LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.

Slides:



Advertisements
Similar presentations
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Advertisements

February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Dmitry Kayran on behalf of LEReC team Brookhaven National Laboratory
PIs: Riad Suleiman and Matt Poelker
EBTF Design Review Technical Meeting Group
Engineering Status.
Experimental Overview
Laboratory Directed Research and Development (LDRD) Proposal
Electron Source Configuration
Center for Injectors and Sources
R. Suleiman and M. Poelker September 29, 2016
PIs: Riad Suleiman and Matt Poelker
Injector / Linac Installation Current Status
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
PIs: Riad Suleiman and Matt Poelker
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

LEReC

COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu Cavity 9 MHz Cu Cavity 704 MHz Cu Cavity Commissioning Diagnostic Line 1 Commissioning Diagnostic Line 2 RHIC TRIPLET RHIC DX 180° Bending Magnet LEReC Solenoids Compensating (LF) Matching (HF) Merger/Transport LEReC layout e-e-e-e-

LEReC Beam Physics & Lattice LEReC Cathodes: usually Fridays C.J. Liaw, JT LEReC DC Gun: Phone conference with Cornell usually Fridays, bi-weekly C.J. Liaw LEReC DC Gun to Booster Cavity: bi-weekly, S. Nayak LEReC Diagnostic Beam Line: weekly, K. Smith LEReC warm RF Cavities: Vendor phone conferences, Purchasing, tuner and window design, A. Zaltsman LEReC transport and cooling beam lines: bi-weekly, JT LEReC beam diagnostics: weekly, T. Miller LEReC Meetings 3

Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu Cavity 9 MHz Cu Cavity 704 MHz Cu Cavity Commissioning Diagnostic Line 1 Commissioning Diagnostic Line 2 RHIC TRIPLET RHIC DX 180° Bending Magnet LEReC Solenoids Compensating (LF) Matching (HF) Merger/Transport LEReC apertures 5.0 OD x 4.78 ID 3.75 OD x 3.62 ID 2.50 OD x 2.38 ID Valves 2.44

1.Yellow baking, cooling today. 2.Blue leak tight, baking start today Issues: 1.Fragile BPM button assemblies 2.Slit vacuum chamber leak Cooling Section Installation 5

Standard Profile Monitor Assemblies (3) (2 chambers held for drive testing) 180o Magnet Assembly Magnet (magnetic measured) Hybrid PM/ES/BPM Assemblies (2) Vacuum chamber (measured) Magnetic field monitoring (characterized) Stand (non-moving) Bellows assemblies Emittance Slit Assemblies (3) (Chamber held for drive testing) Magnet shielding test assembly April DOE Review: Test Set-ups Complete Cooling Section 2016 Installations 6

12/15 Revised Transport Solenoid Average J = 75 A/cm2 Parameters: Conductor: #5 square, solid wire Total ampere turn: 2 x = 15,584.4 AT (plus some safety margin) Center field B = Gauss Integral Bz^2 = 1.081E7 G 2 -cm (Req E7 G 2 -cm) R (cm) (1.27 thick) (1.78 thick) 1020 Steel

12/15 Revised Transport Solenoid 840 Turns, #5 square copper conductor A, 7.2 V, 0.39 Ohms Will use for both Merger and Transport Solenoids Magnets designed for 2.5” pipe. 8 Need 13, will this number be changed? when Diagnostic line solenoid – same spec’s?

12/15 Revised Transport Solenoid 9

2.1 GHz Cavity Cavity fabrication contract awarded, first vendor meeting yesterday. Windows ordered, JLAB testing next week. Frequency change and tuner section redesign complete, ECN complete Aluminum cavity testing underway Tuner design Vacuum wave guide and wave guide Stand assembly design 10

Cavity fabrication requisition prepared Drawing revision for frequency change RFP out – Bids due 2/5/15 Tuner design Window design 704 MHz Cavity 11 Frequency703.6 MHz No. of cells1 R sh 5.0 MOhm R/Q acc 178 Ohm Cavity voltage430 kV Required RF power37.0 kW Installed RF power50 kW

Injection BPM = 6 YAG = 3 ICT = 1 DCCT = 1 Emittance Slit = 1 Halo Pairs = 2 Faraday Cup (& pick-ups) = 5 BPM Vertical & Horizontal Halo Monitors & Pick-Ups Solenoid(s) YAG Em-Slit DCCT ICT BPM Laser Injection Port YAG Cathode Camera DC Gun (Photocathode) 704 MHz SRF Booster BPM Diagnostics: Gun to Booster Cavity 2.1 GHz Warm Cavity 12 BPM YAG Faraday Cup Cornell Layout GtB, Bake-out to 200C near DC Gun DC Gun instrumentation: -Large Button or ERL Buttons or Striplines?? -Profile Monitor in Laser Cross -Cathode Camera in Laser Cross

Analysis and Mechanical Design BPM chamber assemblies and stands (new or ERL buttons?) Profile monitor vacuum chambers (ERL drive assemblies) Emittance slits (ERL parts?) Halo monitor Faraday cup for diagnostic line 1 DCCT and ICT Transport Line Instrumentation 13

Gun to Booster – Meeting Tomorrow 14 New Solenoid and Corrector Magnets Relocate BPM’s (button size/style??) Added Profile Monitor

Dipole Correctors moved offset (D/S) from solenoid center line. BPM moved offset (D/S) for solenoid center line. BPM configuration defined?? Quad and Skew Quad correctors (weak) shortened to allow BPM clearance. Gun to Booster 15

Gun to Booster 16 Define Laser box requirements Detail solenoid Defining correctors

17

Booster Cavity Installation 18

Diagnostic Line

LEReC Cooling Section Design Room 20 LF & HF solenoid and 20 o dipole magnets fabrication drawings (KH) Beam Diagnostics: BPM chamber and buttons (VDM) Beam Line 5” bellows with shields fabrication drawings (GW) 20 o dipole vacuum chamber for impedence review (KH) 180 o dipole fabrication drawings (KH) Spectrometer magnet (180 o dipole) revisions (KH) 180 o vacuum chamber + large sliding bellows fabrication drawing (KH) Beam Diagnostics ES W slit & chamber fabrication drawings (VDM) 20 o dipole vacuum chamber fabrication drawings (KH) Cable tray and penetration drawings and excel sheet (AF) Beam Diagnostics: PM vacuum chamber fabrication drawings (GW) Beam Diagnostics: standard PM fabrication drawings (GW) Beam Diagnostics: special “hybrid” ES/PM/BPM fabrication drawings (GW) Beam line solenoid/BPM stands & vacuum chamber stand (VDM) 20 o magnet stand drawing (KH) 180 o magnet w/hybrid assembly BPM stand drawings (KH) on hold Magnetic shielding drawing and solenoid magnetic measurement test station (VDM) on hold In tunnel, magnetic measurement “mole” for stray field studies HF dipole, quadrupole, and skew quadrupole corrector drawings

LEReC Design Room Source Design Work 21 DC Gun Vacuum Chamber Fabrication Drawings (JH) DC Gun SF6 Pressure chamber specification control drawings (JH) DC Gun cathode cooling design for Karl S. Cornell (JH) DC Gun stands (JH) DC Gun to SRF booster cavity beam line (JH) DC Gun to SRF booster cavity laser port, view port, profile monitor (JH) DC Gun to SRF booster cavity solenoid/corrector magnets (JH) DC Gun to SRF booster cavity BPM’s DC Gun cathode insertion drive assembly ERL Gun to Booster Cavity Modifications: U/S cathode to beam tube, FPC, D/S beamline & HOM (SS, JH) Cathode coating system cathode bakeout vacuum chamber & heater (KH & BM) Cathode coating system deposition vacuum chamber w/internal cathode transport system (KH) Cathode coating system transport vacuum chamber – ferris wheel (KH & WJ)

LEReC Design Room Other Work 22 RHIC 1:00 move real estate drawings (V.DM.) Cryogenic system layout (RM) 2.1 GHz warm cavity spec. control drawings (MG) 2.1 GHz warm cavity tuner, wave guide, and warm test model (MG) 704 MHz warm cavity spec. control drawings (SP) Transport & Merger line layout (RM, KH) Locate booster cavity, solenoids, BPM’s, RF Cavities, PM’s, Diagnostic Lines Transport & Merger Line Solenoids (KH) Transport Line Solenoid Stands Transport & Merger Line Bellows and Pump Ports (GW) Transport & Merger Line CT’s (GW) Transport & Merger Line BPM’s (GW) Transport & Merger Line Correctors Transport & Merger Line Profile Monitors Merger Line Flying Wire Diagnostic Beam Lines and Components Kickers, RF cavity, beam dump,

23

Quad/SQ Corrector ± 4.13” EMITTANCE SLIT PROFILE MONITOR LOW FIELD SOLENOID HIGH FIELD SOLENOID kh BPM BPM +YAG + Slit Assemblies PROFILE MONITOR BLUE RHIC Beam YELLOW RHIC Beam 180 o Dipole Magnet Neighborhood 2016 H/V Corrector

COOLING Section Solenoids High Field Solenoid Hybrid BPM Dipole Corrector 180° Dipole Gate Valve Profile Monitor Low Field Solenoid Quad Corrector Emittance Slit Bellow s 20° Dipole Quad Corrector High field solenoid Low Field Solenoid Profile Monitor BPM Gate Valve Emittance Slit BPM Low Field Solenoid Bellow s YELLOW RHIC Beam BLUE RHIC Beam kh CSY1 CSY2 CSY3 CSY4 CSY5 CSY6CSY7 CSY8 CSB1 CSB2 CSB3 CSB4 CSB5 CSB6 CSB7 CSB8

PS Layout Phase 1 26

e-Beam Transport BPM = 8 YAG = MHz Warm Cavity BPM Solenoid(s) 11 locations 2.1 GHz Warm Cavity BPM Quadrapole(s) 2 locations YAG Diagnostics: Transport BPM MHz Warm Cavity Beam pipe size 2.38 ID does not match ERL Bake-out to near RHIC and near Booster Cavity?? ERL Buttons for BPM’s OK?? Profile Monitor drives from ERL, vacuum chamber? ERL emittance slit drive Commissioning line dipole angle 2 nd 2.1 GHz cavity location? Another 20o dipole?

Merger Beam Line e-Beam Transport BPM = 2 YAG = 1 Flying Wire = 1 BPM 28 BPM Au Ion Beam Yellow Ring To Cooling Section From Electron Transport To Commissioning Beam Line Flying Wire YAG Beam pipe size 2.38 ID does not match ERL Bake-out to 200C?? near RHIC Flying wire system or equivalent TBD

Commissioning Beam Line 29 Fixed YAG Deflecting Cavity (704MHz) From Transport Section HVDC Deflector Medium Power Beam Dump (Full Power ~250μs) Solenoid To Merger Section Scanning YAG Profile Monitor Faraday Cup YAG & Slit Commissioning B/L YAG = 3 Faraday Cup = 1 Defining Slit = 1 Beam Sampling Technique for high power single macro bunch measurements Separate Group Meeting Kicker TBS Merger solenoid?? Internal beam dump TBD Deflecting cavity design underway HVDC deflector TBD Another 20o dipole? TBD Fixed and Scan YAG’s dumps

Merger/Transport 704 Cavity 9 MHz Cavity Wire Scanner Profile Monitor Quadrupole 20° dipole Beam Dump Profile Monitor Merger SolenoidBPMQuadrupole Bellow s Gate Valve Corrector 20° dipole Profile Monitor Triplet Quadrupole Gate Valve Instrumentation line Need Quadrupole Magnet Spec’s Same as dump quadrupole? Move gate valve down stream of 20o?

IP 02:00 Profile Monitor 20° dipole Merger Solenoid Profile Monitor Emittance Slit Commissioning line 2.1 GHz Cavity

Small Dia. BPM Housings (2.38 ID), 10mm buttons ERL Buttons different size and shape BPMs in Transport Section