Electron cloud feedback collaboration meeting Participants: ANL: Kathy Harkay SNS: S. Cousineau, S. Henderson, Jeff Holmes, Y. Sato SLAC: A. Chao LANL:

Slides:



Advertisements
Similar presentations
1Y. SatoIndiana University; SNS, ORNL Electron Cloud Feedback Workshop Indiana University, Bloomington 03/15-19/2004 Simulation of e-Cloud using ORBIT.
Advertisements

Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
BUILD-UP SIMULATIONS FOR DAFNE WIGGLER W/ ELECTRODES Theo Demma.
ICA Applied to Long Bunches Jeff Kolski Informal workshop on ICS and High Intensity accelerators Indiana University Los Alamos Nation Laboratory 3/17/10.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
IU e-Cloud Feedback Workshop March 13, 2007 LA-UR Review of the e-p feedback experiments Rod McCrady Los Alamos National Lab.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Workshop SLAC 7/27/04 M. Zolotorev Fluctuation Properties of Electromagnetic Field Max Zolotorev CBP AFRD LBNL.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Knoxville, TN, Jan , 2014 Lecture.
S. Henderson, IU e-p meetingORNL March 15-19, 2004 Feedback 101 Stuart Henderson March 15-18, 2004.
By Jeffrey Eldred Data Analysis Workshop March 13th 2013 Intro to Electron Cloud: An experimental summary.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
Electron Cloud Simulations Using ORBIT Code - Cold Proton Bunch model April 11, 2007 ECLOUD07 Yoichi Sato, Nishina Center, RIKEN 1 Y. Sato ECLOUD07.
Electron Cloud Studies for Tevatron and Main Injector Xiaolong Zhang AD/Tevatron, Fermilab.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
EP Feedback Mini-Workshop IUCF March 13-15, RFA Measurements and Ideas related to Background Gas Ionization J. C. Dooling, S. Wang, K.C. Harkay,
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D Slide 1 Damping an e-p Instability at the LANL Proton Storage Ring Rod McCrady.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Simulation of Microbunching Instability in LCLS with Laser-Heater Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Double RF system at IUCF Shaoheng Wang 06/15/04. Contents 1.Introduction of Double RF System 2.Phase modulation  Single cavity case  Double cavity case.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Physics of electron cloud build up Principle of the multi-bunch multipacting. No need to be on resonance, wide ranges of parameters allow for the electron.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Midwest Accelerator Physics Meeting. Indiana University, March 15-19, ORBIT Electron Cloud Model Andrei Shishlo, Yoichi Sato, Slava Danilov, Jeff.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Accelerator Systems DivisionOak Ridge National Laboratory March 10-12, 2003 ORBIT SIMULATIONS AND RESULTS Jeff Holmes Accelerator Physicist September 30,
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Slide 1 Coherent Space Charge Tune Shift.
Benchmark and Study of PSR Longitudinal Beam Dynamics Sarah M. Cousineau, Jeffrey A. Holmes, Slava Danilov MAP Workshop March 18, 2004.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Hampton, VA, Jan , 2015 Longitudinal.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
Synchrotron frequency shift as a probe of the CERN SPS reactive impedance s HB2014 – 11/13/14 A. Lasheen, T. Argyropoulos, J. Esteban Müller, D. Quartullo,
Test of Optical Stochastic Cooling in CESR
402.5 MHz Debunching in the Ring
Longitudinal Effects in Space Charge Dominated Cooled Bunched Beams
First Results on Electron Cloud Generation and Trapping in a PSR Quadrupole Magnet R. J. Macek, A. A. Browman & L. J. Rybarcyk, 9/26/06 Acknowledgements:
A Head-Tail Simulation Code for Electron Cloud
CLIC damping rings working plan towards the CDR
Monday Week 1 Lecture Jeff Eldred
Linac Diagnostics Commissioning Experience
Update on ERL Cooler Design Studies
Fast kicker beam dynamics simulations
Conventional Synchronization Schemes
Presentation transcript:

Electron cloud feedback collaboration meeting Participants: ANL: Kathy Harkay SNS: S. Cousineau, S. Henderson, Jeff Holmes, Y. Sato SLAC: A. Chao LANL: R. Macek IU: Sara Breitzmann, S.Y. Lee, S. Wang, X. Huang, Fanglei Lin, Lingyun Yang, Qiong Wu, Fei Wang, Yingmei Su, Yue Hao

Program: 3/15: Kathy Harkay (ANL): e-cloud detector design issues Robert Macek (LANL): Overview of electron cloud effects at PSR 3/16: Robert Macek (LANL): Observations of the e-p Instability at PSR Stuart Henderson (SNS/ORNL): feedback basics, kicker, etc. Robert Macek: A compendium of e-cloud studies at PSR 3/17: Yoichi Sato (SNS/Indiana), Simulation of e-cloud using ORBIT Robert Macek: A compendium of e-cloud studies at PSR Jeff Holmes (SNS): ORBIT electron cloud model 3/18: Collaboration meeting

Experimental facts: The bandwidth of the instability for PSR can be up to 200 MHz. This seems to be related to the plasma frequency of electrons in the proton beams, i.e. ~(ρ) 1/2, where ρ is the effective density of the proton beam. The growth time ≈ 200 turns

Tasks: 1. Stuart Henderson: Stripline kicker 0.5 m, damping time 300 turns, corresponds to 300 W rf power with 200 MHz bandwidth. (The CIS stripline extraction kicker has a length of 1.3 m with 4.0 cm gap. Its usage is limited. We should talk to Fermilab to see whether we have a spare cooling feedback kicker. S.Y. Lee) 2. Control system, analog and digital signal processing, etc. (S. Henderson, SNS) 3. Effects of BPM resolution, amplifier noise on emittance and correction; Effect of sub-threshold coherent oscillations on the feedback. (A. Chao, SLAC + anyone interested.) 4. Availability of 200 MHz bandwidth Power amplifier (S. Henderson will check with J. Corlett) 5. Coordination, location of kicker and detector, Engineering, physical plan, and local support (R. Macek, LANL) 6. How to transform the current stripline (derivative) BPM signal into beam position information. (everyone should think about this task). 6. Website for collaboration information: 7. Timing: 2004, or Follow up meeting at SNS? ANL? Or PSR? (August?)

Puzzles, future experiments, and tasks to do: 1. Burst, sub-threshold? What causes the burst? Correlation with longitudinal distributions? 2. Properties of the sub-threshold coherent beam oscillations at a slightly lower frequency. Do we know the total spectral power in the sub-threshold condition? How does the spectral power depend on time? Bob’s experiments tell us that once ep instability is established, the total integrated betatron spectral power increase exponentially with time. The frequency extended up to 300 MHz. What causes it? 3. First pulse instability 4. Electron cloud recovery? Why not observed in numerical simulations? Bob says that when the sweep time is moved along the beam shape, he also see the electron cloud recovery phenomena. It would be nice to re-check this experiment. 5. What is the physics of neutralization factor in e-p instability?

6. Bunch shape dependence of electron cloud generation. These experimental results are very important to SEY modeling. 7. Dynamical range of RFA detector: A) Plotting the prompt electron distribution in log scale, the exponential growth factor may be related to electron cloud energy and transit time, and multipacting relevant to SEY. B) If one measure prompt electron distributions in energy bin, say 10 eV bin, one may be able to learn the electron energy distribution and understand the multipacting mechanism. C) The electron dissipation time is related to the space charge force and electron velocity distribution. D) The maximum energy of electron cloud observed from experiments is much larger than that derived in numerical simulations. Possible causes? sub-threshold coherent oscillation or transverse or longitudinal beam distributions? 8. Electron detection experiments with mylar strip in the dipole! How about in the quadrupole. If this work, one can use this method for electron multipacting prevention in accelerator magnets.