conditions SAFE ROUTES TO SCHOOLS – PHASE 3 PROGRAM IMPROVEMENTS ADJACENT TO BENJAMIN FRANKLIN ELEMENTARY SCHOOL

Public Notification Process Community Meeting Director of Public Works’ Letter Contractor’s Notification Letter (1-2 weeks prior) Project Signs 3-Day Door Hanger (Grinding/ Paving) Driveway Closures Website Updates

This PowerPoint presentation will be available for viewing at : public-works/projects/safe-routes-to-school-phase-3 The project-dedicated webpage includes project updates and other information.