Straightforward Innovative Energy Savings. 2011 Renovation In 2011 Harvard University completed a comprehensive interior renovation of the 105,000 square.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

XEnergy Technologies Energy Efficiency Through Creativity.
Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Comparing New Building Pre-Construction and Post Occupancy Energy Models with Actual Performance 2014 CA Higher Education Sustainability Conference – Session.
Make the most of your energy Head Office – Case Study.
Use of Operational Data for diagnosing symptoms and optimizing HVAC operation at Zero cost Presented by: Hemant Mehta, P.E. March 30, 2010.
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
Chilled Beam Presentation
E People and ideas you can trust. TM ©2014 Daikin Applied Seasonal Equipment Operational Considerations Joe Leichner, Daikin Applied Strategic Sales Project.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Presented April 16, 2009 at the ACG Annual Meeting in Chicago, IL. GAYLON RICHARDSON Engineered Air Balance Co., Inc. Houston, Texas 5/7/20151.
Presenters: Bob Kilgore Matthew McReynolds Brenna Goode CHEMISTRY BUILDING RCX.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Energy Saving DDC Control Strategies
NARAGHI HALL 3 rd FLOOR VENTILATION MANAGEMENT IMPROVEMENT BEST PRACTICE AWARD HVAC DESIGN/RETROFIT 2014 CALIFORNIA HIGHER EDUCATION SUSTAINABILITY CONFERENCE.
Energy Management with the use of an Intelligent Building Management System.
Integrating a Saving Energy controller in Existing Air Condition units Case Study.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Deep retrofits: You get what you pay for Leslie Kramer, Stanford University and Jonathan Schoenfeld, kW Engineering June 17, 2014.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
LEED: LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN Gibbs INTD 153 Design Studio I.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
Phoenix Convention Center Phoenix, Arizona Targeted E4 Re-Tuning at GSA Facilities Integrated Energy Low/No Cost Solutions through Building Automation.
Solar Panels are Solar power is the conversion of sunlight into electricity.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Overview of Data Center Energy Use Bill Tschudi, LBNL
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
The American Recovery and Reinvestment Act: A NIH Overview.
HEATING AND COOLING SYSTEMS
Sustainable Laboratory Design: Challenges and Solutions
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Green Server Room Construction Primary concerns when building a server room is size and cooling. Size can be diminished with the use of virtual servers.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Heat Pump Water Heaters: Interior, Ducted Installations Presentation to the Regional Technical Forum December 13, 2011 Ben Larson, Ecotope
FACT SHEET Heilbronn Mall - Stuttgart Reduction in Cooling Energy achieved. Less Chiller running Hours. Reduction in Heating Energy. Carbon reduction achieved.
Earth Materials Lab Explanation. Why did water take so long to heat? Water has an important property. It takes five time more heat energy to raise an.
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
Albert Sherman Center Achieving Predicted Energy Use March 15 th, 2016 Presented By: Fran Boucher, CEM – National Grid Suzanne Wood – UMass Medical School.
ENERGY SAVING AND EFFICIENCY OF AIR CONDITION & LIGHT SYSTEMS AT PUBLIC BUILDINGS Meitav-tec (Contel group)
Sean Weber Energy Engineer
Book E3 Section 1.4 Air-conditioning
Objectives Talk about the final projects Discuss HW2 and HW3 problems
RSENR Buildings Energy Use Following Efficiency Upgrades
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Story of No-Cost Energy Savings at Ohio Union
PERFORMANCE EVALUATION Economizer Enthalpy Sensors
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Eastern Pennsylvania Laboratory Facility
Placement Considerations
Chilled Beam Performance:
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
UCSD Building Automation and energy saving measures
Presentation transcript:

Straightforward Innovative Energy Savings

2011 Renovation In 2011 Harvard University completed a comprehensive interior renovation of the 105,000 square foot Sherman Fairchild building. The work took place over a two year period and created new laboratory space for the recently formed Stem Cell and Regenerative Biology (SCRB) department. The project included many energy savings designs and earned a LEED Platinum certification.

LEED-CI v3 Platinum The project achieved LEED-CI v3 Platinum certification in March 2012, and was tied with a project in Hong Kong for the highest number of LEED-CI points achieved by any project in the world. (and the highest for any LEED-CI lab).

FY14 Actual Energy Cost

FY14 Actual Energy Use

Innovative System Modifications 1.Reduce Lab Air Change Rates (ACH) 2.Heat Shift Chiller Adjustments 3.Supply Air Dew Point Reset 4.Static Pressure Resets 5.Room Temperature Set Points 6. Minimizing Equipment Runtime

Reduce Lab Air Change Rate (ACH)

Heat Shift Chiller A Chilled Water Savings of $35,000 (with no additional electrical costs)

Dew Point Reset A dew point reset schedule allows the discharge air set point to travel between 52.5 and 60 degrees

Static Pressure Reset Static reset at the EF’s is based on the MAX damper position of the exhaust boxes. Static reset at the AHU’s is based on the MAX damper position of the supply boxes.

Additional Strategies Minimizing Equipment Runtime Room Temperature Set Points

FY15 Actual Energy Costs

FY15 Actual Energy Use

FY16 Actual Energy Use

FY15 Energy Use Summary

Thank You!