Fermilab Neutrino Program Operations Rob Plunkett Fermilab June 24, 2008.

Slides:



Advertisements
Similar presentations
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Advertisements

MINOS sensitivity to dm2 and sin2 as a function of pots. MINOS sensitivity to theta13 as a function of pots Precision Neutrino Oscillation Physics with.
P AUL N IENABER S AINT M ARY ’ S U NIVERSITY OF M INNESOTA FOR THE M INI B OO NE C OLLABORATION J ULY DPF2009.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
The MINOS Experiment Andy Blake Cambridge University.
Neutrinos: Detecting the Invisible!
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
10/24/2005Zelimir Djurcic-PANIC05-Santa Fe Zelimir Djurcic Physics Department Columbia University Backgrounds in Backgrounds in neutrino appearance signal.
Long-Baseline Neutrino Experiment James Strait LBNE Project Director Public Information Meeting May 23, 2013 LBNE-doc-7321.
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
1 SciBar for Booster Neutrinos T. Nakaya (Kyoto) March 30, 2005.
The NOvA Experiment At Fermilab Mark Messier Indiana University 34th International Conference on High Energy Physics (ICHEP’08) Philadelphia, PA July 30,
Newest Results from MINOS Alexandre Sousa University of Oxford for the MINOS Collaboration International Workshop on Next Nucleon decay and Neutrino detectors.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
ICHEP04, August 18, Beijing G.F. Pearce, Rutherford Appleton Laboratory 1 The Minos Experiment G.F. Pearce Rutherford Appleton Laboratory Overview NUMI.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
NuMI MINOS Neutrinos Change Flavor Under Wisconsin Current NuMI/MINOS Oscillation Results Alec Habig, for the MINOS Collaboration XLIII Rencontres de Moriond.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Latest Results from The MINOS Experiment
1 735 km The MINOS Long Baseline Neutrino Oscillation Experiment Jeff Nelson William & Mary Fermilab Users’ Meeting June 6, 2007.
Status of E391a Search for K L    decay G.Y.Lim IPNS, 32nd ICHEP 19 th August 2004 Beijing.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Muon Identification in the MINOS Calibration Detector Anna Holin 05 December 2005 University College London.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
1 Future Short-Baseline Neutrino Experiments Workshop – March 21, 2012 Workshop on Future Short-Baseline Neutrino Experiments March 21, 2012 Fermilab David.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
The Status of MINOS Mike Kordosky University College London for the collaboration.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Mini Overview Peter Kasper NBI The MiniBooNE Collaboration University of Alabama, Tuscaloosa Bucknell University, Lewisburg University of California,
F Detector and Computing Operations Hugh Montgomery DOE Tevatron Operations Review March 27, 2007.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
D. Jason Koskinen IoP Nuclear and Particle Physics Divisional Conference 4/4/ MINOS Neutrino Flux Using NuMI Muon Monitors for calculating flux for.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
20 Oct 2006 HQ&L David E. Jaffe 1 Latest results from MINOS David E. Jaffe Brookhaven National Laboratory for the MINOS Collaboration Argonne Athens Benedictine.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Neutrino Oscillation Results from MINOS Alexandre Sousa Oxford University (for the MINOS Collaboration) 30 th International Cosmic Ray Conference - ICRC.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MiniBooNE: Status and Plans Outline Physics motivation Beamline performance Detector performance First look at the data Conclusions Fernanda G. Garcia,
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Neutrino Beam and Detector Operations Bob Zwaska DOE S&T Review of Scientific User Facilities June 30 – July 2, 2009.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
News and brief overview of Beamline plans for the next few months
Chris Smith California Institute of Technology EPS Conference 2003
Presentation transcript:

Fermilab Neutrino Program Operations Rob Plunkett Fermilab June 24, 2008

June 24-26, 20082FNAL Annual Science and Technology Review Outline of Presentation Introduction to current neutrino program Operations Performance –NuMI Target Hall Systems –MINOS Detectors –Booster Experiments Safety and ES&H Conclusions

June 24-26, 20083FNAL Annual Science and Technology Review Introduction to Fermilab Neutrino Program Fermilab has an active neutrino program, with 3 running experiments (4 detectors) in two beamlines and at 2 sites. MINOS Long-Baseline experiment (140 collaborators) explores atmospheric oscillations scale, using FNAL Main Injector. MinibooNE experiment (80 collaborators) searches for oscillation physics at larger scales and studies basic neutrino interaction physics, using the FNAL booster. SciBooNE (60 collaborators) studies interactions with a precision detector in the Booster Neutrino Beam.

June 24-26, 20084FNAL Annual Science and Technology Review MINOS Collaboration Argonne Arkansas Tech Athens Benedictine Brookhaven Caltech Cambridge Campinas Fermilab Harvard IIT Indiana Minnesota-Twin Cities Minnesota-Duluth Oxford Pittsburgh Rutherford Sao Paulo South Carolina Stanford Sussex Texas A&M Texas-Austin Tufts UCL Warsaw William & Mary

June 24-26, 20085FNAL Annual Science and Technology Review MINOS Data Accumulation RUN IIa 1.23x10 20 POT RUN IIb 0.71x10 20 POT RUN III 1.27x10 20 POT Other running HE beam: 0.15x10 20 POT RUN I x10 20 POT (2006 Publication) Total Delivered to MINOS 4.86 x10 20

June 24-26, 20086FNAL Annual Science and Technology Review NuMI Beamline Layout Magnetic focusing horns Pulsed at 185 kiloamp 60 cm graphite moveable target allows varying beam energies Beampipe filled with He gas, small drop in neutrino yield

June 24-26, 20087FNAL Annual Science and Technology Review NuMI Target Hall Operations NuMI target hall equipment runs reliably in the face of special challenges –High intensity, high radiation environment –Mechanical and thermal shock on target –Thin decay pipe window –Advanced tritium mitigation (dehumidifiers, water control) These systems maintained by specialized groups within Accelerator Division Mechanical Support and External Beams Departments. Changes during shutdown in summer 2007 –Fill decay pipe with He to reduce stresses on window. –Full dehumidification system for target chase air, modeled on successful system for decay pipe walkway. Overall uptime since 4/1/2007-6/19/2007 is 260 days (72%) –Downtimes due mainly to items that are now repaired. Ceramics on horns Completion of target area dehumidification system (now 15-20% R.H.)

June 24-26, 20088FNAL Annual Science and Technology Review Horn Repairs Have had repeated failures of ceramic coupler in horn water lines. 50 days down since July 2007 so far. Improved design based on detailed failure analysis. Were able to replace all such couplers with improved design in horn 2 during Feb. repairs. After current new horn 1 installation, there will be no old-style couplers remaining. No failures on newer couplings so far – problem seems fixed.

June 24-26, 20089FNAL Annual Science and Technology Review June 24-26, 20089FNAL Annual Science and Technology Review NuMI Spares Production of targets and horns lengthy and skill-intensive. We try to avoid using spares when possible. –Example: Horn 2 repair Current inventory –One horn #2 –One target Currently in process of installing only complete spare horn #1. Although critical welds complete on next spare horn 1, months required for final assembly. Might be able (eventually) to repair the horn 1 we are now removing and use as a spare. TargetHorn 1Horn 2 Now Year 211

June 24-26, FNAL Annual Science and Technology Review MINOS Detector Operations Both near and far detectors operate with minimal downtime. Far detector: 96.4% FY07, 97.7% FY08 in absolute time, usually above 99% when beam active. Near Detector electronics and cooling modifications during have further improved already excellent reliability. Magnetic field reversals of Near Detector regularly to minimize cosmic ray and calibration systematics.

June 24-26, FNAL Annual Science and Technology Review MINOS performance graphically Beam on UPS failure – no coverage FY08 Far Detector Ontime by clock Typical ND Weekly performance Averages: Clocktime FD 97.7% (Fiscal Year) Beam on ND 97.3% (last quarter)

June 24-26, FNAL Annual Science and Technology Review MINOS shifts and technical resources Soudan underground –7 FTE (Facility,MINOS, CDMS) –Coverage M-F 7:30-5:00, on-call holiday/weekend daytimes only, except emergencies. Saves funds for constant DNR hoist crew. One 10 hour down-time from this source. (Expect ~1% downtime). Fermilab (WH12NW control room) –24/7 during beam operations + Run Coordinator –4 6 hour shifts, 1 person each shift, 1 hour overlaps –Effective volunteer/draft system. Maintenance and repairs –Far Detector Minecrew (daily) UK DAQ experts (periodic) Physicist shifters when desired/needed + Ops. expert approx. weekly. –Near Detector Local (resident) physicists for electronics repairs ANL engineer/technician support PPD and FESS/Ops mechanical support

June 24-26, FNAL Annual Science and Technology Review ES&H and Safety at NuMI/MINOS No recordable incidents in MINOS areas in past year, one recordable in NuMI Dec. 07. (shoulder strain) Underground areas at Fermilab –Access control by badging, keys and training –Regular housekeeping and annual infrastructure inspections –Pumps inspected/tested monthly Radiation –Strict ALARA plans and remote handling minimize exposure during any repairs –Tritium mitigation by dehumidification, water control

June 24-26, FNAL Annual Science and Technology Review ES&H and Safety at Soudan Laboratory Ad Hoc Soudan Safety Group led by Fermilab Associate Director for Research made recommendations which were acted upon during Joint inspections twice yearly by DNR, Fermilab, U.Minn and Lab Safety manager. –First inspection Feb –“personnel were properly trained and qualified for the work they were doing; work areas were orderly, safe, and conducive to a productive environment”. Cleared Soudan II area of unecessary materials, updated documentation. Changes to command center, railings, walkways. MVS Engineering will perform ventilation studies in October.

June 24-26, FNAL Annual Science and Technology Review 2 National Laboratories, 14 Universities, 80 Researchers The MiniBooNE Neutrino Experiment University of Alabama Bucknell University University of Cincinnati University of Colorado Columbia University Embry-Riddle Aeronautical University Fermi National Accelerator Laboratory University of Florida Indiana University Los Alamos National Laboratory Louisiana State University University of Michigan Princeton University Saint Mary’s University of Minnesota Virginia Polytechnic Institute Yale University SciBooNE Detector

June 24-26, FNAL Annual Science and Technology Review MiniBooNE Running Nov 2003 to June 2008: 1.1E21 POT Anti-neutrino Neutrino Anti-neutrino Collected 7E20 POT. 5.6E20 POT used for the oscillation analysis. Rest were special runs. Collected 2.33E20 POT Absorber problem for ~1E20POT, but data is usable for analysis. Collected 1E20 POT To be added to updated low energy analysis Collected 0.43E20 POT Goal to add another ~2E20 POT by 2009 shutdown.

June 24-26, FNAL Annual Science and Technology Review MiniBooNE Operations 1st Horn died after 95 million pulses. Currently running second horn, with over 150 million pulses, showing no ill signs. Have complete third horn and target ready. Sufficient detector spare parts to run another year, possibly more. Shift burden shared with ScibooNE, will become larger after ending of running of that experiment in Aug –Working on details of remote detector monitoring.

June 24-26, FNAL Annual Science and Technology Review SciBooNE detector SciBar vertex detector –14,336 channels –99.85% hit efficiency for MIP –Used in K2K Electron catcher (EC) –11 radiation lengths –14%/sqrt(E) resolution –Used in CHORUS and K2K Muon Range Detector (MRD) –99% muon hit efficiency –Made from recycled detector components Commissioned in spring 2007 First beam events in June 2007 Won DOE “Closing the Circle” Award and P2 Award for pollution prevention

June 24-26, FNAL Annual Science and Technology Review SciBooNE data progress Collected 1.05 E20 POT in neutrino mode –0.99 E20 POT passing data quality cuts Collected 0.86 E20 POT in antineutrino mode –0.82 E20 POT passing data quality cuts Average detector efficiency 95% Goal is to reach 1 E20 also in antineutrino mode. Will decommission detector beginning August 18 PMTs, electronics, etc. returned to owners –SciBar - Japan –EC - Italy –MRD - US universities and Fermilab

June 24-26, FNAL Annual Science and Technology Review Conclusions Fermilab currently has world’s leading program in accelerator-based neutrino physics. Efficient operation of neutrino production targeting and focusing systems in difficult environments. –Horn problems believed now corrected –Humidity control mitigates tritium and corrosion issues. Production of spare neutrino beamline components challenging. Safe, cost-effective operation of diverse experiments including remote locations. Detectors ready for extended operations.