Overview of the Inc 27-28 Experiments supported by CADMOS Alain MAILLET.

Slides:



Advertisements
Similar presentations
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Advertisements

May Melissa Albo #1 Sagrario Casillas #4 Angela Durán #8 Daniela Martínez #16.
Scott K. Powers Edward T. Howley Theory and Application to Fitness and Performance SEVENTH EDITION Chapter Copyright ©2009 The McGraw-Hill Companies, Inc.
Scott K. Powers Edward T. Howley Theory and Application to Fitness and Performance SEVENTH EDITION Chapter Copyright ©2009 The McGraw-Hill Companies, Inc.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
Lesson 2 - Hardware on the Inside
Computer and Information Science Ch1.3 Computer Networking Ch1.3 Computer Networking Chapter 1.
Center for Surveillance, Epidemiology, and Laboratory Services Division of Health Informatics and Surveillance José Aponte Public Health Advisor Companion.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Dept. Of Applied Medical Sciences Medical Equipment Program Huriamila Community College King Saud University 1428 / 1429 Introduction to Medical Equipment.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Overview of the Inc Experiments supported by CADMOS Hélène RUGET - Maurice MARNAT.
UPOWG#23 – Huntsville Feb D SPACE Mental Representation of Spatial Cues During Spaceflight.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
Date: September 24, 2007 Allen Taylor/TBE/FD35 Page: 1 HPA Hand Posture Analyzer Hardware Setup KAYSER ITALIA SRL Piazza 185° R.A. Folgore, 2/ Livorno.
1 POIWG #38, July 2015 POIWG #38, July 2015 BIOTESC USOC, Switzerland Martin Haag & Jeannine Winkler BIOTESC
Payload Operations Integration Working Group (POIWG) Jan th, 2011 Human Research Program (HRP) Blue Bradley Human Research Program (HRP) Lyndon B.
PLOT Sept. 2, 2009 Human Research Program (HRP) Stuart Johnston Muscle Atrophy Research and Exercise System (MARES) Rack Flight Activity: launch of the.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Biomarkers of Oxidative and Inflammatory Stress and the Risk for Atherosclerosis in Astronauts during and after Long-Duration Spaceflight Human Research.
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
1 Hardware Overview & Task Training 2013Martin Bost / Erik Hougland Pulmonary Function System Lyndon B. Johnson Space Center Human Research Facility Pulmonary.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
Payload Operations Integration Working Group (POIWG) February 3-5, 2009 Human Research Program (HRP) Marc Perry HRP Increment 19/20 Overview Increment.
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
Increment 13 Payload Operations and Integration Working Group (POIWG) ESA Long Duration Mission (LDM) Payloads February 1, 2006 George Norris Increment.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
PRO 232 Date: August 2011 Page: 1 MELFI PCS Displays PRO 232 November, 2014 – Rev I Form FD (Rev 3/8/04)
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
CADMOS-POIWG#31 I Jan , 2012 I Huntsville POIWG #31 – Jan , 2012 Stéphanie HERR - Alain MAILLET Overview of the Experiments supported.
ISS Medical Program (ISSMP) Inc. 39/40 Training Strategy Team (TST) Sondra Fabian Inc. 39/40 Training Coordinator May.
Lisa Prendergast EO20/ Operations Lead January
Microgravity User Support Center (MUSC) Payload Overview POIWG, July Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
Payload Operations and Integration Center MSFC Daily Summary for PDs.
Holter Monitor 2 Bioastronautics Flight Research Program Johnson Space Center, Houston, TX 1 Holter Monitor 2 Training Presentation Alonso Fuentes Hardware.
Human Research Facility HRF Ultrasound Training 1 Neil Travis Johnson Space Center 2010 HRF Ultrasound Training Instructor:Neil Travis
POIWG#30 E-USOC Operations in Increment José Miguel Ezquerro Navarro E-USOC/UPM July, POIWG #30, Hunstville, AL.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
CADMOS for ESA Inc 25&26 supported activities Maurice MARNAT CADMOS - CNES POIWG #28: July 27-29, 2010.
Bodies In the Space Environment (BISE) Operations Summary Prepared by Amy Jupin Operations Lead EO
Damec Research Aps POIWG Meeting, July 2011 Upcoming Damec Operations by Thomas A. E. Andersen 1.
POIWG #32 – Jul , 2012 François NUYTTENS – Cécile THEVENOT Overview of the Inc Experiments supported by CADMOS.
CADMOS Expt & P/L Support_POIWG#35 I 28-31/01/2014 I MSFC, Huntsville January 28-31, 2014 Alain MAILLET CADMOS Payloads & Experiments Support - Inc 39.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
Damec Research Aps POIWG July 2008 CARD Long-term microgravity: A model for investigating mechanisms of heart disease and sympatho adrenal activity during.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
POIWG Jan , 2013 Stéphanie HERR - Alain MAILLET CADMOS HIGHLIGHTS – Incr 35&36.
Theo Jesberger. Activity tracker that will help our clients easily keep track of their fitness and weight loss goals. Keeps track of steps, distance,
Introduction to Computers
Investment Detail Budgetary Quotes.
Presentation transcript:

Overview of the Inc Experiments supported by CADMOS Alain MAILLET

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 2 CADMOS Ops Leads Team Ops LeadExperiments Hélène RugetDOSIS, SOLO, NEUROSPAT, EPM, CARD, PASSAGES, MARES Cécile ThevenotSOLO, DOSIS, CARD, EPM, PASSAGES Stéphanie HerrCARD, PASSAGES, NEUROSPAT, SOLO, 3D SPACE, MARES Maurice MarnatPASSAGES, NEUROSPAT, 3D SPACE François NuyttensSOLO, NEUROSPAT, MARES Nicolas SprengerDOSIS Alain MailletSOLO, 3D SPACE, CARD, DOSIS, EPM, MARES  2 new persons CADMOS in 2011 that will enter the process Stéphanie Nicolas Maurice François Hélène Cécile

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 3 Increment (Inc 29-30) CARD: Investigating Mechanisms of Heart Disease (support to DAMEC) 3D-SPACE: Mental Representation of Spatial Cues During Spaceflight SOLO: Sodium retention in microgravity PASSAGES: Scaling Body-Related Actions in Absence of Gravity IMMUNO: Neuroendocrine and immunological changes NEUROSPAT: Prefrontal brain functions and spatial cognition MARES: Commissioning part 2 SARCOLAB: Myotendinous and Neuromuscular Adaptation to long-term Spaceflight: Determinants and time courses. EPM maintenance: Video Unit Replacement BDC only: EDOS: Early Detection of Osteoporosis in Space (ground only) SPIN: Centrifugation, static tilt and orthostatic tilt tests (ground only) “Specials”: DOSIS: Dose Distribution inside ISS (support to MUSC) ICV: Integrated Cardiovascular (support to NASA-ICV for Cardiopres) VESSEL IMAGING: Vascular Imaging (support to DAMEC) Experiment Support

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 4 Science overview Experiment that intends to test: 1.How the cardiovascular system adapts to prolonged weightlessness and whether the arterial resistance vessels are chronically dilated in space. 2.Whether there is a mismatch between the level of sympathetic nervous activity and dilatation of these vessels. Main Hardware Pulmonary Function System (Cardiac output - DAMEC) CDL Holter Arterial BP Equipment (24h BP measurements - CADMOS) – FM Spare/41P Blood Sample Kit, ESA Urine Collection Kit (CADMOS), HRF-2 RC and MELFI Subjects (6 desired, 8 preferred) Inc 26-27: P. Nespoli (prime - #7), C. Coleman (Reserve #8 – pending urine collection feedback) Inc 28-29: S. Furukawa (Prime #9 – if CC not performed, will be the last subject) Implementation 1 in flight session per subject, preferably after 3 months on-orbit, minimal 2 months. Crew time Day 0: 10 min (CDL Holter batteries insertion) Day 1: 175 min ( EPM laptop activation for Holter configuration, PFS S/U, Holter S/U, Start of 24hr urine collection, 3 PFS measurements, Holter data saving) Day 2: 240 min (Blood collection, RC, MELFI insertion, end of urine collection, urine sampling and MELFI insertion, 2 PFS measurements, Holter data saving, stowage) Data Holter data / Urine Log stored on PCMCIA card – downlink to ground via EPM Photo / Video Video of one rebreathing session CARD

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 5 Science overview Stand-alone experiment : the subject is immerged in a virtual environment while free floating. Software Tasks : drawing, distance, illusion Main Hardware Laptop, head mounted display, trackball, digital tablet and pen, Ultrabay Hard Disk, PCMCIA card Subjects (Requirement after Mid term review: 8 subjects) Inc 26-27: Paolo Nespoli #7, Catherine Coleman #8 (On Going) Inc 28-29: Mike Fossum #9 (pending PN and CC results, if successful MF won’t be performed – end of experiment) Implementation 4 to 5 sessions per subject Crew time Installation: 15 min Experimental session: 30 min Stowing : 15 min +10 min for OCA transfer during the last session Data Data stored on PCMCIA card – downlink to ground via OCA then TSC/Web Mirage Photo / Video 2 Photos/session are desired for evaluation of subjects head and body position during free-floating Mental Representation of Spatial Cues During Spaceflight 3D-SPACE

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 6 Sodium retention in microgravity Science overview Study the impact of diet period on fluid and salt retention. Main Hardware EPM Laptop for PCBA SW update CDL Holter Arterial BP Cable for PCBA SW update PCBA: Portable Clinical Blood Analyzer MELFI: Freezer HRF2/RC: Refrigerated Centrifuge HRF1/SLAMMD: space weight-scale Consumables for Blood and Urine samples Next subjects P. Nespoli, R. Garan, D. Burbank (R), A. Kuipers Implementation 2 sessions per subject, 6 days activities /session L + 30 days < session 1 < 0 to 7 days < session 2 < R – 30 days Crew time Day 1, 2, 3, 4 & 5 : diet monitoring Day 4 & 6 : body mass measurement with SLAMMD Day 5 : blood collection and PCBA measurement Day 5 & 6 : 24hrs urine collection Data Data record in logs (diet, PCBA, urine) Data downlink to ground (SLAMMD) Blood and urine samples download to ground (frozen) SOLO

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 7 Scaling Body-Related Actions in Absence of Gravity Science overview Stand-alone experiment. Subject quasi free floating uses a tunnel (lighshield) to immerge into a virtual corridor and evaluate « passability » through doors. Main Hardware Laptop, lightshield, trackball, PCMCIA card Next subjects S. Kelly, P. Nespoli, C. Coleman, R. Garan, M. Fossum, S. Furukawa, (D. Burbank, A. Kuipers) Implementation 2 sessions per subject (Before FD21 and after FD120) Crew time 85 min crew time / session Data Data stored on PCMCIA card – downlink to ground via EPM Photo / Video 5 min video required PASSAGES

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 8 Science overview Stand alone experiment to study how human psycho-neuroendocrine and immunologic systems adapt to space environment, and how these processes are dependent on the cellular level of signal processing Main Hardware Plasma03 centrifuge MELFI freezer Next subjects Russian crew member Implementation First session during quiet period between L+4m and L+5m Second session during stressed period after R-12d Crew time 3h55 min crew time /session (24h session from 8am to 8am) Day 1:Stress Tests, Saliva Samplings, Blood Sampling, Urine Collection Day 2: End of urine collection Data Urine and blood samplings (frozen), paper Current Stress tests sheets, blood smears boxes and saliva tubes, urine and blood sampling logbooks. Photo / Video Not required Neuroendocrine and immune responses during and after long term stay at ISS IMMUNO

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 9 Prefrontal brain functions and spatial cognition Science overview Subject in free floating using a tunnel (lighshield) to immerge into challenging scene. EEG, EOG, EMG and ECG signals are acquired via EPM-MEEMM. Main Hardware EPM, MEEMM, laptops, lightshield, gamepad, EEG cap, consumable (gel), chest belt Next subjects Paolo Nespoli, Catherine Coleman (operator only) (No subject during Inc27-28; Next subject A. Kuipers) Implementation 2 sessions per subject (around FD15 and FD60) 3 days activities /session Crew time Day 1 : hardware setup Day 2 : electronic hardware activation, EEG cap setup, experimental session, quick stowing Day 3 : data saving, stowing Data Data stored on MEEMM and laptop Neurosciences Hard Disks Data downlink via EPM High Rate link Photo / Video 5 min video required, photo-modeling pictures of EEG cap NEUROSPAT

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 10 Muscle Atrophy Research and Exercises System: C/O Part 2 Science overview N/A: Commissioning Part 2 = operational test of MARES Main Hardware MARES, EPM Laptop & Ext. HD, PEMS-2, CDL ADAS (+EMG electrodes), HRF Echo, consumables, EPM Rack Next subjects A. Kuipers, D. Petit (operator only) Implementation 1 session (between FD2 and FD10) 2 days activities /session Crew time Day 1 : MARES deployment + activation + Battery charge + PEMS test + Ultrasound activity Day 2 : Subject equipment (PEMS-2 + EMG electrodes) + HW activation + Com Part 2 session + Files copy + Battery discharge + deactivation/stowage/ + Files downlink to ground Data Data stored on MARES and EPM Laptop Data downlink via EPM High Rate link Photo / Video Video required for Day 1 and Day 2 MARES

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 11 Sarcolab Science overview Investigation of the structural and functional changes in the muscles causing that phenomenon/characterization of reflex excitability of the calf muscles, before, during and after flight. Main Hardware MARES, EPM Laptop & Ext. HD, PEMS-2, CDL ADAS (+EMG electrodes), HRF Echo, consumables, EPM Rack MARES used with ankle configuration/ PEMS-2 connected to MARES/ CDL ADAS used for EMG data (synchronization) Muscle biopsy and MRI only during ground BDC Next subjects A. Kuipers, D. Petit (operator only) Implementation 3 sessions: FD 5-10 / FD 45 ± 15 days / R – 10 ± 8 days 2 days activities /session Crew time Day 1 : MARES deployment + HW set up+ activation + Battery charge + Ultrasound activity Day 2 : Subject equipment (PEMS + EMG electrodes) + HW activation + Sarcolab session + Files copy + battery discharge + deactivation/stowage/ + Files downlink to ground Data Data stored on MARES and EPM Laptop Data downlink via EPM High Rate link Photo / Video Video required for Day 1 and Day 2 MARES

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 12 Activity overview Trip issue on the EPM Laptop power line (which is common with the EPM Video unit) occurred during the NEUROSPAT Session (early summer 09) - SPR 357 Main Hardware EPM VIDEO UNIT Operator P. Nespoli Implementation Activity Plans: ■ EPM VU Power Connector J02 disconnection (Incr 25-26) ■ In case that failure is still present after connector disconnection: EPM Video Unit Power Harness stepwise interconnection tests ■ In case that VU is source of problem: EPM Video Unit Removal & Replacement (EPM VU FM2 upload on ATV-2; EPM VU FM-1 download on ULF7, TBC) Video Unit Replacement EPM MAINTENANCE

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 13 Overview ExperimentPre-flightPost-flight 3D-SPACE L-90d, L-60d, L-30dR+0d, R+1d, R+4, R+8 CARD Any time before L> R+60d IMMUNO Between L-30d/L-7dR+1d, R+7d, >R+30d NEUROSPAT L-90d, L-60d, L-30d.R+2, R+6, >R+15 (x2) PASSAGES >L-90dR+1d, >R+20d SOLO N/A>R+6M EDOS L-60d, L-30d R+1d (BM), R+2d (XCT), R+15d (BM), R+90d(BM & XCT), R+180d (BM & XCT), R+360d ±2w SPIN <L (x3) the same Wk R+1d, R+4d, R+9d: VVIS and Tilt test BDC

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 14 SARCOLAB ExperimentPre-flightPost-flight SARCOLAB Desired number of test subjects = 12 (minimum=10) Session A *: L-60±30 d R + 1 day Session B *: L-60 ± 30 days *: Min. 7 days between Session A & Session B R+2 to 4 days R+3 to 5 (+ 2 days) R+14 ± 2 days R+30 ± 5 days R+60 ± 7 days (#) (#) only if no full recovery in previous session BDC (2)

POIWG#29_CADMOS-Inc27-28 Overview I Jan I Huntsville, AL I Page 15 ACRONYMS ADASAmbulatory Data Acquisition SystemHRFHuman Research Facility BPBlood PressureMARESMuscle Atrophy Research and Exercise System CDLCardiolabMEEMMMulti ElectroEncephalogramme Mapping Module ECGElectrocardiogrammeMELFIMinus Eighty Degree Laboratory Freezer for ISS EEGElectroencephalogrammePCBAPortable Clinical Blood Analyzer EMGElectromyogrammePEMS-2Percutaneuous Electrical Muscle Stimulator 2 EOGElectrooculogrammeRCRefrigerated Centrifuge EPMEuropean Physiology Modules FacilitySWSoftware HDHard DiskVUVideo Unit