27/06/2016SC32 Rapporteur Ad Hoc on Vocabulary Vocabulary Ad Hoc Rapporteur Report (SC32 Plenary Item 7.) SC36 Plenary 2006-03-27/31 Kobe Japan SC32 N1439.

Slides:



Advertisements
Similar presentations
Jeju, 13 – 16 May 2013Standards for Shared ICT Admin Working Group Report to Closing Plenary Jim MacFie, Chair Steve Barclay, Vice Chair Document No: GSC17-CL-05r1.
Advertisements

Doc.: IEEE COEX-01/010r0 Submission November 2001 Jim Lansford, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group November Plenary.
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A) JTC 1 SWG-A N Document Type:Presentation to JTC 1 Plenary Meeting Title:SWG-A.
ESMO Clinical Practice Guidelines: Consensus Conference (CC) SOP Edited by EDC-SC September 2013.
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
PROGRESS REPORT ON Arnie Greenspan Chair Member Standards Board Piscataway, NJ September 27, 2007.
SC38 Liaison Report for SC32 meetings Santa Fe, NM Baba Piprani Liaison Officer from SC32 to SC
TSB 1 Overview of TSB Director’s Ad Hoc Group on IPR GSC 8, Ottawa, Canada, 27 April – 1 May 2003 by Houlin Zhao Director, Telecommunication Standardization.
CGMS-40, 5 November 2012 Coordination Group for Meteorological Satellites - CGMS Towards a CGMS High Level Priority Plan (HLPP)
Progress on Identity Management: A Canadian Perspective on GSC Resolution 14/4 Colman Ho ISACC DOCUMENT #:GSC15-PLEN-28 FOR:Presentation SOURCE:ISACC AGENDA.
SC38 Liaison Report for SC32 meetings Gyeongju, Korea Baba Piprani Liaison Officer from SC32 to SC N2382.
TIA TECHNICAL COMMITTEE UPED Title: UPED Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #21, Big Island Closing Plenary Date Submitted: September, 2007.
1 HARMONIZATION OF ISO/IEC AND IEEE STD 1219 Thomas M. Pigoski Paul R. Croll IEEE Computer Society Montreal, May 2003.
1 WG2 N2688 – SC2 N3704 SC 2 Business Plan (Coded Character Sets) Kohji Shibano SC 2 Chair.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
SC 37 “Biometrics” and correlations with JTC1 Special Working Group on Accessibility Ing. Mario Savastano IBB (CNR) and DIEL (Federico II University of.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
ISO/IEC JTC 1/SC 32 Plenary and WGs Meetings Jeju, Korea, June 25, 2009 Jeong-Dong Kim, Doo-Kwon Baik, Dongwon Jeong {kjd4u,
Doc.: IEEE /0795r2 Submission July 2014 The China NB contributed a variation on the “usual comment” on IEEE China NB comment on
1 Summary of issues and results from GSC-12 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR WG Chair TITLE:Report of GSC-12 IPR WG AGENDA ITEM:Closing.
T-MPLS Update IETF71 March 2008 Stewart Bryant
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Status report of : Framework for generating ontologies (FGO) ISO/IEC JTC 1/SC 32 Plenary and WG2 meeting Kona, USA, 19 May, 2011 Dongwon Jeong,
Doc.: IEEE /0173r0 Submission Jan 2010 Andrew Myles, CiscoSlide 1 Closing Report Date: Authors:
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
GSC-16 Closing Plenary Summary Report
James W. Moore Liaison Representative IEEE Computer Society June 2004
ISO/IEC JTC 1/SC 7 Working Group 42 - Architecture Johan Bendz
ISO/TC 204 WG 3-Database Technologies
Summary of issues and results from GSC-12 IPR WG
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
SG-EEDC N Title: Draft Presentation from the JTC 1 Study Group on Energy Efficiency of Data Centres (EEDC) to the November 2011 JTC 1 Plenary.
ITU-T Study Group Chairmen and Vice-chairmen Training
Snow Watch Team Terms of Reference
July 2010 doc.: IEEE /0xxxr0 IEEE 802 JTC1 Standing Committee Motions for WG mid-session plenary 9 May 2017 Authors: Name Company Phone.
Status Report November 2007
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Nov 2017 opening report for EC
IEEE 802 JTC1 Standing Committee Nov 2017 opening report for EC
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Admin Working Group Report to Closing Plenary
Resolutions on Broadband and Opportunistic Wireless Access
SC 2 Business Plan (Coded Character Sets)
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee July 2018 (San Diego) closing report
JTC1 Ad Hoc Sept 2009 Closing Report
LAMAS Working Group 7-8 December 2015
Introduction to the preliminary draft of IRES
GSC-16 Closing Plenary Summary Report
IEEE MEDIA INDEPENDENT HANDOVER DCN:
JTC1 Ad Hoc November Agenda
ITU-T Study Group Chairmen and Vice-chairmen Training
Mandate, governance and name of the Committee
RR-TAG Opening Report Report on November 2007 plenary meeting
Liaison Report Date: Author: Sept 2006 Month Year
IEEE 802 JTC1 Standing Committee LS Recommendation
Debriefing from the December 2017 LAMAS meeting Item 4
Response to ISO/IEC JTC1/SC6
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
JTC1 ad hoc closing report (May11)
JTC1 Ad Hoc November Agenda
JTC1 Chair’s Closing Report
Presentation transcript:

27/06/2016SC32 Rapporteur Ad Hoc on Vocabulary Vocabulary Ad Hoc Rapporteur Report (SC32 Plenary Item 7.) SC36 Plenary /31 Kobe Japan SC32 N

27/06/2016David Clemis, Rapporteur JTC1 Ad Hoc on Vocabulary Outline 1.Introduction 2.Discussion a.“informal” notes from Ad Hoc meeting b.Recommendations of SC32 Rapporteur 3.Next Steps

27/06/2016David Clemis, Rapporteur JTC1 Ad Hoc on Vocabulary Introduction Initiation of Project SC36 Resolution – 2003 for consolidated vocabulary (after loss of SC1) Ottawa Preliminary Meeting – 2005 –Discuss Canadian proposal to use Termium™ system to consolidate ISO/IEC 2382 –6 SCs represented (SC7, SC27, SC32, SC35, SC36, SC37) –Recommendations from meeting Make consolidated on-line vocabulary “freely available” to project editors/technical experts Consider issues such as IPR, JTC1 approval process, SC development process

27/06/2016David Clemis, Rapporteur JTC1 Ad Hoc on Vocabulary Introduction (cont’d) JTC1 Plenary, Banff 2006 –Resolution in support of Canadian proposal as base –Convener of Ad Hoc charged to organize meeting Ad Hoc Invitation –Sent to JTC1 November 2006 –Not circulated to SCs or vocabulary “experts” Ad Hoc Meeting –No “official” notes –SC36 delegate notes used as basis

27/06/2016David Clemis, Rapporteur JTC1 Ad Hoc on Vocabulary Recommendations Separation of Vocabulary Issue Into Two Parts: –JTC1 Ad Hoc related Support conversion of ISO/IEC 2382 series (1- 35) declared “stable” Continue to urge for “free” access to result –SC32-related Develop consistent and “harmonized” approach to vocabulary in SC32 –Continue “work as normal” –Develop approach to promote vocabulary publicly

27/06/2016David Clemis, Rapporteur JTC1 Ad Hoc on Vocabulary Recommendations (cont’d) Creation of RG on Vocabulary –Provide SC32 input to JTC1 Ad Hoc –Represent SC32 at JTC1 Ad Hoc –Recommend ways to “harmonize” SC32 vocabulary work –REPRESENTATION (at the least) One representative from each WG Calling of “ad hoc” discussion at Kobe –Draft resolutions for closing SC32 plenary on Response to JTC1 ad hoc on Vocabulary Creation of RG

27/06/2016David Clemis, Rapporteur JTC1 Ad Hoc on Vocabulary Next Steps More Detailed Briefing to WGs –Offered “as and when possible” during week –15 minutes duration Drafting of ToR and Objectives for RG Drafting of Resolutions on –RG on Vocabulary –SC32 Response to JTC1 Vocabulary Ad Hoc