Www.nasa.gov National Aeronautics and Space Administration Microgravity Science Glovebox (MSG) Seal Exchange Overview February 2, 2006.

Slides:



Advertisements
Similar presentations
C230 Kompressor Oil Change Procedure
Advertisements

CHAPTER 45 Engine Lubrication.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
Troubleshooting Guide. Table of Contents 2 Shower Filter 3 Leak Between Top Housing & Filter4 Leak Between Swivel Collar & Housing5 Leak at Top of Swivel.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
1 FUEL SYSTEM SERVICE ENGINE CLEAN FUEL TOOL MODEL RX 777.
ATLIER FRANCOIS (COMPRESSOR). MAINTENANCE AND CHECKS DAILY CHECKS DAILY CHECKS INSPECT AND NOTE THE OIL LEVEL AND ALL THE PRESSURE AND TEMPERATURE LEVELS(FILLL.
Container Stuffing and Stripping
The Vision for Space Exploration – Challenge & Opportunity ISS Panel Report Robert D. Cabana ISS Panel Chair March 30, 2005.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
Diesel Generator Reliability: Lessons Learned from Storms
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
CARBURETED FUEL SYSTEM
ENGINE CLEAN OIL TOOL OIL RX • 999 TRAINING
How To Replace Your Fuel Filter On a 1998 Mustang GT.
Equipment and Tool Institute June 18, Challenger Body Structure Diane Coopmans, Body Structures Engineering.
7. EMERGENCY RESPONSE RYERSON UNIVERSITY.
National Aeronautics and Space Administration Future space missions will take astronauts beyond Earth’s orbit. These exploration missions.
Produced by the Northwestern Indiana Regional Planning Commission Community Partnership Produced by the Northwestern Indiana Regional Planning Commission.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
TRENTON Casing Filler Presentation
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Model 12 Intek Horizontal OHV
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Inc 23/24 Integrated Team Review Intravenous Fluid Generation (IV Gen)
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
September 2009 Intravenous Fluid Generation (IV Gen) EXPERIMENT OVERVIEW.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Frankie Jernigan/ Kathy Roeske FD36/Operations Development Group /
APEX-04 SpaceX-10 Shawn Stephens – ESC Project Lead Colleen Huber – TOSC Project Lead.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Genuine N1. Conversion Installation manual LC 120 5D 2003
Temperature Test Allows monitoring of temperature changes.
Automotive Heating And Air Conditioning
Automotive Heating And Air Conditioning
X-Spot Lamp Socket Replacement Procedure
14 Refrigerant Recovery, Recycling, and Recharging.
Bilge Pump Service Project Model Service Kit
Service Procedure For Changing Engine Oil And An Oil Filter
Microscope Close-Out Photos
STEP 1: ASSEMBLE ANGLE PLATES
Servicing the Steering System
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
C Air Compressor Up-fit and Plumbing Guide For LDI B3
SP Oil / Water Separator Installation Guide
Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.
CHAPTER 45 Engine Lubrication.
Floating Head Heat Exchanger
TRENTON Casing Filler Presentation
NEW COMPLIANCE REGULATIONS
Cryomodule Assembly Plan
Presentation transcript:

National Aeronautics and Space Administration Microgravity Science Glovebox (MSG) Seal Exchange Overview February 2, 2006

( 2 ) MSG Seal Exchange Overview  All refurbishable parts to be pre-packed prior to ULF-1.1 except window  Descent manifest updated via CEF R0832  Metal parts that are cost prohibitive to replace, contain a replaceable expired rubber seal  Pre-pack should be scheduled to protect potential investigation operations  PFMI and InSPACE  All replacement parts manifested and at KSC  Window to be exchanged during docked operations  55 minutes of crew time required for complete window exchange  Remaining parts installed and stowed after ULF-1.1  Disposable parts to be trashed after replacement  Removable seals and filter cap with adapter  On-Orbit Leak Test performed to recertify MSG for sealed mode containment  Cartridge Adapter will eliminate need for Scavenge Pump and its resupply

( 3 ) Considerations for Return Plan  Minimize impact to on-orbit stowage  Optimize use of crew time  Minimize use of joint-ops crew time  Maintain a recovery plan in case of shuttle delay  Do not preclude reinstalling old parts  Refurbishable parts returned for use as future spares  Non-reusable parts to be discarded  Minimize impact to investigation operations

( 4 ) MSG Facility Items for ULF-1.1 Descent Descent Items Page 1 of 2

( 5 ) MSG Facility Items for ULF-1.1 Descent Descent Items Page 2 of 2  Most items are not installed on MSG Facility  64 Items to be returned  38 items can be pre-packed immediately with no impact to potential payload ops  25 items can be pre-packed with coordination with PromISS, PFMI, and InSPACE  1 item (window) is not pre-packed  10 Items will be removed and discarded after ULF-1.1 undock  Non-refurbishable items

( 6 ) Ascent Plan  All items required for seal replacement on manifest  Additional non-seals related items also manifested  All replacement parts manifested  R Add MSG PFMI Tapes to ULF-1.1  R MSG Manifest Change to ULF-1.1 Ascent/ Descent  Add Cartridge Adapter, Remove scavenge pump supplies, return scavenge pump  R Add spare front filters to ULF-1.1  R Add MSG Window, Filters, and supplies to ULF1.1 Ascent  R0776A - Update MSG Resupply on ULF1.1 Ascent  R0752- Additional MSG Resupply for ULF1.1 Ascent

( 7 ) MSG Facility Items for ULF-1.1 Ascent Ascent Items Page 1 of 2

( 8 ) MSG Facility Items for ULF-1.1 Ascent Ascent Items Page 2 of 2

( 9 ) Considerations for Window Exchange  Window Exchange plan presented at 10/26/05 PCB  PCB Chair directed exchange during docked ops  Optimize use of crew time  Splitting exchange into removal and installation increases crew time  Stow/Destow activities would be repeated, nearly double crew time  Stow/Destow activities are most significant crew time contributors  Minimize impact to on-orbit stowage  Avoid leaving window and packaging on orbit until next shuttle flight  Reuse ascent window packaging for return of old window

( 10 ) Transportation Packaging for Window

( 11 ) Window Exchange Procedure  MSG Front Window Exchange MGUEMSGN034  To be baselined by ECR E  Informally reviewed by crew office and ESA prior to ECR submission  Validated using Engineering Unit  Basic Steps  Retrieve tools and new window  Loosen 24 front window captive fasteners  Remove old window and temporarily secure  Remove new window from packaging and position onto MSG  Install four captive fasteners in center, then torque all fasteners  Label old window with IMS sticker and stow in packaging from new window  Stow tools  Uses ISS Standard Tools

( 12 ) Window Replacement Twenty four captive fasteners around the perimeter of the frame hold the window in place. An ISS 3mm hex head and driver is used to loosen fasteners. The same 3mm head is used with a torque driver to tighten the fasteners on the new window.

( 13 ) Window Size  Window size  7.70 kg  ~25” by 35”  Easily handled by one crew member  Window exchanged by one person on ground The MSG Front Window Assembly is shown during inspection at KSC.

( 14 ) Window Captive Fasteners The protruding threads of the captive fasteners are recessed in the window frame.

( 15 ) Exchange and Installation of Remaining Parts  Old Seals removed and marked for discard  2 Loading Port Seals  1 Airlock Top Lid Seal  1 Airlock Front Door Seal  1 Airlock Glove Ring Seal  Seals installed on Facility  2 Loading Port Seals  1 Airlock Top Lid Seal  1 Airlock Front Door Seal  13 Front Filters  3 Feedthroughs  All other parts placed in stowage

( 16 ) On-Orbit Leak Test  Verifies the containment provided by a physical barrier  Containment dependent upon properly functioning seals  Single method of containment for sealed mode  One of the two methods of containment for normal mode  Successful completion of test is basis for recertification of containment  Performed with MSG Facility Hardware

( 17 ) Development of Leak Test on EU  Development Test on EU  TPS #EI52-MSG-FU-032; results documented in TR05-MSG-003  Replicated Qualification Test run on FU prior to flight  MSG-BE-PR-0040  Test amended to minimize additional HW required on orbit  Test Results show EU’s old Norsorex seals failing leak test  Test Results also show EU’s new EPDM seals passing leak test  Newly-developed leak test was validated on EU

( 18 ) Leak Test Procedure Overview  Seal off Work Volume  Install Flapper Bank Covers  Install 6” Closed Glove Rings on Side Ports  Install Glove Rings with Glove Port Plugs on front  Install Filter Caps  One Filter Cap remains loose to allow AHU fans to lower WV pressure  Tape over AL Inlet  Pump down Work Volume  AHU Fans lower pressure in the work volume  WV pressure between 8 and 10 mbar below cabin pressure  Last filter cap is tightened and last glove port plug is installed  Monitor Differential Pressure from ground  Evaluate pressure decay against pass/fail criteria

( 19 ) Test Procedure Hardware This picture shows two of the three flapper banks covers installed. The flapper banks are the vents which allow air to return into the work volume. This picture shows the taped Airlock inlet and the installed filter caps.

( 20 ) MSG Cartridge Adapter vs. Scavenge Pump  Scavenge Pump used to clean up spilled liquids  Provides suction through an optional hose to Filter Cartridge  Filter Cartridge absorbs 20 ml of liquid  Scavenge Pump requires regular resupply  Replacement of limited-life o-ring and battery  Extension Hose has limited-life o-ring  Nitrile o-rings good for 3 years  Battery shelf life of 2 years  Cartridge Adapter allows alternate means of suction  Connects Filter Cartridge to Filter Cap with Adapter Hose  Uses suction provided by Work Volume Air Handling Unit fans  Filter Cap with Adapter Hose already used with Particle Catchers for cleaning up particulates  Cartridge Adapter requires no resupply

( 21 ) Logistics and Stowage Comparison Scavenge Pump Assembly P/N MSG1144 Extension Hose P/N MSG1045 Battery Cartridge Adapter P/N 96M Cartridge Adapter 0.03 kg 16 cm 3 Scavenge Pump 0.36 kg 436 cm 3 Extension Hose 0.11 kg 692 cm 3 Battery 0.15 kg 10 cm <<

( 22 ) MSG Cartridge Adapter Installation Filter Cap with Adapter Cartridge Adapter Filter Cartridge

( 23 ) MSG Cartridge Adapter Description  Materials already used elsewhere in Work Volume  Aluminum Alloy  Hard Black Anodize per MIL-A-8625  O-Ring made from V0747 Viton  Anodized Aluminum and Viton compatible with spilled materials  Hard Black Anodize provides standard material compatibility  Viton O-Ring compatible with all materials expected in Work Volume  Lifetime of Viton o-ring will outlast the MSG Facility itself  Adapter performance verified using Filter Cartridge  Picked up 20 ml of DI Water in Engineering Unit testing  Per MSG System Specification MSG-RIBRE-SPE-0001 Issue 4