Federal Aviation Administration Aviation Rumble Strip Project Update RPD 133 March 16, 2016.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Effective Contract Management Planning
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
1 LEDs - Past, Present and Future FAA Eastern Region Airports Conference Thursday, 3 March 2011 Presented by Pete Butler, P.E.
M.A.S.H.: The New Safety Hardware Crash Testing Criteria
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Federal Aviation Administration 1 35 th Annual Airports Conference – April 3, 2012 FAA Air show Waiver Reviews Presentation to: Name: Date: 35 th Annual.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
Increasing The Relevance Of AVS Within The NAS 9 January 2007 Nominated for Flight International’s “Aerospace Industry Awards” 2005.
Satellite Notification and Acceptance Program (SNAP)
1 Comprehensive Management Plan for East Hampton Airport  Safety, Noise and Operations Peter J. Kirsch December 1, 2011.
Recent Lighting and Marking Design Challenges/Trends
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Federal Aviation Administration Visual Guidance Research and Development Presented to: 32nd Annual Eastern Region Airport Conference By: Donald Gallagher,
Aerodrome Certification Exercise The Process
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Federal Aviation Administration Rick Etter Airports Acquisition Specialist FAA, Office of Airport Planning and Programming International Right-of-Way Association.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Presented to: SEARAST, NARAST, SARAST By: Glenn Michael Date: November , 2007 Federal Aviation Administration Analytical Unit Call to Action on.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
By: FAASTeam Federal Aviation Administration Land and Hold Short Operations (LAHSO)
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
TW-4 Deliberate ORM Analysis COLLEGE STATION – EASTERWOOD FIELD (KCLL) NIGHT OPERATIONS TEAM VISIT 14 FEB 08.
Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Federal Aviation Administration FPAW Summer 2012 RVR/Prevailing Visibility Conversion and.
ASTM E17 Committee Mini-Seminar Dec. 5, 2006 Federal Aviation Administration 1 FAA PERSPECTIVE Airfield Pavement Roughness Presentation to: ASTM E17 Committee.
Communications, Airspace and a bunch of other stuff ! Rick L. Crose Orlando International Tower.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
Presented to: By: Date: Federal Aviation Administration NextGen Network Enabled Weather Capability Evaluations Demonstration and Prototyping Information.
Skip Hudspeth and Gordon Hayhoe 112/20/2015. Pavement Roughness Subjective Pilot Rating Study Phase I - Develop a surface roughness model on the B
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
INNOVATION PODIUM. 02: :30 NEXT SESSION EVOLUTION OF POWER SYSTEMS IN AIRFIELD LIGHTING - INCANDESCENT VS. LED VS. PRESCOT EXPERIENCE VS. NEW SMARTPOWER.
The U.S. Department of Transportation and the Next Generation Jenny Hansen – Contractor – NG9-1-1 Project Coordinator USDOT – NHTSA.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Presented to: 2010 FAA Worldwide Technology Transfer Conference By: James Zargan and Al Larkin Date: April 2010 Federal Aviation Administration FAA Pavement.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Federal Aviation Administration Airport Safety Technology Research & Development Given by: Robert Bassey IESALC Conference, October 19, 2015 Denver, CO.
Office of Research and Development Photo image area measures 2” H x 6.93” W and can be masked by a collage strip of one, two or three images. The photo.
Air Line Pilots Association, International IESALC Denver October19,2015 LED Lights In Runway And Approach Lighting Arrays A Pilot’s Perspective Captain.
Presented to: By: Date: Federal Aviation Administration RPD 151 (RPA S5.1) Evaluation of In-Pavement Light Fixture Designs and Performance REDAC Subcommittee.
Presented to: By: Date: Federal Aviation Administration Teterboro Runway 19 Quiet Visual Approach Teterboro Users Group (TUG) Gerald Lynch, Eastern Service.
Federal Aviation Administration Presented to: OSWG Presented by: Chris Hope Date: March 9, 2016 ILS Performance Classification OpSpec C061.
Federal Aviation Administration Infra-Red Requirements for developing a Elevated LED High Intensity Runway Edge Light, L-862(L) (HIRLs) with IR emitter.
Real Property Policy Update Planning and Development Committee August 4, 2015.
Presented to: ICAS By: FAA – Sue Gardner DND – Bruce Ehmann TCCA – Wayne Harper Date: December 12, 2012 Federal Aviation Administration Version 0.9d DND.
Presented to: By: Date: Federal Aviation Administration Obstacles in the Visual Segment 20:1 Background, Policies and Action Gerard G Lebar Eastern Flight.
Presented to: By: Date: Federal Aviation Administration Airport Safety Section Update ANG-E261 REDAC Jim Patterson March 16, 2016.
Federal Aviation Administration Aviation Rumble Strip Project Update March 16, 2016.
Phase II Financial Review Guidance
I-84 Baker Valley Variable Speed Limit System
Design and Construction
Joint Planning and Development Office “Where new ideas are welcome”
The U.S. Department of Transportation and the Next Generation
Citizens Advisory Committee EPA/CBP Program Update Jim Edward Deputy Director Chesapeake Bay Program Office February 20-21,2019 Williamsburg, VA.
Stimulating Innovation and the U.S. Economy through the U.S. DOT’s
Stimulating Innovation and the U.S. Economy through the U.S. DOT’s
Presentation transcript:

Federal Aviation Administration Aviation Rumble Strip Project Update RPD 133 March 16, 2016

Federal Aviation Administration Utilizing a Center of Excellence PEGASAS Partnership to Enhance General Aviation Safety, Accessibility and Sustainability 3/16/16

Federal Aviation Administration Thermoplastic Saw Cut Temporary 2015 Purdue Airport Rumble Strip Test Site 3/16/16

Federal Aviation Administration 3/16/16 Temporary

Federal Aviation Administration 3/16/16

Federal Aviation Administration 3/16/16

Federal Aviation Administration Saw Cut Options 3/16/16 Square Cut Bevel Cut

Federal Aviation Administration Thermoplastic  Easy to construct  Semi-intrusive  Permanent  Proven to withstand winter ops in roadway environment 3/16/16

9 Federal Aviation Administration PEGASAS Test Configuration Thermoplastic Sawcut Temporary

Federal Aviation Administration Aircraft Used in Study CESSNA 172 CIRRUS SR20 CESSNA 152 SKY ARROW PIPER PA 34 CRJ-100ER CESSNA 152 PIPER PA 28

Federal Aviation Administration Temporary Saw Cut Thermoplastic Acceleration Graph Aircraft: Cessna 172 Speed:5 knots

Federal Aviation Administration Affects on Pilots and Airframe Rail-to-Seat Plots for 10 kts Significant airframe acceleration must occur for pilot to feel rumble strip Airframe affected by 2 to 3X the acceleration force felt by pilot, over time airframe manufacturers feel this may cause damage to the gears. Seat vs. Rail

Federal Aviation Administration April 2015 Durability Testing 13

Federal Aviation Administration Tech Center Test Results Day Load Aircraft Passes Square CutBeveledTemporary Day 1 10k lbs. E passes Began crumbling at 500 passes No change Day 2 15k lbs. CRJ passes Continued crumbling No change Day 3 30k lbs passesHeavily wornNo change Sign of warn, but no damage Day 4 45k lbs. 738/A passes Heavily wornNo change Connection point becoming loose 60k lbs. 748/A passesHeavily wornNo change~1/8” depression 3/16/16

Federal Aviation Administration

16 Federal Aviation Administration European Rumble Strip Study Deployed on Active Taxiway for 3 months at Southampton Intl Airport, England 19.7”

17 Federal Aviation Administration European Rumble Strip Study Each segment 11.8” wide 39.4’ long 0.47” high 19.7” Feedback invited from pilots (35 responses) and ground vehicle operators (10 reports) Pilots report rumble strips were discernible (varied by aircraft) but difficult to differentiate from other taxiway features (e.g., rough pavement) Half assessed impact as “excessive” Pilots did not recognize purpose and considered rumble strips a distraction Did not affect capacity Deemed ineffective for incursion prevention

Federal Aviation Administration Our Evaluation Results 3/16/16

19 Federal Aviation Administration Problems with Durability of 90 degree Saw Cut at KLAF and at NJ Tech Center Saw Cut

20 Federal Aviation Administration Constructability Challenges with 45 degree Bevel Saw Cut at KLAF and at NJ Tech Center Saw Cut

Federal Aviation Administration Thermoplastic EEasy to construct SSemi-intrusive PPermanent PProven to withstand winter ops in roadway environment 3/16/16

Federal Aviation Administration NOT on Airports! Rumble Strips were Damaged by Snowplows after First Snow and Were Subsequently Removed to Avoid FOD on Airfield at KLAF 3/16/16

23 Federal Aviation Administration Thermoplastic has Problems with Durability

24 Federal Aviation Administration Temporary Rumble Strips  Allows temporary installation  Interlocking joints  Segments: 13” wide, 36” long, ¾” high, 35 lbs  Can be installed by one person

Federal Aviation Administration Conclusions  All Rumble Strip types evaluated, if installed permanently, may cause damage, with continual use, to the size of aircraft used in study.  Saw Cut Strip  Durability of 90 degree  Constructability with 45 degree bevel  Temporary Rumble Strips may be useful as a tactile warning to aircraft when used to identify a temporary change at an airport such as a construction areas etc. 3/16/16

26 Federal Aviation Administration Questions/Comments?

Federal Aviation Administration Infra-Red Requirements for developing a Elevated LED High Intensity Runway Edge Light, L-862(L) (HIRLs) with IR emitter March 16, 2016

28 Federal Aviation Administration Infra-Red Requirements for LED HIRLs  About 10 years ago, the FAA published a final rule permitting Enhanced Flight Vision System (EFVS) operations to be conducted below DA/DH or MDA down to 100 feet above the touchdown zone elevation.  The EFVS manufacturers addressed concerns about their equipment not being able to see an image on a Heads Up Display (HUD) LED lights in the runway environment, due to little to no heat (IR) in the needed wavelength.  Traditionally, the NAS doesn’t have a requirement for airport lighting to emit IR energy. Airport lighting standards are solely based on the visible spectrum (intensity, brightness, color, beam spread). 3/16/16

29 Federal Aviation Administration Infra-Red Requirements for LED HIRLs  In 2008, the RTCA SC-213, Enhanced Flight Vision Systems and Synthetic Vision Systems committee took on the task to identify the IR amount needed for EFVS. After two years, they were unsuccessful in establishing the required amount of IR.  In 2010, the SAE G-20 Committee was formed and originally tasked by AFS-400 to “address the possible adverse impact to EFVS operations by transitioning airport approach and surface lighting systems from incandescent to LED’s.” They also took on the task to identify the IR amount needed for EFVS. To this date, the they have not been able to identify the IR amount needed for EFVS. 3/16/16

30 Federal Aviation Administration Infra-Red Requirements for LED HIRLs  Because of these concerns, FAA Office of Airports issued the guidance in the AIP handbook Effective September 30, 2014 restricting the use of AIP funds for certain LED lights including LED Obstruction Lights, LED Approach Lights, and LED High Intensity Runway Edge Lights.  In an attempt to lift the AIP restriction from funding LED HIRLs, AAS requested this research to explore the requirements for developing a FAA L-862(L) (HIRL) with an IR emitter, designation to be L-862(L-IR) and to ensure its compatibility with aircraft currently equipped with EFVS. 3/16/16

31 Federal Aviation Administration OBJECTIVES  Develop IR requirement based on legacy L-862 incandescent fixture measurement, and use visual light requirements from FAA AC 150/ (current version), and FAA EB 67D.  Perform IR measurements (IR power output in watts per steradian, and IR beam pattern) on the legacy tungsten- halogen FAA L-862 (HIRL), which current EFVS system’s utilizes, to determine current IR output. 3/16/16

32 Federal Aviation Administration Process  Post a Broad Agency Announcement (BAA)  Prepare Request for Proposal (RFP) to develop prototype L- 862 (L-IR).  Award contract to ultimately build prototypes  Conduct validation operational flight tests through the Office of Flight Standards.  Conduct cost analysis and comparison for LED fixture with IR to LED fixture without IR. 3/16/16

33 Federal Aviation Administration Phase I: Broad Agency Announcement (BAA)  Announcement posted2/02/16  Announcement closed2/19/16  Evaluation period2/22/16 to 3/10/16  Contracts notifies candidates3/25/16 for Phase II Request For Proposal (RFP)

34 Federal Aviation Administration Three-page Technical Summary At a minimum summary shall contain: a.Purpose of Research b.Description of Research and the Science of How and Why it works c.Current State of Development d.Estimated Time to Complete e.Description of testing & Evaluation procedures f.Estimated Funds required Only offers' whose Technical Summary is considered capable of meeting existing or future program requirements will be asked to submit a formal Phase II proposal.

35 Federal Aviation Administration Phase II: Request For Proposal (RFP)  Proposal submission3/28/16 to 6/25/16  Evaluation period6/27/16 to 7/25/16  Contracts Award notification of Phase II 8/25/16  Phase II9/01/16 to 2/28/17 Request for submission of a full proposal does NOT guarantee AWARD selection

36 Federal Aviation Administration Objectives of Contract Develop prototypes:  Option 1: Produce Six (6) L-863(L-IR) fixtures to meet IR output of L-862 and photometric performance from EB67D.  Option 2: Produce Six (6) Self-contained IR only emitter with necessary optics to meet requirements of item 1 and include design to interface with current runway edge lighting system.  Option 3: Develop a method to activate only the IR emitter when needed for EFVS operations. 3/16/16

37 Federal Aviation Administration Phase II Proposal Volume I: TECHNICAL proposal (not to exceed 40 pages) should include: a.A Validation Plan b.Steps to develop: 1.A FAA L-862(L) with an IR emitter and to ensure their compatibility with current EFVS 2.A standalone IR emitter and to ensure their compatibility with current EFVS Volume II: COST/FUNDING proposal Cost and Cost proposals will be evaluated as acceptable or unacceptable only.

38 Federal Aviation Administration Phase II Evaluation 4 Technical areas listed in order of decreasing importance: 1.Technical Merit 2.Utility to the FAA Airport Safety R&D program 3.Team Competency and Experience 4.Effective Plan for Project Completion

39 Federal Aviation Administration Schedule

40 Federal Aviation Administration Questions/Comments?

Federal Aviation Administration RPD 151 By: Robert Bassey Date: March 16, 2016

42 Federal Aviation Administration RPD 151 – Visual Guidance FY 2016 Accomplishments Research Goals Funding Requirements Reduced Pilot Disorientation Increase Surface Operations Safety Need Provide better visual cues to pilots to reduce the risk of incursion FY 15FY 16FY 17FY 18 Funding Target ($000) Address issues impacting the use of LED lighting technology across the NAS and its impact on safe operations

43 Federal Aviation Administration LED Lighted “X” Research

44 Federal Aviation Administration LED Lighted “X” Testing

45 Federal Aviation Administration LED Lighted “X” Testing Overview Photometrics –Color (chromaticity) and Intensity (candela) Performance Standards –Appearance, Set-up, and Operation Flight Testing - Incandescent and LED Lighted “X’s” –Acquisition and Shape Recognition Distances (in nautical miles) –Visibility –Brightness –Glare

46 Federal Aviation Administration Flight Testing Orlando Melbourne International Airport (MLB); Melbourne, Florida Purdue University Airport (LAF); Lafayette, Indiana Ohio State University Airport (OSU); Columbus, Ohio

47 Federal Aviation Administration Incandescent and LED Lighted “X’s” Day Flight - MLB

48 Federal Aviation Administration LED Lighted “X” Night Flight - MLB

49 Federal Aviation Administration Project Milestones and Schedule MilestoneCompletion Date Performance Standards March 2016 Photometric TestingApril 2016 Flight TestingMarch 2016 Final ReportJune 2016

50 Federal Aviation Administration LED Electrical Infrastructure Research

51 Federal Aviation Administration Issues resulting from LED implementation in the Current 6.6A Series Airfield Lighting System Added complexity and cost to the LED fixture due to the addition of electronics to mimic the non-linear dimming curve of incandescent lighting.

52 Federal Aviation Administration Architectures Tested

53 Federal Aviation Administration Roadmap Testing Phase  Alpha testing at FAATC, May 2015 –Integration including mixing of product –Fixtures will be instrumented and monitored by FAA equipment to determine performance –Identify any deficiencies, or adjustments to be made  Beta testing at PEGASAS Airport March, 2016 –Similar set up as alpha testing –Large circuit –Legacy mode will be available in case there is an issue with the circuit

54 Federal Aviation Administration Purdue Airport Taxiway “C” (Beta Test Circuit)

55 Federal Aviation Administration

56 Federal Aviation Administration

57 Federal Aviation Administration New Technologies The FAA R&D Visual Guidance Program has continued to explore technologies to increase surface safety and reduce the rate of runway incursions –A literature review report was completed in November, 2015 –One technology recommended in the report that is being considered for further study at the present time is addressable airfield signage

58 Federal Aviation Administration Previous Addressable Sign Study

59 Federal Aviation Administration Current LED Addressable Signage

60 Federal Aviation Administration Potential Applications (cont.)

61 Federal Aviation Administration Research Proposed A comprehensive study is proposed to evaluate the human factors challenges and technical requirements for addressable signage The outcome of this study will be recommendations for standards for addressable signage use and technical specifications

62 Federal Aviation Administration Questions/Comments?