N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.

Slides:



Advertisements
Similar presentations
Department of Environmental Protection CLEAN FILL POLICY
Advertisements

Erosion and Sediment Control General Permit (ESCGP-1)
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
About two months16/02/0612/01/06 This information is for your convenience and for the purpose of illustration only, and does not constitute part of the.
Contamination Cleanup Grant Program Implementation Workshop.
Institutional Controls Pamela Elkow and Richard Fil.
CODE ENFORCEMENT AS A REDEVELOPMENT TOOL: YOUR LEGAL TOOLBOX David N. Tolces, Esq. Goren, Cherof, Doody & Ezrol, P.A E. Commercial Blvd., #200 Fort.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Final Rulemaking Chapter 102 Erosion and Sediment Control and Stormwater Management Summary of Revisions.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.
Procurement.
Processing a Standard Foreclosure Bob Sagel Morgan County Public Trustee Foreclosure Checklist.
Patty Bartlett Logan County Treasurer / Public Trustee.
Platting Update Orange County BCC January 27, 2015.
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
FDA shall issue a certification for those FDA licensed establishments applying for amendment during the validity of their Licenses to Operate. This certification.
Module 7: Construction Phase
2014 Construction Conference N.C. Region Stormwater Erosion Control Engineer KEVIN GARRIGAN, P.E. (715) (715) (CELL)
Bureau of Land Management John Mann, P. E. Assistant State Engineer November 16-17, 2010 Bureau of Land Management John Mann, P. E. Assistant State Engineer.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Post Construction Stakeholder Involvement Charles Brown Town of Cary.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Redevelopment Grant Program Implementation Workshop Spring 2010.
Close-Outs Presented by Stacy Tedder NOAA Grants Management Division January 31,
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
1 Water Right Conveyances Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
AWARD MANAGEMENT Post Award By Maria Rojas College of Engineering Manager, Sponsored Programs.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Declaring Beneficial Use in Water Use Groups R
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
From the Beginning Design Standards and Other Post-Construction Program Elements.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March 2012.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
CGP Transfers and Terminations How does it end?. Transfers.
IPECA’s Annual UST Seminar Management & Compliance Assistance Legal Overview –FR & Implications on Compliance October 7, Indianapolis David R. Gillay,
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Public Workshop May 14, 2013 Alachua County Board of County Commissioners.
Arkansas Department of Emergency Management Arkansas’ Homeland Security & Preparedness Agency Sandy Recovery Improvement Act of 2013 Public Assistance.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Pollution Control: For Field Office Construction Sites.
Benefits of the Pre-Application Meeting Informal Pre Application Meeting Discuss general design concept Bring up any issues with meeting the regulations.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
1 Los Angeles County Santa Monica Mountains Local Implementation Plan Malibu Santa Monica Mountains Pepperdine Univ. Topanga County Beach Leo Carrillo.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
Welcome to Workforce 3 One U.S. Department of Labor Employment and Training Administration Webinar Date: November 3, 2015 Presented by: Office of Grants.
Uniform Environmental Covenants
Administration of a FIDIC Contract - Project Control
Critical Stages – What is required on the plan and in the field
Grant Orientation Session
What is Required to Achieve Worksheet 10
Handling offers.
City of Marathon Vacation Rental Training Session
Grant Orientation Session
Institutional Controls At Voluntary Cleanup Sites
Recognized Obligation Payment Schedule (ROPS) Certification Process
Presentation transcript:

N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016

Agenda 2 1.Instrument for the Declaration of Restrictions and Covenants (Instrument) 2.Post-Construction Stormwater Management (PCSM) Instrument Filing Notice 3.New Property Owner PCSM Best Management Practice(s) (BMP) Notification and Operation and Maintenance Agreement 4.NOTs – What forms to use 5.NOT Completeness Review and Fieldwork Checklist 6.Frequently Asked Questions

Instrument Filing 3 Instrument for the Declaration of Restrictions and Covenants Permittee or co-permittee are required to file the Instrument with the Recorder of Deeds office within 45 days from date of permit issuance or authorization (per permit condition) Per 25 PA Code §102.8(m)(2) the Instrument shall: o Identify PCSM BMP(s) o Provide access for long-term operation and maintenance of PCSM BMP(s) o Provide notice that the responsibility for long-term operation and maintenance of the PCSM BMP(s) is a covenant that runs with the land that is binding upon and enforceable by subsequent grantees

Instrument for the Declaration of Restrictions and Covenants cont’d. Documents attached as Appendices to the Instrument include: o Record drawings/as-builts or the approved PCSM Plan o Long-term Operation & Maintenance Plan (O&M Plan) 4 Instrument Filing

Instrument for the Declaration of Restrictions and Covenants cont’d. Available through the DEP Bureau of Waterways Engineering and Wetlands homepage, under NPDES/Construction/Erosion Control, then under Statutes, Regulations and Permits Construction-and-Erosion- Control/Pages/Statutes,RegulationsandPermits.aspx#.VsXjC_Mo59B Construction-and-Erosion- Control/Pages/Statutes,RegulationsandPermits.aspx#.VsXjC_Mo59B Revised January 2016 Should be developed in conjunction with permittee/co-permittee legal counsel 5 Instrument Filing

PCSM Instrument Filing 6 PCSM Instrument Filing Notice Assists the permittee with filing and the Recorder of Deeds Office with recording Instruments Developed in conjunction with Recorder of Deeds Office Document # is 3150-PM-BWEW0556 with a revision date of 6/2014 Available at:

7 New Property Owner PCSM BMP Notification and O&M Agreement o Notifies purchaser/grantee/transferee of PCSM BMP long-term O&M at time of purchase o Identifies PCSM BMPs and associated long-term O&M o Outlines inspection and reporting schedule o Specifies how access to PCSM BMPs will be achieved PCSM BMP Notification and O&M Agreement

New Property Owner PCSM BMP Notification and O&M Agreement cont’d. Available through the DEP Bureau of Waterways Engineering and Wetlands homepage, under NPDES/Construction/Erosion Control, then under Statutes, Regulations and Permits Construction-and-Erosion- Control/Pages/Statutes,RegulationsandPermits.aspx#.VsXjC_Mo 59B Construction-and-Erosion- Control/Pages/Statutes,RegulationsandPermits.aspx#.VsXjC_Mo 59B 8 PCSM BMP Notification and O&M Agreement

Why submit for N.O.T.? – It is a regulatory requirement and Permit condition – Proof of disclosure and Responsible Party – Permittee remains responsible until N.O.T. is approved – Actions by DEP Permit Termination

Which Form to Use? Document # is 3150-PM-BWEW0229a, with a revision date of 10/2015 Document # is 3150-PM-BWEW0229b, with a revision date of 9/2015 Available at: Permit Termination

Notice of Termination Form Sections 1 to 3 remain basic project information Section 4 – Long-term Operation and Maintenance or Restoration/Reclamation added Section 5 – Final Certification of Licensed Professional (regarding critical stages/as-builds)- corrections pending Section 6 – Proof of Instrument Filing with the Recorder of Deeds Office Section 7 – Permit Termination Certification Appendices A and B Completeness Review and Fieldwork Checklist added 11 Permit Termination

Notice of Termination - Commonwealth/Federally-Owned Property o Per 25 PA Code §102.8(m)(3), a covenant that runs with the land is not required until transfer of the land containing the PCSM BMP occurs o A complete NOT submission includes: Completed Sections 1-5, 7 Record drawings/as-builts Appendix A Completeness Review and Fieldwork Checklist 12 Permit Termination

Notice of Termination - Non-Commonwealth/Non-Federally- Owned Property o A complete NOT submission includes: Completed Sections 1-7 Record drawings/as-builts Copy of landowner notice(s) Copy of Recorder of Deeds Office receipt for instrument filing Appendices A and B Completeness Review and Fieldwork Checklist 13 Permit Termination

Notice of Termination - Restoration/Reclamation Activities o 25 PA Code §102.8(n) references regulated activities that require site restoration or reclamation – A complete NOT submission includes: Completed Sections 1-4, 7 Copy of record drawings/as-builts (PCSM Plan/Restoration Plan may be acceptable for restoration/reclamation sites) Completeness Review and Fieldwork Checklist 14 Permit Termination

15

Does an Instrument need to be amended if it was initially recorded with the PCSM Plan? The Instrument must accurately reflect the as-built conditions at the site. If the initial recording was not done with the Record Drawings/as-builts, then they are to be filed as an amendment to the Instrument once they become available. Who constitutes a licensed professional? 25 PA Code §102.1 defines a licensed professional as: professional engineers, landscape architects, geologists and land surveyors licensed to practice in this Commonwealth. 16 FAQs

Do NOTs need to be submitted for sites with expired permits? Yes. Per 25 PA Code §102.7(c), the permittee and co-permittee will remain responsible for compliance with the permit terms and conditions until they receive written NOT approval. What form should be used to remove a co-permittee from the permit? The new Co-Permittee Liability Release Form, document # 3150-FM-BWEW027 (dated 10/2015), should be used to remove a co-permittee from the permit. Can NOTs be submitted for phases or stages of a project ? Yes. 17 FAQs contd.

If the permittee has no plans to sell the property, does an Instrument still need to be filed? Yes. Long-term operation and maintenance of the PCSM BMPs is a covenant that runs with the land that is binding upon and enforceable by subsequent grantees. Can the pre-November 19, 2010, NOT form be used to terminate ESCGP 1/2? The Pre-November 19, 2010, NOT form applies to those ESCGPs submitted BEFORE November 19, All other ESCGP submissions are to use the post- November 19, 2010, form. When should permittee submit an NOT? When project is complete including permanent stabilization as defined in , i.e., uniform 70% perennial vegetative cover 18 FAQs contd.

19 Questions? Mark Lonergan or Trish Attardo Water Program Specialist (717)