Introduction and News Karl Gill. Introduction Today’s agenda News AOB – Hypernews, Calendar 2012.

Slides:



Advertisements
Similar presentations
Donor Coordination System in Montenegro Paris 8/2/11.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
NELS status 31th Annual Convention & Technical Symposium ILA October 27-30, 2002 Washington D.C NELS Co-ordinating Agency Office (CAO) Gunn Marit Hernes.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, October 15, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
GFOI Baseline Global Data Strategy Document: Discussion S. Ward, G. Dyke Space Data Coordination Group meeting #2 Reston, VA, USA September 2012.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Resources and Financial Plan Sue Foffano WLCG Resource Manager C-RRB Meeting, 12 th October 2010.
RBM Partnership Working Group on Insecticide Treated Netting Materials (ITNs) Inaugural Meeting Palais des Nations, Geneva September 8 –
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Assignment of MM1: Group discussion Discussion within your project group: What are your goals and expectations to this project? What can you contribute.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
Journal candidates for conversion to OA JournalPublisherImpact Factor ArticlesHEP Articles HEP Fraction Phys.Rev.DAPS % Phys.Lett.BElsevier %
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
ENL1819T Progress Report Confidence in Our Success.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
Project management and planning Lars Peter Jensen.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
1 ASTRONET Coordinating strategic planning for European Astronomy.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
Pixel Endcap Power Distribution Phase 1 Upgrade Plans Fermilab, University of Mississippi, University of Iowa Lalith Perera University of Mississippi CMS.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  continuing well, approx 2-4 month delay in some areas  NEW schedule:
The Future of Branches Lisa Sarjeant, HR Director Helen Johnson, Chair of Coventry and Warwickshire branch.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
AIDA WP8.4 Qualification of components and common database Simon Canfer Rutherford Appleton Lab, STFC AIDA Annual meeting, DESY,
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
News and Misc UPO Meeting Jan 16, 2012
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
LHC Computing Grid Status of Resources Financial Plan and Sue Foffano
4th FRC meeting, Antti Onnela, CERN-PH-DT
Status of ATLAS Resources
Report on EUCARD WP6: MICE Transnational Access (TA)
Francesco Forti University and INFN, Pisa
Status of ATLAS Resources
The DBD: Outline and Scope
Arab Sustainable Development Report Task Force
ASTRONET Coordinating strategic planning for European Astronomy
HL-LHC upgrade at IPHC news
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Presentation transcript:

Introduction and News Karl Gill

Introduction Today’s agenda News AOB – Hypernews, Calendar 2012

Today’s agenda Reports recent developments throughout the project

News A few points not covered elsewhere in the meeting Phase 1 MB Decisions taken so far in 2012 TDR Cost book Planning and schedule

News: Phase 1 MB (Phase 1 MB members in spare slide) Main points since last CMS upgrade week. – Proposed a TDR outline, chapter editors (backup slide) agreed to aim for a first draft by end – Reviewed the cost book Provided a draft sharing between agencies and spending profile to October RRB – » figures for contributions a mix of target/proposed/confirmed funds – Endorsed the project to install a “pilot blade system” in LS1 With Karl Ecklund as overall responsible and Simon Kwan coordinating hardware and integration in FPIX – Agreed on target for installation ahead of LS2 in an extended winter stop Agreed on strategy for ROC developments for 2016 detector – Ongoing discussion on what is the best upgrade path beyond the initial Phase 1 detector Several points to settle before the TDR – Strategy for FED upgrades, power supply replacements, scope of pre-installation tests – Identified parts that could be purchased with the first funds e.g. sensors, optical link parts – Welcomed Finland and France as full members of the project

News: New partners Finland – L3 half barrel with CERN and Taiwan – Aiming to make bump-bonding with VTT as commercial partner France – Contribute to the CO2 cooling – Also interest and experience in DAQ, backend electronics Also, UK working on a phase 1 proposal – Particular interest in DAQ

News: Costs and Sharing Pixel phase 1 cost estimate made already in 2010 – Envelope remains fixed for time-being at 17.4MCHF Salvatore Costa maintains trace of costs in the ‘cost book’ – Spreadsheet list of main parts and main sub-parts Figures based on quotes or input from experts – Sharing and spending profile included Working with agency representatives in Phase 1 MB to match costs and sharing with the proposed financial contributions Aiming to be finalized and published in the TDR. – Chapter drafted

News: Schedule and Planning A first CMS-wide Phase 1 plan is an objective for this week – We have our draft plan targeting 2016/17 installation

Schedule and Planning (cont.) Work-breakdown – List of main tasks has been drafted by Aaron Dominguez and Phase 1 Coordinators – One of our objectives this week is to progress further on this Next steps: – Review/re-iterate milestone plan and main tasks – Include resources and tracking – Link with cost book and spending profile – Formal review, along with the TDR

News: TDR situation First chapter outlines received and collated – Identified overlaps etc. and points we would like to consider adding Outline is in DocDB: – bin/DocDB/ShowDocument?docid= bin/DocDB/ShowDocument?docid=5669 Your feedback is very welcome

AOB Hypernews CMS and TK Calendar 2012

Hypernews Two new hypernews were created for Phase 1 – Pixels Phase 1 Upgrade Pixels Phase 1 Upgrade – Pixels Phase 1 Upgrade Module Pixels Phase 1 Upgrade Module Also working on improving communication via TK web pages as part of wider refurbishment of CMS web pages. Again, your feedback is very welcome

AOB: Regular Meetings and Calendar Meet outside CERN TBC (Grindelwald?)

Spare Phase 1 MB members/contacts

Phase 1 MB Membership Chair/Project Leader: R. Horisberger Austria: Josef Hrubec CERN: Duccio Abbaneo Finland: Paula Eerola France: Didier Contardo Germany BMBF: Lutz Feld Germany DESY: Guenter Eckerlin Italy: Gian-Mario Bilei Switz. – ETHZ: Rainer Wallny Switz. – PSI: Roland Horisberger Taiwan: George W.-S. Hou UK: Geoff Hall (observer) USA - NSF: Will Johns USA – DOE: Daniella Bortoletto USA – other programmes: Alice Bean. Ex-officio members: FPIX coordinator: Simon Kwan BPIX coordinator: Wolfram Erdmann CSI coordinator: Nicola Bacchetta TK PM: Karl Gill TK dep PM: Frank Hartmann TK dep PM: Aaron Dominguez TK Res. Manager: Salvatore Costa TK TIB chair: Didier Contardo CMS Tech Coordinator: Austin Ball KG, FH, AD: Phase 1 MB #215