CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.

Slides:



Advertisements
Similar presentations
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Advertisements

CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Cryogenic discussion and update 30 October 2014Neutrino platform.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
Research Infrastructures The Research Infrastructures in FP7.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
‘’Wisdom is the child of wonder’’ Happy New Year 2014!
CERN LBNE Test Experiment. Plan view of Bat
The meeting in Paris: The agenda has been built and optimized.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
CENF meeting 3-Oct What is going on? WA104 and WA105 still waiting for an official CERN communication, to be treated as any other approved experiment.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
ATLAS micromegas activities (MAMMA)
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
CERN Neutrino Platform 4 th April, 2014 FNAL M.Nessi.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
SPSC113 summary for EATM Lau Gatignon / EN-MEF Open Session:WA104, WA105, RD52, NA62, AEgIS, GBAR Closed Session:Neutrinos, P348, AD experiments, DIRAC,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
STATUS AND PLANS OF ICARUS-NESSIE (part 2 : plans) Carlo Rubbia GSSI, L’Aquila, Italy SPS-C meeting June 25 th, 2013.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Neutrino activities at CERN M. Calviani (CERN) With contributions from M. Nessi, R. Steerenberg, I. Efthymiopoulos, A. Ferrari, P. Sala, V. Venturi, A.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Proposal Preparation. Documents for June PAC  Full Proposal  Starting point is LOI + updates in EOI  Project Definition Report  Cost estimate  Excel-based.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
The CE RN N EUTRINO F ACILITY Marzio Nessi & Rende Steerenberg On behalf of the CENF study/project team LAGUNA, DESY 25 February 2013.
CERN Neutrino Platform 10 th January, 2014 ICFA, Neutrino European Meeting A.Ferrari, M.Nessi, P.Sala.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
Neutrino Projects
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN Neutrino Project 26th November, 2013 M.Nessi.
Baby-MIND for T2K collaboration
nuSTORM: Neutrinos from STORed Muons
EU Institution Board 1 representative of each participating institute
nuSTORM and the Physics Beyond Colliders workshop
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
Presentation transcript:

CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN

Given the still evolving roadmap on long baseline activities in Europe, Japan and US CERN adopted (pragmatical) position is to support, on the short term, generic R&D on  detectors & beams and to support physics related to a short baseline (steriles, cross- sections, calibration, event reconstruction, ….). The goal is to assists and foster collaboration in Europe among the various institutions, independently where a Long and/or Short baseline(s) will be implemented CERN Neutrino Platform 2

Neutrino detectors R&D Logistics + Test Beams Infrastructure (EHN1 ext) Design and eventually implement a Neutrino Beam EU participation in a High Intensity Facility (detectors, beam, infrastr.) PHYSICS Investigate new programs (mu storage ring, betabeams ?, …) It will happen 3

CERN council last week has decided to implement the proposed Medium Term Plan (MTP) which for the first time (since years) contains an important allocation of resources in the next 5 years dedicated to the Neutrino CERN Platform This will cover:  Generic detector R&D including large prototypes  Design and generic R&D on beams  The construction of a new experimental hall dedicated to neutrinos (Nord Area extension : EHN1) with charged test beams capabilities  The reinforcement of various Technical/Scientific groups at CERN (cryogenics, physics, ….) which will support the activities of the platform  The support with detectors and components of the Short Baseline at FNAL  Support to various design/feasibility studies on this field (nustorm, ESS beam, …..) 4

Nord Area EHN1 extension 5

LAGUNA-PROTO NESSiE ICARUS T150 ~64 meters MIND New detectors? + charged beams for all experiments + charged beams for all experiments 6

charged beams layout ( ~0.5 – 20. GeV ) 7

Neutrino detectors R&D CERN Neutrino Platform WA104: rebuild ICARUS T600 in bldg 185 and make it ready for a FNAL beam WA104: R&D on an AIR core muon detector (NESSiE) or eventually integrate a solenoid in the main TPC WA105: R&D on 2 phases large LAr TPC prototypes MIND : R&D on muon tracking detectors LBNF : Test of a LBNE module inside the WA105 cryostat Preparation of 5 MOUs addenda in progress In the pipeline : Argoncube-TPC, Hyper-Kamiokande EU prototypes, new 200t TPC, ……….. 8

Neutrino detectors R&D CERN Neutrino Platform MOUs preparation in progress CERN direct contribution under evaluation: - all logistics aspects (incl. various assembly buildings at CERN !85,182,..) - cryostats (membrane and new ICARUS type) - cryogenics - cleanrooms, civil engineering - services and utilities (CV, EL, Power Suppl., Cooling unit, gas, … ) - controls & DAQ - magnets and B-fields - integration and assembly - host for visiting collaborators (PJAS, fellows, students, scientific associates,..) - special studies (feasibilities, particular techniques, …) - …….. 9

MOU frame How to get in? -Present to the CERN SPSC a LOI or an expression of interest -When approved we prepare together an MOU (addendum) which defines all responsibilities and resources needed -Then a CERN experiment is created (WA104, WA105, …), with all priviledges and requirements 10

5 MOUs are being prepared for signature 11

CERN Neutrino Platform Summary: CERN offers a platform for Neutrino detectors R&D. This platform is now part of the CERN MTP. We will support this platform in an active way and will help WA104, WA105 and others proposals in this initial phase CERN will construct a large neutrino test area (EHN1 extension) with charged beams capabilities, available in 2016 CERN will assist the EU neutrino community in their long term common plans. For the moment CERN is not committing to any neutrino beam at CERN, in view of an agreed road map between all partners 12