January 2009 Phase IVB Construction Photographs by Brent Anderson.

Slides:



Advertisements
Similar presentations
The Florida Everglades. The Everglades is also known as A: The Lake of Water Lilies B: The River of Grass C: The River of Mangroves D: The River of Sawgrass.
Advertisements

Chapter 5 project.
Lowermost Pajaro left-bank bench vegetation just downstream from Thurwatcher Bridge.
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
Boroo Gatsuurt Images of the Gatsuurt Open Pit Gold Mine Site – June 24, 2010 Photos by Paul Robinson
Geography of Ancient Egypt
September 21 Update. Future Main Entrance (looking south)
1 Beaver Lake Dam. 2 Coffer Dam (20’ high) 3 Dam site before construction Coffer dam.
Florida Water Forum Everglades Restoration June 3, 2011.
The Gift of the Nile Pages
The Mekong River - survival for millions Lake Tonle Sap Mekong Delta Mekong Delta Wetland.
November 2009 Kissimmee River Restoration Features Photographs by Brent Anderson.
Lake Mary Jane - C-30 canal on south end looking northwest - Lake Hart in the distance NOTE: to forward these slides, click the Arrow or Page Down buttons.
Project Slide Show. This 1893 photograph is of the Prather pump in the Shasta River Canyon about five miles upstream of the mouth of the river. Large.
Changing Rainfall and Water Availability in East Africa: Supplementary Material to Lesson 3 of the “East Africa Climate Change Curriculum Unit” Available.
Chubaka Producciones Presenta :.
October 2008 Phase IVB Construction Photographs by Steve Bousquin & Brent Anderson.
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI Aerial Photos Taken April 1, 2009 By.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Ancient Egypt “The Gift of the Nile”.
Murphy 2012 Bruneau River and Murphy Flows Liz Cresto September 19, 2012.
Grand Canyon National Park Grace. Grand Canyon National Park is located in Arizona. The area around the Grand Canyon became a national monument.
RELATIVE VELOCITY IN 2D. WARM UP A boat travels at a constant speed of 3 m/s on a river. The river’s current has a velocity of 2 m/s east. 1.If the boat.
Major Issues of Basin Planing Module 2. “..the Mekong River Basin and the related natural resources and environment are natural assets of immense value…”
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Formation of the Extratropical Cyclone (Cyclogenesis)
6-1 Notes: Geography of Ancient Egypt. The Nile River The Nile River is the world’s longest river (4,130 miles long!) The Nile flows south to north, so.
Southwest Asia and North Africa Physical Geography.
Relative Location The state of Florida is positioned in both the northern and western hemispheres. Florida is bordered by the states Alabama and Georgia.
Opening of the Panama Canal in 2016 Its Anticipated Impact on Global Soy and Grain Transportation Ken Eriksen Senior Vice September.
La Grange Reservoir Turlock Lake Eastside Reservoir or Optional Canal West Satellite Reservoir Cattle Reservoir Turlock Lake South Pump Station Northwest.
CONSTRUCTION UPDATE Napa Plant Site Central Unit.
Multifunctional Hydrological Roles in Cambodian Flood Plain Project (TSLV) Flood Mapping and Function of Flood Plains Manithaphone Mahaxay, MRCS.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
August 2008 Kissimmee River Updates Photographs by Brent Anderson The Effects of Tropical Storm Fay.
December 2009 – January 2010 Kissimmee River Restoration Features Photographs by Brent Anderson.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
VALLEY CROSS-PROFILES OF THE RIVER WYE. THE UPPER COURSE.
Site Selection The following are photographs of the sites from which you may choose your water samples. After reviewing the photos, you will use the map.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
June - August 2009 Phase IVB Construction and Restoration Features Photographs by Brent Anderson.
Flow Meeting 2004 Biop Litigation September 29, 2005 Jim Litchfield Montana.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
Side Channel and Off Channel Habitat Restoration Washington Dept. Forestry, 2004, Side Channel Restoration Dylan Castle.
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Boat Problems.
DICKINSON AVENUE RECONSTRUCTION
Inspire Elementary School
Pine cove pit time lapse drone photos
Absolute & Relative Location
Gradient The land surrounding the river channel. Valley The middle section of the river. Upper Course The steepness of the river. Mid Course The part of.
Characteristics of a Mature Stream
River Systems Part 2 Features of a Meandering River Levees
Date 5 November 2017, afternoon, Nor West wind direction,
McDonald’s calendar 2007.
北 N north 西 W west 東 E east south南 S.
February 2007 Note: Source:.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Don Pedro Project Relicensing
Rivers and Mountains of North America.
McDonald’s calendar 2007.
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Nine Mile Ride – Project Timeline
Spatial & Temporal Analysis of Groundwater Level Response to 2014 Environmental Pulse-Flow to the Colorado River Delta Stephanie Arnold.
2015 January February March April May June July August September
Presentation transcript:

January 2009 Phase IVB Construction Photographs by Brent Anderson

January 13, 2009 Looking south along the northwest side of the Phase IVB construction area. Most of the progress to date has been at the southern end with backfilling and recarving. December 4, 2008 September 2008

October 8, 2008 Looking south down the C-38 canal from the north end of the Phase IVB construction area. These images show the first plug, which is intended to direct flow around the construction site. Also visible (lower right) is the temporary channel that was dredged to re-route water around the construction site in order to decrease turbidity downstream January 13, 2009

July 31, 2008 Looking southwest at river channel recarving progress near the south end of the Phase IVB construction site. A. Recarved B. Recarving in progress C. Prepared for recarving January 13, 2009 Phase IVB Construction A B C

Recarving the river channel in the south end of Phase IVB construction. Looking southwest. October 7, 2008 January 13, 2009

Phase IVB Construction January 13, 2009 Recarving the river channel on the east side of the south end of Phase IVB construction.

January 13, 2009 Section of river channel prepped for recarving.

December 4, 2008 Heavy equipment backfilling the C-38 canal at the south end of Phase IVB.

January 13, 2008 Looking north from the south end of Phase IVB where it meets with the north end of the completed Phase IVA.

Phase I river channel and floodplain in the dry season. This image from lower Pool C shows the water flowing in the river channel and small drying pools on the floodplain. January 13, 2009

Phase I floodplain in the dry season. This image from lower Pool C shows almost completely dry drying pools, standing water in abandoned oxbows, and flowing water in the main channel (background). January 13, 2009

Istokpoga boat ramp construction is nearing completion. January 13, 2009