Bodies In the Space Environment (BISE) Operations Summary Prepared by Amy Jupin Operations Lead EO20 544-2711.

Slides:



Advertisements
Similar presentations
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
Advertisements

Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.
Amateur Radio on the International Space Station (ARISS)
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Online Testing TAKS – XL Retest 2008 – 2009 Online Testing Opportunities October 21 st – 24 th 2008 March 3 rd – 6 th 2009 April 28 th –
CONSTELLATION National Aeronautics and Space Administration Ares Project Overview – Quality in Design Chris Cianciola Kenneth Crane.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
Kenya Smith (916) (916)
Introduction to Sequence Diagrams
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
How to Fill a Reserve Request Part 3 of the Series on Reserves Using Agent VERSO.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Configuration Control
Hatrak Scheduler UsOn Line Demo HATRAK SCHEDLER.
National Aeronautics and Space Administration (NASA) Glenn Research Center NASA Glenn Research Center (GRC) Acceleration Measurement and Analysis Projects.
Folio3 IPhone Training Session 2 Testing App on device Presenter: Imam Raza.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
NASA. National Aeronautics and Space Administration Founded in 1958 as a result of the Soviet Unions launch of Sputnik.
1 NOTICE: This document includes information that is proprietary to Composite Technology Development, Inc., and is for the sole use the U. S. Government.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
UPOWG#23 – Huntsville Feb D SPACE Mental Representation of Spatial Cues During Spaceflight.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama LEGO BRICKS TIR OVERVIEW Tricia Pittman EO20.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Avatar Explore PROPOSAL NUMBERS Not available SCIENCE TEAM Erick Dupuis, Canadian Space Agency RESEARCH OBJECTIVES Demonstrate an operational and technical.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
ISS: Nom Ops P.I. P.A. Whitson, Ph.D. Johnson Space Center, Houston, Texas E057: Renal Stone Risk During Space Flight: Assessment and Countermeasure Validation.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
POIWG #32 – Jul , 2012 François NUYTTENS – Cécile THEVENOT Overview of the Inc Experiments supported by CADMOS.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
Page No. 1 ISS_CM_019 (Rev 09/2011) Sponsoring Org/Office Code: OD Name of Forum: Date: July 2015 Dan Duncavage OD/Computer Resources iPad on ISS General.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
File Uplinks Through the Payload MDM POIWG Session 15 Tuesday, September 9, 2003, 3:15 to 3:35 David Deitsch, CPO Command and Data Systems Team MSFC Flight.
Know how NASA plans and implements space missions Comprehend the essential components of a space mission Comprehend the selection and training of astronauts.
DSQR Training Reliance System
Assembling A Space Mission
Orders & Shipment Tracking
Ohio Web Portal Ohio Edison, Illuminating Company, Toledo Edison
Click Training Agreements Module
SCC P2P – Collaboration Made Easy Contract Management training
International Space Station Providers
<Your Team # > Your Team Name Here
Presentation transcript:

Bodies In the Space Environment (BISE) Operations Summary Prepared by Amy Jupin Operations Lead EO

2 BISE Mission Objectives Long term: To understand how unusual gravity conditions, and in particular microgravity, affects the perception of self-orientation Specific Objective: Conduct experiments during long-duration microgravity conditions on the International Space Station to better understand how humans first adapt to microgravity and then re- adapt to normal gravity conditions upon return to earth. Subsidiary Objectives: To construct a mathematical model of how visual, body and gravity vector cues are combined in order to explain the effects found above. To use the model developed to: explore the potential value of countermeasures to in- flight, microgravity-related visual illusions (e.g., visual re-orientation illusions); in the development of countermeasures for adverse effects post-flight (particularly after exposure to long-duration microgravity); and as a pre-flight training tool.

3 BISE Overview and Science Ongoing research has developed a unique set of perceptual tests that investigate how humans construct a perceptual 'up direction'. The results obtained on-ground have lead to a weighted vector sum model of the 'perceptual up' It is proposed to utilize these tests to investigate how astronauts' perceptual up adapts from pre-flight to microgravity, and then re-adapts from prolonged microgravity to return to earth-normal conditions. Evaluation of the adaptation to, the effect of and recovery from such long-term exposure to microgravity exposure on perception of orientation will be done by using the Oriented Character Recognition Test (OCHART protocol). There will be a minimum of six subjects to perform BISE onboard ISS.

4 BISE Hardware Overview All hardware is on-board. The items were flown to the ISS as part of the Neurospat experiment. ESA and CSA have an agreement for BISE to borrow their hardware for their operations. The only new item (sent on 15A) will be a NASA provided, flight certified DVD/CD carrying the experiment software. (Not listed below are the A31p power cables, UOP cables and earplugs) NASA A31p Laptop, DVD/CDRW drive and 60GB hard drive (ISS Pantry Items) Multipurpose Bracket and Desktop Plate Neurospat Hardware (crew will assemble for BISE ops) – Light Shield, Frame and Bracket – Control Pad and Bracket

5 BISE Hardware Overview (continued) Light Shield (latches onto frame) Light Shield Frame (slides over laptop screen) Control Pad Bracket (attaches to Light Shield) Control Pad (velcros to bracket) Light Shield Bracket (secures Light Shield position)

6 BISE Experiment Overview The subject will view the laptop screen through a shroud assembled from the Neurospat hardware. On the laptop screen the subject will view a rotated letter superimposed over a highly polarized visual background image presented in different orientations. Subjects will indicate via the Neurospat Control Pad buttons if the shape is recognized as a 'p' or a 'd'. From these judgments, the subjects will determine at what point the 'p'-'d' and 'd'-'p' transitions occur. The experiment will only be conducted in one body-screen orientation as there is no gravity vector on orbit. The experiment itself last about minutes. Over 750 data points are collected during this time. Subjects will perform the OCHART data collection twice on orbit.

7 Planning Constraints In-flight Sessions Session one: FD 10 ± 5 Days Session two: Return -15 ± 10 Days Minimum 60 days between session Sessions should be scheduled prior to any exercise or at a minimum, one hour post-exercise. In-flight Sessions Session 1 FD5 to FD15 Session 2 R -10 +/- 5 days Minimum 60 Days Between Sessions Note: When planning, the Session 1 and 2 dates are the most important scientific constraint; the minimum 60 day separation should be implemented only after the Session 1 and 2 constraints are met.

8 BISE Operations Overview 1. LOCATE EQUIPMENT AND UNSTOW - retrieve Light Shield and A31p from stowage location (Neurospat hardware is currently stowed in the Columbus module) - move to the US Lab; hardware is approved to be set up at O6 location; using current PIP, connect to UOP 2. SETUP - secure laptop on Desktop Plate to Multipurpose Bracket - ghost BISE software onto a harddrive; label harddrive as BISEFLT - attach Light Shield frame, Light Shield, Light Shield bracket, Control Pad bracket, and Control Pad - align screen within tunnel - initiate BISE software 3. DATA COLLECTION - put in earplugs (for noise reduction) - secure head strap; complete the OCHART protocol

9 BISE Operations Overview (continued) 4. SECURE DATA - transfer data from laptop to jumpdrive 5. TEAR DOWN* - remove Light Shield from laptop - remove laptop from Multipurpose Bracket and Desktop Plate 6. STOW* - move to stowage location - stow equipment 7. DOWNLINK DATA - copy data to U:/Payloads/BISE for ground to downlink - when the data is copied, OCA will downlink it and send to OC via IFN. OC will create an OCR marked “medically sensitive” and add the data as a Supporting Attachment. POD will approve it with an action to ptocall0 to copy the file from the Supporting Attachments to their local data storage. *Note: Nominally the crew will tear down and stow all hardware after every BISE session; however, if an A31p is dedicated to BISE, the equipment may be left in a deployed configuration (pending CSA and ESA approval).

10 BISE Operations Notes Subjects will select their subject number at the start of the OCHART protocol; assigned subject numbers will be uplinked in a medically sensitive confidential OCA message. No video is required for the software ghosting. The software load is performed one time only, assuming the hard drive ghosts properly and payloads gets to keep it for the duration of BISE operations. The hardware setup needs realtime video; Experiment ops video requirements are for the first session only for Mike Barrett and Bob Thirsk. Video of other crewmembers, and for Mike/Bob’s subsequent sessions, is desired but not required. For experiment ops, live video is needed for the first ~five minutes so the ground team can verify the subject’s body alignment; subject should have only three touch points with the hardware: the head strap, the right hand on the Control Pad, the left hand on the top of the Light Shield Lab camcorder should be oriented such that we can’t see the subject ID on the screen (private). Per PIRN NA-0001B (BISE Protrusion Exception for Stage 15A and subsequent), the BISE setup is approved only in the LAB1O6 location. Note: All video and scheduling requirements are documented in URC and URC shall supersede any information in this Ops Summary.

11 Power Requirements Voltage Requirement 16 Volts DC through a power converter connected to a 120 volts source Current Requirement 2.6 amp max Power Consumption (Heat Load) 72 watts approximately Power Source Utility Outlet Panel (UOP) (see PIP for most current assignment)

12 Additional Notes BISE hardware was flight certified as part of the Neurospat experiment. It's Flight Safety Data Package (ISS17-NES-KIT-207), accepted by Payload Safety Review Panel, will be used as a reference. Since the Canadian Space Agency has not provided the equipment, it will rely on the Certificate of Compliance/Data Certification/Flight Safety Certificate provided by the European Space Agency for the Neurospat Equipment. The BISE Flight Safety Data Package (submitted by CSA) details changes to the configuration and utilization. The BISE team will be supporting real-time operations from the PTOC in Canada; any Neurospat hardware issues will be worked between BISE and ESA. Screen-shots of the BISE software (as the crew will perform the experiment) are provided on the following slide for your information only.

All cancel requests proceed to this screen

14 Acronym List BISEBodies In the Space Environment CSACanadian Space Agency DCDirect Current ESAEuropean Space Agency FDFlight Day FSDPFlight Safety Data Package IDIdentification (not an acronym) IFNInternal Flight Note NASANational Aeronautics and Space Administration OCOperations Controller OCAOn-board Communications Adapter OCROperations Change Request OCHARTOriented Character Recognition Test PIPPlug-In Plan PIRNPreliminary Interface Revision Notice PODPayload Operations Director PSRPPayload Safety Review Panel PTOCPayload Telescience Operations Centre UOPUtility Outlet Panel URCUser Requirements Collection