Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
RedOffice.com Presentation templates Slide No. 1 RFA Detector Data of Electron Cloud Build-up and Simulations Eric Wilkinson Mentor: Jim Crittenden Cornell.
R. Cimino COULOMB’05, Senigallia, Sept 15, Surface related properties as an essential ingredient to e-cloud simulations. The problem of input parameters:
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Vacuum and Cryogenics observations for different bunch spacing J.M. Jimenez On behalf of CRG and VSC Groups with the contributions of G. Arduini, V. Baglin,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities fundamental limitations to the ultimate performance of high-luminosity.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
Electron-Cloud Activities for LHC Frank Zimmermann ICE Meeting,
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Preliminary Simulation on Electron Cloud Build-up in SppC Liu Yu Dong.
RADWG-RADMONLHC Beam Loss Rates1 Beam Loss mechanisms Where? Beam loss in cycle – when? Totals per fill: before and during physics Totals per annum Comparison.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
1 Electron clouds and vacuum pressure rise in RHIC Wolfram Fischer Thanks to M. Blaskiewicz, H. Huang, H.C. Hseuh, U. Iriso, S. Peggs, G. Rumolo, D. Trbojevic,
Main Activities and News from LHC e-Cloud Simulations Frank Zimmermann ICE Meeting 8 June 2011.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Electron cloud measurements in Cesr-TA during the July-August run for the SPSU Study Team, report by S. Calatroni and G. Rumolo thanks to J.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Electron Cloud Effects
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Francis Perez (ALBA) and Paolo Chiggiato (CERN)
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
Long Shutdown for the LHC: Vacuum Beam Pipes
MD2036: UFO dynamics studies and UFO fast detection
Electron cloud & vacuum pressure observations: 2011 proton run
Accelerator System - Vacuum
Electron cloud and collective effects in the FCC-ee Interaction Region
Requirements from the Vacuum Systems HE-LHC
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
The Status of the LHC machine
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Frank Zimmermann, Electron Cloud, LHC MAC 10. June 2005
Scrubbing progress - 10/12/2012
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Summary first Scrubbing test 31/10/2010
Scrubbing progress - 08/12/2012
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Cryogenic management of the LHC Run 2 dynamic heat loads
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Presentation transcript:

Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP

J.M. Jimenez – LMC, 20 Oct’10 Main Topics Introduction Electron Cloud Build-up Vacuum Cleaning / Scrubbing Closing Remarks

J.M. Jimenez – LMC, 20 Oct’10 Introduction Electron Cloud induced Pressure Blow-up in the SPS ring Red = P >10 -4 Pa, Green = P < Pa Bending areasStraight areasBending areas Mid arc 1-2 Mid arc 2-3 Mid arc 3-4 Mid arc 4-5 Mid arc 5-6 Mid arc 6-1 Mid arc 1-2 Mid arc 2-3 Mid arc 3-4 Mid arc 4-5 Mid arc Before the Scrubbing Run -

J.M. Jimenez – LMC, 20 Oct’10 Introduction [cont.] Electron Cloud Build-up Driving parameters Bunch Intensity –Threshold phenomenon Ramp and RF can shrink the bunches resulting in an increase of the beam potential and thus the energy kick to the electrons Bunch train –Number of bunches required to start the electron avalanche (18/20 1.1x10 11 p/bunch) Filling Pattern –Spacing between bunch train –Surviving low-energy electrons, seed electrons 3.5 TeV) Secondary Electron Yield (SEY)  –Reflectivity of low-energy electrons Stimulated Desorption Yields  –Energy of the electrons, state of the surface, temperature has limited effect Other parameters affecting the electron cloud build-up –Size of the beam vacuum pipe –Magnetic field: field free, dipole and quadrupole fields, crossing angles and orbit modifications / displacements, stray fields (solenoid) –Temperature of the beam pipe walls: effect of condensed gasses

J.M. Jimenez – LMC, 20 Oct’10 Introduction [cont.] Electron Cloud limiting factors in LHC Vacuum pressure rise –Interlock to the vacuum sector valves triggering the beam dump Cryogenic cooling capacity –Cannot run the scrubbing run above the cooling capacity in the capilaries Beam stability –Bunch instabilities Beam-gas scattering induced radiation –Radiation dose rates to cables and single events on electronics –Quench limit of the cryomagnets Background to Detectors –Limit acceptable by the detectors

J.M. Jimenez – LMC, 20 Oct’10 Electron Cloud Build-up Evidence of surviving electrons between bunch trains 225 ns between bunch trains550 ns between bunch trains 5.25  s between bunch trains Measurements made with 25 ns bunch spacing Low-energy electrons can survive long gaps without beams thus inducing a crosstalk between bunch train’s build-ups

J.M. Jimenez – LMC, 20 Oct’10 Electron Cloud Build-up [cont.] Surviving low-energy electrons and seed electrons Measurement made with 2 trains of 24 bunches with a 50 ns bunch 450 GeV Crosstalk between bunch train’s build-ups start at 10  s, increasing very quickly below 3  s bunch train spacing Seed photo-electrons to be considered above 2 TeV Secondary Electron Yield (SEY) measurement of a scrubbed copper sample Low-energy electrons are reflected by the surface R. Cimino, I.R. Collins, App. Surf. Sci. 235, , (2004)

J.M. Jimenez – LMC, 20 Oct’10 Vacuum Cleaning / Scrubbing Guidelines from SPS Measurements Measurements of the Pressure decrease in the SPS as a function of the cumulated LHC-type beam time Dipole field conditions showed a decrease by 15 in 58 hours Measurements of the Pressure decrease in the SPS as a function of the cumulated LHC-type beam time Field free conditions showed a decrease by 50 in 58 hours

J.M. Jimenez – LMC, 20 Oct’10 Vacuum Cleaning / Scrubbing IR1 Arcs extremities, left/right sides: Beam 1 (Blue) Beam Intensity on Beam 1 Very stable during the Fill

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing IR1 Triplets, left side: Beam 1 (Blue)

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing IR1 SAMs, left side: Beam 1 (Blue)

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing IR4 SAMs, left/right sides: Beam 1 (Blue)

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing IR1 LSS RT, left/right sides: Beam 1 (Blue)

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing IR4 LSS RT, left/right sides: Beam 1 (Blue)

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing IR6 LSS RT, MKD zone: Beam 1 (Blue)

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing Expected decrease of pressures with beam time No correlation between P Beam and position along the ring Pressure increase reduced by factor 2/3 within 3 hours

J.M. Jimenez – LMC, 20 Oct’10 Normalized  P vs. Cumulated Time of Beam in the machine 48Bunches at 450GeV – Buckets 31/10 01/11 04/11 All data refer to the NEG-NEG Transition in LSS3 for the same beam configuration at 00:18 AM: Fill 1459 with bunch spacing of 50ns 108 bunches and 12 buckets injection at 3:40:00 AM: Fill 1466 with bunch spacing of 50ns 108 Bunches and 24 buckets injection. During that fill due to the ALICE solenoid off/on the pressure around the IP2 is very high and variable. Did not succeed to ramp this fill at 3.5TeV before the “scrubbing” period was over. Pressures reached after the Scrubbing Run compatible with design values

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing Expected decrease of pressures with beam time Linear scale Valid for a given bunch intensity and filling pattern Cleaning/Scrubbing ONLY if running with ECloud! Memory effect will stay (partly/totally) for other schemes

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing  P as a function of the number of injected trains

J.M. Jimenez – LMC, 20 Oct’10 Beam Cleaning / Scrubbing Expected decrease  and  (calculations)

J.M. Jimenez – LMC, 20 Oct’10 Mitigation Solutions [Preliminary] Scrubbing Runs –Use maximum bunch intensity –Increase the number of bunches per train –Keep the beam potential at the highest – avoid beam emittance blow-up to keep the energy lick of the electrons to the maximum –Adjust the pressure interlocks to higher value where feasible Solenoids –Only applicable on Cold/Warm transitions and bellows of the long straight sections housing the Experimental Areas (IR1/2/5/8) Re-cooling sequence of SAM in case of failure of the cryogenics –Beam Screen is kept at a higher temperature than Cold Bore during normal cool down – Standard procedure –In case of stoppage of a cryoplant, same procedure shall be applied during the re- cooling of the SAMs Takes longer BUT is absolutely required to avoid gas condensation on Beam Screens!

J.M. Jimenez – LMC, 20 Oct’10 Closing Remarks Vacuum Cleaning versus Beam Scrubbing G. Vorlaufer et al., CERN VTN, 2000  max V. Baglin et al., Chamonix, 2001 Log scale for  versus linear scale for  (scrubbing) 6 orders of magnitude on  while  goes down to 1.4  impacts the pressure rise as  affects the electron cloud density Electrons with energies between 5 and 50 eV decrease  BUT their efficiency on the reduction of  is significantly lower Same dose

J.M. Jimenez – LMC, 20 Oct’10 Closing Remarks Evolution of the SEY=f(E) with the conditioning Courtesy of B. Henrist and N. Hilleret Total number of electrons contributing to the build up Number of secondary electrons generated by a primary electron