Michael Hopkins, P.E., Assistant Chief, DAPC Andrew Hall, Permit Manager, DAPC.

Slides:



Advertisements
Similar presentations
NANPA Oversight Working Group Report to the NANC October 17, 2000 Co-Chairs Pat Caldwell & Karen Mulberry.
Advertisements

Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
Michael Hopkins, P.E., Assistant Chief, DAPC. GP Development PBR Updates Other Updates Short BAT History 10 ton/yr BAT.
Michael Hopkins.  All DO/Laa’s hooked up to weblink?  Ask questions  Issues scribe needed for meeting  Will record meeting so others can view 2.
Michael Hopkins, P.E., Assistant Chief, DAPC ,
E-Document Management/e-Content Management (ECM) Mike Ahern & Bob Hodanbosi September 19, 2011.
Air Quality and SIP Update Ohio EPA DAPC Air Program Workshop December 7, 2010 Robert Hodanbosi, Chief, DAPC Jennifer Hunter, Manager, DAPC SIP Section.
Journal of Social Work Education Editor in Chief S usan P. Robbins, Ph.D., LCSW UNIVERSITYofHOUSTON.
VETERANS OF FOREIGN WARS Subscription Dues Training&Implementation.
Time Frame of Production
Floor Plan October November Early 2013 August September July Map Connections Develop Requirements/Order Equipment Deploy/Test.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
C&DD Financial Assurance Cost Estimating An introduction to using the FACE tool May 21, 2012, OEPA, SWDO May 31, 2012, OEPA, CO and SEDO June 4, 2012,
Dispersion Modeling Jim McGraw Program Development Supervisor.
REGION V CRC 2009 hosted by Akron - Canton Chapter Cleveland Chapter #038 Report.
BACKLOG ISSUES State of Delaware Division of Corporations Executive Strategic Planning Conference October 13-15, 2004.
Strategic Capacity Planning Defined
An Innovative Partnership For Regulatory Permitting City of Seattle and US Army Corps of Engineers Joy Keniston-Longrie, Seattle Public Utilities, City.
EXPERT DOCUMENT SOLUTIONS FOR YOUR BUSINESS EXPERT DOCUMENT SOLUTIONS FOR YOUR BUSINESS.
Air Pollution Grab Bag. Middletown Coke Produce coke from coal which will be used by AK Steel to produce iron Facility will have 100 ovens and produce.
Figure 1.1 Basic components of a simple computer system © 2003 Brooks/Cole Publishing / Thomson Learning™
Chapter 6 Prototyping, RAD, and Extreme Programming
Chapter 8 Prototyping and Rapid Application Development
Title V Site Operating Permits (SOPs)
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 8 SUPPLY CHAIN MANAGEMENT.
Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: November 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
Technical Account Management & Customer Profile Management
Research Support Services UCH Facility Use Approval Workflow Management Update Jennifer Holcomb.
Indiana Environmental Health Summit Indiana Department of Environmental Management (IDEM) June 6, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner,
Chapter F.A.C. Updates Solid Waste Program.
1 Copyright © 2008 Thomson South-Western, a part of the Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under.
Chapter 2 Basic Managerial Accounting Concepts
Utah State Engineer Where Do We Go From Here? (and how are we going to get there?) Kent L. Jones, P.E.
Information Systems for Managers By Prof. Brinda Sampat
Economy Specific Research and Introduction of Successful Results of New / Renewable Energy Technology Development and Demonstration Toru Usami International.
1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates.
Andrew Hall, Permit Manager, DAPC.  Statistics on current installation permit status  Installation Goals for 2012  Statistics on current operating.
Analyzing Section Demographics Matthew J. Angiulo Western Region Deputy Director, Membership August 15 th, 2013.
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
Lori Hanson Title V Operating Permit Supervisor (515)
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Characteristics of a Good Calculation Program Presented.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Chapter 6 Prototyping, RAD, and Extreme Programming Systems Analysis and Design Kendall & Kendall Sixth Edition.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Variables Skills and Processes. Maryland Science Content Standard Students will be able to give reasons for the importance of waiting until an investigation.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
GSA Meter Installation Date of Meeting: 5 October 2012 Title of Meeting:AOC Utility Invoice Analysis kick off meeting Place of Meeting:Capitol Power Plant.
Federal Aviation Administration Clarification to Policy and Procedures Concerning Use of Airport Revenues; Proceeds from Taxes on Aviation Fuel Presented.
Analyzing Section Demographics Matthew J. Angiulo Western Region Deputy Director, Membership August 7 th, 2014.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
1 Underwriting 101 (Basic Overview, Rule Changes, Updates, Forms) Rita Dockery, Corley Audorff, & Michael Vaughn (Walker & Dunlop) The Office of Residential.
Voluntary Action Program Updates Certified Professional Coffee February 24, 2016.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Updates from Ohio EPA DAPC
Southwest Ohio Air Quality Agency Cincinnati, Ohio
Journal of Social Work Education Former Editor-in-Chief Susan P
ICIS-NPDES Defining What We Need
Chapter 8 Prototyping and Rapid Application Development
How to sign up for the Case Western Reserve University Electrochemical Society Student Chapter (CWRU ECS)
Tom Clark Vice President, Customer Service & Service Area Development
Chapter 12: Software Support and Maintenance
Skills Practice pg 265 – 270 A relation is a set of ordered pairs while a function is a special type of relation where each input has one unique output.
Presentation transcript:

Michael Hopkins, P.E., Assistant Chief, DAPC Andrew Hall, Permit Manager, DAPC

Newburgh Steel Works, Cleveland circa 1893 Case Western Reserve Historical Society

 Statistics on current installation permit status  Installation Goals for 2011  Statistics on current operating permit status  Operating Permit Goals for 2011

 Reviewed data from Stars2 from November 2009 through October 2010  Looked at issuance of installation permits including GPs, PBRs, PTIs, PTIOs  Looked at the current workload of installation permits

 690 PBR accepted  13.5 days average processing

 8 % install permits issued were GPs  Issued 42 GP  29.7 days average processing

 506 Installation permits (GP & Non)  Included 1152 EUs  ~2 EU per Installation Permit  avg OEPA days  avg Total days

 Reduce workload to “no backlog” level  Reduce number of “old” permits  Meet 14-day Completeness review goal  Continue timely processing of CO reviews  Further develop high priority “high communication” process  Process Section Manager identified high priority permits using “high communication” process

 Tracked through Stars2 Report  Mgmt Reports…  Permits Status…  DO/Laa: select one  Types: PTI & PTIO  Reasons: Initial Installation & Chapter 31 Mod & Not Yet Assigned

DO/Laa Current Installation Workload* and 2011 Goals DO/LaaCurrent Workload“Old” Permits*2011 Goal 01 – CDO NEDO NWDO Toledo SWDO SEDO Portsmouth RAPCA Cleveland HAMCO Canton Akron9110 Total *As of November 26, 2010, Old = DO/Laa/CO workflow >180

 Continue current practice of limited review and rapid turn-around (CO goal)  Develop guidance concerning when the “high communication” process is to be used, the processed used and a revised fee procedure (CO goal)  Develop guidance concerning processing of “old” permits

 NSR Permits: Number of applications rec’d for Initial Installation/CH31Mods are variable but follow historic trends  Title V Permits: fixed number  FEPTIO: fixed number  PTIO: fixed number or decrease

Input + Generation – Output – Consumption = Accumulation  Input: applications received  Generation: splitting of applications  Output : permits issued  Consumption : facility shutdowns  Accumulation : permit buildup within the system

DO/Laa Title V Facilities, 2010 Issuance* and 2011 Goals DO/LaaTitle V Facilities2010 Finals Issued2011 Goal 01 – CDO NEDO NWDO Toledo SWDO SEDO Portsmouth RAPCA Cleveland HAMCO Canton Akron2435 Total *Final Title V permits issued as of November 26, 2010

 Initial Title V  Renewal Title V (Expired or Extended)  Sig Mod (9 month goal)  MPM (90 day goal)  APA  Off Permit Change  See TOPs Report, STARS2 Management Reports

DO/Laa FEPTIO Facilities, 2010 Issuance* and 2011 Goals DO/LaaFEPTIO Facilities2010 FinalFEPTIO2011 Goal 01 – CDO NEDO NWDO Toledo SWDO SEDO Portsmouth RAPCA Cleveland HAMCO Canton Akron69714 Total *PTIO Renewal with “Draft/Final Issuance” as of Nov. 26, 2010

DO/Laa PTIO Facilities, 2010 Issuance* and 2011 Goals** DO/LaaPTIO Facilities2010 PTIOs2011 Goal 01 – CDO NEDO NWDO Toledo SWDO SEDO Portsmouth RAPCA Cleveland HAMCO Canton Akron Total *As of Nov. 26, 2010 ** Based on 10-yr Renewal Cycle

 Report Tree (Permit Classification): to identify facility classifications  Expiration Report: identify expired permits within selected time frames  Workload Trend Report: shows month-by- month permit applications rec’d/permits issued

 Questions?