1 AADE Operator’s Forum ConocoPhillips Alaska, Inc. 2015 Outlook Randall Kanady Staff Drilling Engineer CPA Drilling and Wells.

Slides:



Advertisements
Similar presentations
2014 Industry Outlook Forum Cook Inlet Energy, LLC Operational Update.
Advertisements

TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Engineering Design Manufacturing & Construction Presentation of Cordell Group Limited.
Petroleum Engineering 406
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Prevention of Well Control Incidents Buenos Aires, Argentina.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
Work at Heights Safety Management System
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
National Iranian Oil Company
Williston Basin Petroleum Conference Advances in Technology Panel Efficient Fracture Stimulation Rick Ross – Whiting Petroleum Corporation 1.
LTAP Advisory Committee September 19-20, 2007 Williamsport Lou Ferretti Stacey Cleary.
Implementation Update Docklands Community Forum 26 February 2014.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
SUPPORT SERVICES SUMMER 2014 UPDATE August 14, 2014.
Doyon, Limited Presentation to the House Resources Committee February 18, 2011 Juneau Alaska.
Completing & Producing A Well
04_0001 Elias Semaan Iraq Infrastructure Reconstruction Project Update.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
CALIFORNIA ENERGY COMMISSION Alaska Crude Oil Disruption Staff Update California Energy Commission Fuels and Transportation Division Gordon Schremp August.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Subsea Light Well Intervention
© North Slope Training Cooperative—revised All rights reserved. Alaska Safety Handbooks Course Number NSTC-04 Revised 11–2010.
Risk in Well Plugging & Abandonment by Twachtman Snyder & Byrd, Inc
Drift River Terminal - Emergency Flood Protection.
Luca Vignati Aktau, 25 September 2012 KARACHAGANAK ACTIVITY REVIEW AND LONG TERM DEVELOPMENT PLANS WORLD CLASS EXPERTISE – WORLD CLASS ASSET.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Consideration of Contractor Targeted Statewide Waste Characterization Studies CIWMB Board Meeting May 11-12, 2004.
Annual and program plans Briefing
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
Overview & Status for: International Association of Energy Economists Alaska Chapter October 25, 2001 Anchorage, Alaska.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Marcellus Shale: Economic Impact of this Industry Sector Updated Sue Mukherjee Director, Center for Workforce Information & Analysis Pennsylvania Department.
FY PROPOSED BUDGET  A "Target Level" expenditure base was established for all departments six- months’ worth of operations (July 1, 2016 – December.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
PROGRESS REPORT BERLIN EWA PROJECT 8 november 2012.
Fred. Olsen Energy ASA 3Q 2005 presentation 26 October 2005.
May 12, 2006 District Engineer Presentation1 Signing Performance Measures Report 2005 Data.
Page 1August 9, 2000Market Information Forum Market Information Forum ADS Phase 2 Update Presentation to Stakeholders Greg Ford and Kristen Kelley.
St. Lawrence Fluorspar Project St
Denali – The Alaska Gas Pipeline
Shell EPW Wells HS&E Learning Bulletin
CR3 and Crystal River Energy Complex
GFS Sean M. Stubenbort HSE, Site Safety Technician.
Emphasis on Quality Rochester’s City Owner Contract Process
GM Remarks Fiscal and Management Control Board September 11, 2017.
New England Resource Adequacy
Meeting of the LCLS Facilities Advisory Committee
Beaver County 2018 Function Area Highlights and 2018 Budget Forecast
Meadow Lake Boulevard Street Extension Project
Identify, Verify & Monitor Barriers
CONVENTIONAL FACILITIES STATUS
M E A S U R E ‘G’ P R O G R A M U P D A T E
Pad Reclamation and Operation
Harbour Island Force Main Replacement
Confidential - Not to be shared outside of PDO/PDO contractors
PDO Second Alert What happened? Your learning from this incident..
CONVENTIONAL FACILITIES
Fueling the Future of the Fairbanks North Star Borough
Maintenance Opportunities
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

1 AADE Operator’s Forum ConocoPhillips Alaska, Inc Outlook Randall Kanady Staff Drilling Engineer CPA Drilling and Wells

Health, Safety, & Environment – 2014 D&W Update 2  Short Service Employee policy  Hands-Free lifting policy  Proactive HSE Measures: Everyone Participates, Every Day  DROPS Audit review and corrective actions including enhanced lifting/rigging focus

Western North Slope (“WNS”) – 78% WIKuparuk – 52-55% WIPrudhoe – 36% WINPR-A CD5 ConocoPhillips North Slope Assets 3

ConocoPhillips Alaska Rig and Well Intervention  North Slope Drilling  1 Rotary Rig for Alpine (Doyon 19)  2 Rotary Rigs for Kuparuk  (Doyon 25 and Doyon 141)  2 Work Over Rigs Kuparuk  (Nabors 7ES and Nabors 9ES)  1 CTD rig (Nabors CDR2)  North Slope Well Intervention  7.5 Slickline Units  1 Digital Slickline Unit  2 Coil Tubing Units  2 E-Line Units 4

Rigs Added to Kuparuk  Nabors 7ES  Began drilling summer 2013  Approximately 100 direct and hundreds more indirect jobs  Nabors 9ES  Began drilling in 2014  Approximately 100 direct and hundreds more indirect jobs  Doyon 25 added in 4Q 2014  Signed a contract with Nabors Alaska for new-build CTD rig; begin drilling in late 2016  In July: Announced Contract with Doyon Drilling for New-Build Rig (Doyon 142)  Slated to begin drilling wells in early 2016  First new-build rotary rig added to Kuparuk’s rig fleet since 2000  Additional Drilling Has Added ~9,000 BOPD 5

CD5 Development Progress  CD5: On Schedule – On Budget ~$1 billion  Successfully Completed  6-mile gravel access road and pad  Three smaller bridges  Nigliq Channel Bridge Completion  Planned Activities 2015  Pipeline installation  Drilling to start in ~April  Installation of production facilities  Employment  ~600 North Slope jobs required during two winter construction seasons  Major fabrication activities in Anchorage and Fairbanks  Standard Alpine Drilling  Initial CD5 Development Plan  13 Alpine A Sand Wells  2 Kuparuk Wells  Commence drilling April 2015  First Production December 2015  Similar to Wells Drilled From CD2 and CD4 – 15,000’ to 22,000’ MD 6

Kuparuk Drillsite 2S (Shark Tooth) Approved for Construction  New drill site development targeting thin sands on the periphery of the field  Peak workforce during construction: estimate 250+ jobs in 2015  Approximate cost to develop: ~$500 million (gross)  Start Drilling in ~June 2015  Initial development is 14 wells  Estimated peak production: 8,000 BOPD (gross) in late

Rig Workovers  Workovers focus on CTD set-up and tubing swaps  Increasing difficulty pulling SSSV’s through buckled 7” casing  SSSV’s part instantly when tight spots are encountered  Procedures continue to change in order to manage new obstacles.  Stretch casing prior to pulling tubing  Deployment sleeve to drop off tubing  2-stage cut & pull of 7” casing 8

Managed Pressure Drilling Update 9 Baker System  MPD allows for application of a stabilized equivalent mud weight while at the same time preventing pressure cycling  MPD also allows for tripping without swabbing  Since June 2014, 6 wells drilled and cased with MPD – 100% success rate  Safekick Pressure Trapping System  Electrically actuated chokes – No hydraulics  Fully automated  No auxiliary pump required  Run via touchscreen by the driller on the rig floor

10 Questions?