Readiness of the FOS monitor for the thermal mock-up and recent activities. PRAGUE, January 7 th VXD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,

Slides:



Advertisements
Similar presentations
Vertex Detector and Tracker Mechanics and Materials Bill Cooper (Fermilab) (Layer 1) VXD.
Advertisements

FIBER BRAGG GRATING SENSORS FOR SMART- TRACKERS: A REAL-TIME DEFORMATION, TEMPERATURE AND HUMIDITY MONITOR FOR THE BELLE-II VERTEX DETECTOR David Moya.
FIBER BRAGG GRATING SENSORS FOR SMART-TRACKERS Application to Belle II Vertex Detector David Moya Martín, IFCA (CSIC-UC) LC2013,Tracking Vertex session,
Off-beam Infrastructure for AIDA (A proposal for discussion) Iván Vila Álvarez kick-off meeting, CERN, Feb 16th 2010.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Structural and environmental monitoring of tracker and vertex systems using Fiber Optic Sensors Iván Vila Álvarez IFCA (CSIC-UC) ILWS ECFA Vertex session,
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
SiD LoI preparation workshop, SLAC 3th March 2009 Spanish Network LoI contribution Iv á n Vila Á lvarez Instituto de F í sica de Cantabria [CSIC-UC]
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
FOS monitoring for Off-beam infrastructure AIDA 2 nd Annual meeting WP9.3 Iván Vila Álvarez Instituto de Física de Cantabria (CSIC-UC )
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Structural and Environmental monitoring with FOS E. Currás, D. Moya,I. Vila, A.L. Virto, Instituto de Física de Cantabria (IFCA-Santander) J. G. Carrión,
CSIC WP9.4 Activities Status report AIDA 2 nd Annual meeting WP9.4 Iván Vila Álvarez Instituto de Física de Cantabria.
STATUS ON Optical fiber: Preliminary tests on Optical Fiber and Fiber Optic Feedthrough Massimo Rossella, Marco Prata, Tommaso Cervi INFN, Sezione di Pavia.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
F. Arteche EMC studies for CMS tracker upgrade Status & Plans.
TRACKING AND VERTEXING SUMMARY Suyong Choi Korea University.
Clic Vertex Thermal set up 07/08/2013 Maxence CURDY François-Xavier NUIRY 1 CERN PH/DT/EO.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Update on FOS monitor Ringberg Castle, 13th DEPFET Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,J.González Instituto de Física de Cantabria (CSIC-UC.
8  February 2011 FOS irradiation Results and Omega Shape manufacture D. Moya, I. Vila, A. L. Virto, F.J. Muñoz, J. Duarte Instituto de Física de Cantabria.
SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Readiness of the FOS monitor for DESY’s thermo-mechanical mock-up. Kloster Seeon, May 19 th DEPFET Workshop D. Moya, I. Vila, A. L. Virto., J.González.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
Monitoring hardware for SVD (VXD) L.Lanceri, L.Vitale /INFN Trieste VXD Workshop, 01/10/2014 Slow Controls discussion session 1 1.Radiation & beam abort.
T-THERMO-MECHANICAL MODEL FOR THE LC FORWARD TRACKER Ciemat, October 27 th, FPA2013ILC workshop D. Moya, I. Vila, Instituto de Física de Cantabria (CSIC-UC.
Real-Time FOS monitor 3 rd Belle Ii PXD/SVD and 12th Depfet Workshop in wetzlar E. Currás, D. Moya, I. Vila, A. L. Virto.,J.González Instituto de Física.
SVD IR mechanics status S.Tanaka SVD mechanics session.
Real-Time FOS monitor DEPFET PXD and SVD Workshop in Göttingen E. Currás, D. Moya, I. Vila, A. L. Virto. Instituto de Física de Cantabria (CSIC-UC ) G.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
R&D LINE ON ACTIVE PIXEL DETECTORS P1.6 Fiber optic enviromental and structural vertex monitor. Ciemat, October 27 th D. Moya, I. Vila, A. L. Virto., J.González.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Depfet Evo meeting. D. Moya IFCA (CSIC-UC) FOS based displacement sensors for PXD-SVD movements measurements.
PXD meeting, 22 June 2011 New omega shape and fibers irradiation D. Moya, I. Vila, A. L. Virto, F.J. Muñoz, J. Duarte Instituto de Física de Cantabria.
FOS environmental monitor at the 2016 Test beam Kloster seeon, 20 th Depfet Workshop D. Moya, I. Vila, A. L. Virto., J.González Instituto de Física de.
Readiness of the FOS monitor for the thermal mock-up and recent activities. Pisa, 6 th PXD SVD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto., J.González.
Commissioning of the Fiber-Optical-Sensor (FOS) environmental and structural monitor AIDA 3nd Annual meeting WP9.4 Iván Vila Álvarez Instituto de Física.
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Discussion items SVD mechanics session.
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Readiness of the FOS monitor for the thermal mock-up and recent activities. Kloster Seeon, 16th DEPFET Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
Vertex Detector Mechanical R&D Design Questions and Issues
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
SIT AND FTD DESIGN FOR ILD
Preparations for test of
Presentation transcript:

Readiness of the FOS monitor for the thermal mock-up and recent activities. PRAGUE, January 7 th VXD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto., J.González Instituto de Física de Cantabria (CSIC-UC ) G. Carrión, M. Frövel. Instituto Nacional de Técnica Aeronautica (INTA )

Outline — Status and open issues concerning the FOS for the mock-up. — Fiber connectors and matting sleeves for docs connection. — Relative displacement monitoring for the final application at Belle II vertex. 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. 2

Fiber cables and sensors for the mock-up 3 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. Four cables with four sensors Additional FOS with not specific support (see next table)

FOS for PXD mock-up 4 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. Fibres for PXD thermal set-up Fibre NºNº of sensorspositiontubeparameter 514On top of PXD on airTeflonTemperature 524On top of PXD on airTeflonTemperature 534On top of PXD on airTeflonTemperature 374On top of PXD on air-Temperature + humidity 384On top of PXD on air-Spare OS-42101To be definedmetalTemperature sensor 11To be defineTeflonTemperature sensor 21To be defineTeflonTemperature Fibre 1 polyimida2To be define-Temperature + humidity Fibre 2 polyimida2To be define-Temperature + humidity SN89356/00031To be definedmetalTemperature New sensors January Test Beam sensors DAQ integration using January test beam EPICS driver

Open issues :Offset calibration 5 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. — Test beam fibers: same calibration parameters — All the new fibers calibrated with temperature. Temperature sensitivity obtained. — The offset will be measured at IFCA before mounting in the mock-up and checked in the mock-up if possible — To obtain the offset at IFCA the fiber will be positioned as in DESY’s mock-up and the humidity will be reduced up to a value of about 8%. A temperature reference sensor will be positioned near de sensors in order to measure offset reference temperature. — Offset for the fibers without teflon tubing obtained from thermal calibrations.

Mock up Mechanics for Teflon tubing sensors 6 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. — The support mechanics for fibers positioned in the air above PXD ladders already defined : — Due to some difference with real application some changes in the fibers could be necessary.

Mock-up displacement monitoring — Use four L-shapes in order to measure relative PXD SVD radial displacement in the mock-up 7 7th Belle II VXD Workshop, January 21st,2015, PRAGUE.

Open issues — Fixation of l-shapes in the mock-up. _ A first position and locking proposal: Ok from both PXD and SVD part _ L-shape locking mechanics needed for L-shapes calibration _ Manufactured at IFCA (design needed to check if possible) or manufactured 8 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. outside and sent to IFCA for L-shapes calibration ?

R/O of the FBG sensors for the mock-up 9 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. — For PXD mock-up DAQ ready: Readout integrated in epics similar to the test beam ( integration expected to be smooth) — For PXD-SVD mock-up: _ The sm switcher is intended to be integrated in the system ( in order to increment the interrogation channels and to be able to measure L-shapes) _ The possibility to measure vibrations is being studied by Michael Ritzer (Heidelberg) and Javier Gonzalez (IFCA)

Connection of the fibers in the docs 10 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. — Studding two possibilities : FC-APC vs LC-APC — Size : LC-APC seems better — For LC-APC connectors you can buy multiple LC-APC matting sleeve ( not in the case of FC-APC) — LC-APC interconnection more simple ( without thread or connector key) FC-APC connectors LC-APC connectors Matting sleeves

Connection of the fibers in the docs 11 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. — LC-FC comparison in signal attenuation: a little bit higher for LC-APC connectors but not problematic.

For the final application — Define displacement to be measured. _ Relative radial displacement _ Relative displacement in Z direction ( the problem must be define ( resolution, range, positioning tolerance..) 12 7th Belle II VXD Workshop, January 21st,2015, PRAGUE. Fiber egress protection 7 mm 3.5 mm 30 mm CFRP L-shape NEW DESIGN OR

Questions & Comments ? — Supporting documentation and manual stilll under preparation. — Assuming installation of fibers in the mock-up by middle- end of February and of L-shapes in May — Comparison between LC-APC and FC-APC connectors. LC connectors less bulky but higher attenuation ( not a problem for the system) — For the real application _ Relative displacement to be measured must be define (Radial or in Z direction). In this last case the problem must be defined (range, resolution and positioning dimensional tolerance) 13 7th Belle II VXD Workshop, January 21st,2015, PRAGUE.