INSTALL INSULATION IN BOILER PLANT PROJECT 438-13-125 SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC.

Slides:



Advertisements
Similar presentations
Our World is Water Water treatment in container – with guarantee for quality and performance EUROWATER.
Advertisements

Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Proposed Modifications in Boiler Feed Tank By: D K Singhal
Chapter 11, Section 4. Changing a Shower Head 1.Turn off the water. 2.Remove the old showerhead. 3.Clean the showerhead stem of any corrosion or buildup.
Multi-piece Installation Instructions SAFETY WRAP.
EARTHEN PONDS LAKES & RESERVOIRS
First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, Eliminated need for concrete thrust blocking Case History:
Student Book © 2004 Propane Education & Research CouncilPage Installing Corrosion Protection Systems for Underground Tanks & Metal Distribution.
McElroy Mine Shaft Explosion Investigation Summary This presentation is for illustrative and general educational purposes only and is not intended to substitute.
HVACR312 - Refrigeration Metering Devices.
Bench Testing, Maintenance, and Troubleshooting.  Identify three primary steps in bench testing a helitorch.  Identify six considerations in maintaining.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
PROJECT AND STUDY DRAWINGS & DIAGRAMS
Painting An LNG Tank Important Processes To Follow! Painting An LNG Tank Important Processes to Follow William Donald Director Of Field Operations Tank.
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
The art of Engineering
Atmospheric Corrosion NiSource Exposed pipelines.
Water Supply.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Why Choose Vinyl? See the benefits of energy-efficient vinyl windows and doors in many different applications.
Engineering Technology Division
NFPA 31 Standard for the installation of Oil- Burning Equipment
Inside the Boiler! Boiler Tubes Detail of bottom of boiler tubes.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
Team Yellow. Experiment 3 IRI Economics FCI and Annual Costs FCI is $4.63 million Annual product cost is $104 million Annual cash flow is -$77 million.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Confidential & Proprietary -1- Upcoming Cold Projects Distrigaz LNG Terminal in Boston, MA Sabine Pass LNG.
1 Pressure Reducing valves. 2 3 Fill Valve / PRV Pressure Reducing Valve.
Time Remaining 20:00.
Payback time! 1. Lesson objectives  understand methods to reduce energy loss from the home.  understand how these methods work (the keyfacts).  understand.
The Benefits of Section 63 Siobhan Wolverson Senior Environmental Planning Consultant VG Consulting.
Article III: Workshop Topics. Consumer Items Concessions shall be permitted to only sell goods meant for human consumption.
“Beyond the loop layout”.  Jeremy Neven, C.B.C.O. ◦ Chief Building Official ◦ Plumber ◦ HVAC Designer ◦
05/22/021 REMOVAL TECHNIQUES O Application and use of wet removal methods O Procedures and equipment for removal of sprayed and troweled on asbestos materials.
Greenhouse Management
Effluent from a septic tank effluent gravity (STEG) or septic tank effluent pump (STEP) system is discharged into a collection system. A typical STEP/STEG.
West Melbourne Lease Requirements
Describe how heat is transferred by conduction and convection.
Global Exotics Board Replacement
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
INSULATION FOR INDUSTRY AND HOUSING
What is Desuperheater Water heater and its Applications?
Maser Cable Training Level 1
Measure Hose as 14”, 12.5”, 12.25”, 9” & cut it.
Hot Water Systems Cylinders and Systems.
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Coating Failure at a Gas Compressor Facility
Boiler house and changing rooms refurbishment
Piping Flow Maintenance
Laboratory: A Typical Evaporation Process
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
EcoTech Heating and Controls LTD Wood Pellet Cooker/Boiler Install
Proposed Replacement of 8800PPH Steam Boiler ( )
Engine Top End Construction
PROJECT.
Thank You For Purchasing Coeur Designs 11” Shower Extension
PROJECT.
SC1R Cold Box PDR Assembly Sequence
What about −(−6) ? What quantity is in the box?.
Presentation transcript:

INSTALL INSULATION IN BOILER PLANT PROJECT SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC

VALVE JACKET SECTION REMOVABLE Quantity = 8 Each

Area 1A

Area 1C 6 Each – Valve Jackets to be installed

Area 1C

Area 1D

BOILER REFRACTOR JACKET SECTION REMOVABLE Quantity = 3 Each

Boiler Refractor Jacket 3 Each – Boiler refractor jackets to be installed

Removable Refractor Jacket SIGHT GLASS SHALL REMAIN OPERATIONAL

Refractor Jacket 12” JACKET OVERLAP ONTO BOILER TANK

PIPING INSULATION / PVC SECTION

TYPICAL SPOT WHERE PVC WRAP CAN BE INSTALLED OVER EXISTING INSULATION

TYPICAL AREA WHERE INSULATION NEEDS TO BE INSTALLED PRIOR TO PVC WRAP. MATCH EXISTING THICKNESS TYPICAL AREA THAT WILL NEED PVC INSTALLED OVER EXISTING INSULATION

TYPICAL AREA WHERE INSULATION NEEDS TO BE REPLACED PRIOR TO PVC WRAP

TYPICAL SPOT WHERE INSULATION NEEDS TO BE REPLACED PRIOR TO PVC WRAP

TYPICAL SPOT WHERE ONLY PVC IS REQUIRED OVER EXISTING INSULATION

TYPICAL BARE PIPE LOCATION WHERE INSULATION IS REQUIRED PRIOR TO PVC WRAP TYPICAL LOCATION WHERE PVC WRAP IS REQUIRED. INSULATION IS IN GOOD CONDITION TYPICAL LOCATION WHERE EXISTING INSULATION NEEDS TO BE REPLACED PRIOR TO PVC WRAP

TYPICAL BARE PIPE LOCATION WHERE INSULATION NEEDS TO BE INSTALLED PRIOR TO PVC WRAP TYPICAL LOCATION WHERE ONLY PVC WRAP IS REQUIRED

TYPICAL AREA WHERE INSULATION NEEDS TO BE REMOVED AND REPLACED WITH NEW AND THEN PVC WRAP INSTALLED

Area where at least 8 feet of insulation shall be replaced as it is damaged on top