DEPFET Workshop, Kloster Seeon, May 2015 Mechanics & IBBelle 1 No news on PXD Mechanics in general Cooling blocks for thermal mock up are at DESY 2 more.

Slides:



Advertisements
Similar presentations
Training Presentation
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Basic Refrigeration Cycle
Summery of Cooling System Teflon Leaks* *This is independent of the internal problems Rob Pisani.
Drawer Systems Smart Slide Slidea Smart Box
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
M. Gilchriese Glued Fittings October 5, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.
M. Gilchriese Glued Fittings October 26, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Vacuum system.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
C. Kiesling, 7th Belle II VXD Workshop, Prague, Jan , VXD Cooling Requirements IBBelle Overview Commissioning at CERN (ATLAS version) Software.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Real-Time FOS monitor DEPFET PXD and SVD Workshop in Göttingen E. Currás, D. Moya, I. Vila, A. L. Virto. Instituto de Física de Cantabria (CSIC-UC ) G.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
Kitakami Side AHCAL Assembly or anywhere in any detector.
Lesson 6 Objectives Observe the properties of sliding friction. Measure the force of friction on a wooden block pulled across different surfaces. Measure.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Florian Buchsteiner (HEPHY Vienna)
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
IBBelle: Status & Plans
Status of Cooling Development in Karlsruhe
Status of the CO2 Cooling Project
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Summary of Fuse Testing for Barrel Module Fuse Boxes
IBL CO2 cooling control system development status
Summary of Fuse Testing for Barrel Module Fuse Boxes
Radiation Laboratory Meeting
Recirculating CO2 System
IBBelle: Status Commissioning at MPP Transport to KEK
Phase II Collimators : design status
as a prototype for Super c-tau factory
Neutron guide Shielding Concept
Presentation transcript:

DEPFET Workshop, Kloster Seeon, May 2015 Mechanics & IBBelle 1 No news on PXD Mechanics in general Cooling blocks for thermal mock up are at DESY 2 more blocks delivered (no surface treatment, for pressure tests) 8 more blocks in work (with surface treatment) Some issues with electrical resistance between blocks (see next slides)

DEPFET Workshop, Kloster Seeon, May Cooling Blocks For proper grounding: R < 0.5  between blocks (translates into < 1  for half shelf) 1 st shelf: 0.6  2 nd shelf: 1  Some variations (aging?) observed (2.9  => 3.6  in 9 months for one tube) Electrical connection between blocks: 4 carbon tubes (also for air cooling) Al coated Connected to block via silver loaded Epoxy and silver loaded paint

DEPFET Workshop, Kloster Seeon, May Thermal Cycling Thermal cycling -40°C - +50°C No dramatic changes, but slight increase of resistivity, seems to saturate…

DEPFET Workshop, Kloster Seeon, May Irradiations Neutron irradiations: 2x10^12n/cm²: no or only slight changes (but some tracks broken) Gamma Irradiations: 130kRad (Co60): slight increase of resistance (200  -> 250  )

DEPFET Workshop, Kloster Seeon, May Test setups Spring loaded contact has best conductivity and does not rely on conductive paint Need to modify cooling blocks to integrate spring tube (to be studied) Bare tube: ~0.8  ~7.1  ~4.5  ~40 M  k  ~1.3 

DEPFET Workshop, Kloster Seeon, May 2015 IBBelle 6 Original plan: copy IBL unit, assembly in a 40’ container However: no space in Tsukuba hall, extra building too expensive => Use only one unit to fit in 20’ container and in Tsukuba hall Sven.Vogt Tel.:

DEPFET Workshop, Kloster Seeon, May 2015 IBBelle for VXD option: add 2 nd unit later 7 CO2 base frame für 1 Einheit

DEPFET Workshop, Kloster Seeon, May 2015 Akku Unit 8 Heat exchanger re-designed Akku ordered Frame in work

DEPFET Workshop, Kloster Seeon, May 2015 Chiller Unit 9 Chiller ordered Frame in work

DEPFET Workshop, Kloster Seeon, May 2015 CO 2 Unit 10 Pumps delivered (2 sets) Frame is ready Assembly about to start

DEPFET Workshop, Kloster Seeon, May Control Cabinet Cabinet ready Next: cabling

DEPFET Workshop, Kloster Seeon, May 2015 IBBelle base frame 12 Adjustable feet Can be put on wheels (bogies)

DEPFET Workshop, Kloster Seeon, May IBBelle base frame Frame assemble Wooden panels ordered Next: put Cabinet and frames in poition

DEPFET Workshop, Kloster Seeon, May 2015 Weight: ~ 4t 14 ca. 600kg ca.400kg ca.800kg ca. 500kg ca. 1000kg Crane at KEK: max load 4.5t + 25% (include support lever!)

DEPFET Workshop, Kloster Seeon, May 2015 Other components 15 -Manifold Boxes -In work

DEPFET Workshop, Kloster Seeon, May Junction box -In work

DEPFET Workshop, Kloster Seeon, May 2015 Components for flex tubes 17 Dismountable & rotatable concentric joint (at manifold) - In work

DEPFET Workshop, Kloster Seeon, May Components for flex tubes Split (in-flow and return) at Belle side - In work

DEPFET Workshop, Kloster Seeon, May 2015 Flex Lines 19 Need to decide where to produce CERN willing to help But need manpower To be discussed Material can be ordered once exact length is known

DEPFET Workshop, Kloster Seeon, May 2015 Location at KEK 20 Old PS, will be removed Ok for IBBelle New PS Can these pillars/tubes be removed for 2 nd unit?

DEPFET Workshop, Kloster Seeon, May Thanks