Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop 01.12.2014.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
1 BROOKHAVEN SCIENCE ASSOCIATES Pulsed Magnet System Eric Blum, Senior Science Associate 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Progress of the BEPCII Injection System Kang Wen.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
A device that can hold or store a reasonable amount of electric charge It is made of two parallel plates separated by insulator( dielectric) or air It.
1/39 Passive components and circuits - CCP Lecture 11.
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
DESIGN OF THE NEPTUNE NODE CONVERTER Vatché Vorpérian Jet Propulsion Laboratory.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
SYSTEMS CORPORATION Pulse Sciences Division FAST MARX-CHARGED ONE-STAGE MPC CONCEPT FOR KrF LASER IFE Doug Weidenheimer Titan Pulse Sciences Division.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Muon g-2 Experiment at Fermilab Recycler Extraction Kicker Dan Wolff/Chris Jensen 8/29/08.
Power Supply System for DRFS
BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)
FUNDAMENTALS OF ELECTROMAGNETICS WITH MATLAB®
Prompt Kicker M. Aoki. 2 3 H-Line Kicker Prompt Burst: 5e8 / H-line exit – Any detectors will be saturated. Need to reduce the prompt burst.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Scoping Study of RWM on NSTX C Neumeyer 2/21/3. Purpose: 1) identify the design issues, 2) develop the design concepts and 3) outline the tasks GA/PPPL.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
DR. A. O. ADEWALE Course Outline: Electrostatics, potential and capacitance, dielectrics, production and measurement of static electricity. Current, Ohm’s.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
R.HARIHARAN LECT/EEE UNIT - III.  For electrical engineers, the main concern of high voltages is for the insulation testing of various components in.
Power Supply Design Howie Pfeffer Mu2e Extinction Technical Design Review 2 November 2015.
The power supply for magnetic elements at CR D.Senkov IWAPT 2015, BINP, Novosibirsk The power supply for magnetic elements at CR D. Senkov/
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
Design and Development of Transient Network Analyzer By M.Satish kumar 04131A0241 P.Sasi kumar 04131A0240 T.Sirisha 04131A0244 V.S.Pramod 04131A0247 Under.
, IDS Meeting, Fermilab J. Pasternak Challenges of muon FFAG: injection/extraction, beam dynamics and injection/extraction hardware design studies.
Full Wave Rectifier Circuit with Working Theory
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
Half-wave Rectifier.
Center tap Full-Wave Rectifier.
MAGNETIZING ELECTRICAL-ELECTRONIC EQUIPMENT 800V, 1200A
TPS pulse magnet measurement
LINAC4 ADVISORY COMMITTEE
Diodes Introduction Textbook CD
S. V. Vasiliev, A. S. Kasaev, D. E. Berkaev, V. V. Balakin
Modulators - Inductive adder. Technical description.
for the Neutrino Factory
Topical Workshop on Injection and Injection systems (TWIIS)
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Klystron Power Supplies for ILC
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Exercise 10 Power systems.
KICKER STATUS G-2 meeting March 5, 2014
Lecture 14. Diagnostic equipment of the accelerators
F  eE F  ma ma  eE Electron Ballistics
PSB magnetic cycle 900 ms MeV to 2 GeV
Lab: AC Circuits Integrated Science II.
Presentation transcript:

Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop

Main parameters of the kicker Maximum magnetic field, mT46.3 Direction of kickhorizontal Horizontal gap X, sm18 Vertical gap Y, sm10 Integrated field of kicker, mT x m167 Number of modules6 Effective length, sm60 Length of ferrite, sm50 Inductance of module, µH1.3 Peak current on the kickers plates, kA3.7 Rise/fall of pulse (requirement), nsec200 Maximum pulse duration, µsec0.8 PFN impedance (requirement), Ohm6.5 dI/dt for switch (not less), kA/µs18.5 Maximum Charging voltage of PFN, kV47 Type of thyratronCX2610 Magnetic Material 8C11 Ferrite thickness 3 sm Field inhomogeneity, no more2% Undershoot, no more1.5%

Magnetic field calculation

Parameters of the ferrite Thickness of ferrite 30 mm Weight of ferrite per module 50 kg Weight of one block C-type 25 kg Total weight of ferrite for 6 modules 300 kg For calculating take the maximum magnetic field equal 0.15T

Magnetic field distribution along axis X Window dimension along axis X 180 mm Nominal magnetic field 46.3 mT Field nonuniformity in this direction 0.1%

Magnetic field per kicker section Length of the module 50 sm. The spacing between modules 10 sm. Integrated field effective 83 mTm. Calculated in 2D FEMM.

The time cycle of injection/extraction The time cycle of kicker in the RIB mode The time cycle of kicker in the antiproton mode

Scheme of the Power Supply This scheme provides a different polarity and duration of the current pulse. PFN may be consist from the cable line with nominal working voltage 47 kV. Parameters of the pulse forming line PFN Impedance 6.7 Ohm PFN capacity 450 nF Maximum charging voltage 47 kV Three methods of PFN construction: Cable line – connected in parallel for to obtain requirement wave impedance. Line with concentrated parameters – allow to get the requirements parameters with compact dimensions. Special line with distributed parameters - also as previous variant.

The kickers current simulation

Parameters of the switch Thyratron variant Type CX2610 produced by E2V Peak forward anode voltage 55 kV Peak forward anode current 10 kA Rate of rise anode current 100 kA/µsec The peak inverse voltage, including spike, must not exceed 5 kV for the first 25 ms after the anode pulse. It is necessary to put a diode in parallel to the thyratron. Trigger module MA2709A produced by E2V Peak forward anode voltage 47 kV Peak forward anode current 3.7 kA Rate of rise anode current 20 kA/µsec Variants of switch: Thyratron Semiconductor Pseudospark

Charging scheme V1 - power supply (nominal voltage 260V, nominal power 600W) C1, C2 - capacity storage S1, S4 - charging switch (nominal current 150A) L1-L4 pulse transformer (transformation coefficient 192) C2- PFN capacity Two capacity storage allow to use low power supply. The time charging of this capacities 1sec.