1 LBT Q1 2009 Eng/SW Review PLMG: Plumbing, Chiller Systems.

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Copyright © Texas Education Agency, All rights reserved. Basics of HVAC.
Air Conditioners and Heaters
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Technical Seminar on Refrigeration & Air Conditioning
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Heat and cold generation Meyer Hospital Florence Meeting, 8-9 May 2003.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Lecture 30 Heat Pump Systems.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Chilled Water Systems Total Cost of Ownership
A Trane Air Conditioning Clinic Centrifugal Water Chillers Air Conditioning Clinic TRG-TRC010-EN © American Standard Inc
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
ROUND THE WORLD ROUND THE CLOCK v2a – S&S EaA External 28-Mar-2006 DMA Fuel Change-over and MGO Cooling System For Retrofit and Newbuilding REV
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
N O R T H A M E R I C A C O M M E R C I A L TDP
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
Objectives - Finish with pumps and plumbing example - Learn about district cooling and heating systems.
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
LBT Q Eng/SW Review MCSC – Mount Control System.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
Second Nature ® Compact Chiller Leading the way in secondary coolant refrigeration systems. SNCC.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Free cooling on RTAF Chiller
1 Summer Training On Refrigeration and Air Conditioning From:-Amber Enterprises PVT.LTD.
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
Rack Refrigeration Systems ©2015 Master-Bilt Products, an unincorporated division of Standex International Corporation. All rights reserved.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Mine Air Conditioning MINE PORTAL TEAM
WSHP Systems 1.
Lecture Objectives: Learn about thermal storage systems
GROUND SERVICING OF VARIOUS SUB SYSTEMS
10 12 and 14 TR Advanced Glycol Chiller
Book E3 Section 1.4 Air-conditioning

Desuperheater Heat Transfer Device Manufactured by Maniks
Maniks Desuperheater for Refrigeration application
Lecture 30 Heat Pump Systems.
Mikkelin university of applied sciences Building services
Presentation transcript:

1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems

2 Highlights (Q1/2009) Both utility building chillers have leaks in the condensing coils, arranged for replacement Q2 Both utility building chillers have leaks in the condensing coils, arranged for replacement Q2 The utility chiller freon charge has been leaking The utility chiller freon charge has been leaking Winter and summer chillers were reset back to factory settings and have been working well since Winter and summer chillers were reset back to factory settings and have been working well since Utility building chillers were also reset to factory settings, however, we have had problems ever since Utility building chillers were also reset to factory settings, however, we have had problems ever since

3 Open Issues Technical Technical Chill water system needs review Chill water system needs review Variable viscosity Variable viscosity Expansion and contraction with temperature Expansion and contraction with temperature Restrictions Restrictions Schedule Schedule Verify and monitor operation Verify and monitor operation Keep up with PM’s Keep up with PM’s Financial Financial Utility building chiller coil replacement: $24K Utility building chiller coil replacement: $24K Installation of valve in by-pass : $2K Installation of valve in by-pass : $2K Resource Resource Consultant needs to be located/ need engineering support Consultant needs to be located/ need engineering support

4 Planning (Q2/2009) Insulate closed cycle compressor chill water lines   Consult about operation and options to improve   Replace utility building condensor coils   Improve operation and reliability of the utility building chillers   Install valve in 45 deg F loop by-pass