Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.

Slides:



Advertisements
Similar presentations
MVD A SSEMBLY T WO HALF FRAME DONE – D IMENSION T ESTED A NCILLARIES FOR F RAMES DONE – D IMENSION T ESTED F RAME A SSEMBLY & F INAL M ACHINING – MUST.
Advertisements

DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
Mitglied der Helmholtz-Gemeinschaft Straw Production: Status, Plans, Timelines Peter Wintz (IKP - FZ Jülich) (A. Cebulla, I. Georgadze, V. Kozlov, S. Orfanitski)
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STT gas system a possible implementation
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
“CENTRAL SUPPORT FRAME” -
STRAW TRACKER SYSTEM CAD STATUS :
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Micro Vertex Detector of PANDA Strip Detector
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
LumiCal mechanical design, integration with LDC and laser alignment
Requirements of the support mechanics
Chamber Design and Integration RE3/1 and RE4/1
IFR detector mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
SIT AND FTD DESIGN FOR ILD
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Central Tracker Cabling and Mechanics Paola Gianotti26/4/111

21-27 layers layers, from inner to outer radius:  8 Axial layers  4 Skewed double-layers (±2.89°)  5 Axial layers + 6 axial outer filling layers  2  2050 straws with 1200mm length  2  240 skewed straws with diff. length  4636 straws  4636 straws in total  All straws close-packed with <20µm gaps  Active volume ~ 85%  Active volume ~ 85% (of cylindr. vol. 160/410mm)  X/X 0 ~ 1.25%  X/X 0 ~ 1.25% ( 2 / 3 tube wall + 1 / 3 gas) STT Layout 26/4/11 One semi-barrel of STT Peter Wintz2

Geometrical constraints The Central Tracker (CT) has to fill a cylindrical volume surrounding the MicroVertex Detector and the target-beam cross pipe. Geometrical constrains are: int. Ø 150 mm, ext. Ø 418 mm, length 1500mm mm upstream for electronics and services This volume is split in two halves by the target-beam cross pipe mm 4200mm x y z y 1500mm 150mm 26/4/11Paola Gianotti3

Present layout Presently, two options are under developments. Both have to fit the same physical and mechanical requirements. We can therefore figure out a unique mechanical solution. 26/4/11Paola Gianotti4

26/4/11Paola Gianotti5 Following the idea of a STT made of planar double-layers a Light Mechanical Frame has been designed If the material of the Support Structure will be Aluminum: Density 2.7g/cm 3 Young’s modulus: 70 GPa Radiation Length (X o ): 9 cm Thermal expansion:24 ppm/°C Total weight of the structure is 8.2 kg If the material of the Support Structure will be Aluminum: Density 2.7g/cm 3 Young’s modulus: 70 GPa Radiation Length (X o ): 9 cm Thermal expansion:24 ppm/°C Total weight of the structure is 8.2 kg Internal bars can be removed STT detector assembly

Support Structure prototype 26/4/11Paola Gianotti6 FEM analysis results: maximum deflection 0.03 mm

Band prototypes STT support frame 26/4/11Paola Gianotti7 Fixing pin

Some minor refinements have been studied to reinforce the edge bands of the straw modules and to test new fixing tools for the end-plugs New fixing pin 26/4/11Paola Gianotti8

26/4/11Paola Gianotti9

26/4/11Paola Gianotti10

CENTRAL TRACKER MECHANICS INFN-LNF - SPAS -StrawTracker, Vertex Det., Cross Pipe are supported by a CENTRAL SUPPORT FRAME 26/4/11Paola Gianotti11 -CENTRAL SUPPORT FRAME PROTOTYPE: DONE ! -STRAW SUPPORT FRAME PROTOTYPE: DONE ! -AUXILIARY INSERTION STRUCTURE PROTOTYPE: DONE ! -VERTEX PROTOTYPE: UNDER DEVELOPMENT; -CROSS-PIPE PROTOTYPE: PLANNED IN THE NEXT MONTHS.

-CENTRAL SUPPORT FRAME IDEA. -CENTRAL SUPPORT FRAME PROTOTYPE- -CENTRAL TRACKER MECHANICS INFN-LNF - SPAS -THE PROTOTYPE OF THE CENTRAL SUPPORT FRAME HAS BEEN REALIZED IN THE INFN TURIN WORKSHOP. 26/4/11Paola Gianotti12

External support structure for assembly and insertion: Feb /4/11Paola Gianotti mm 1500mm

-AN AUXILIARY INSERTION STRUCTURE IS NEEDED; -CENTRAL SUPPOR FRAME PROTOTYPE; -STRAW SUPPORT FRAME PROTOTYPE. -AN AUXILIARY INSERTION STRUCTURE IS NEEDED; -CENTRAL SUPPOR FRAME PROTOTYPE; -STRAW SUPPORT FRAME PROTOTYPE. CENTRAL TRACKER MECHANICS INFN-LNF - SPAS 26/4/11Paola Gianotti14

26/4/11Paola Gianotti15 New Layout for Cable Routing after the March 2011 Meeting Patch Panels 1500mm

STT Cable Routing system 26/4/11Paola Gianotti16

Paola Gianotti17 Weight and Cabling for one half of STT -Half STT houses ~2100 straws + preams + HV straw weight less than 6 Kg frame structure 9 Kg 5 kg preamp boards + short cabling, 2100ch × 10cm, + HV 5 kg gas manifolds TOTAL WEIGHT ~ 25 Kg -FEE boards (discriminators, TDC, …) cooling system ? TOTAL WEIGHT ~ 20 kg? -10m cables gas tubes: 2.7 kg 20 rilsan tubes (10in-10out) (  5 mm, ~13.2 g/m, 1× gas line per 100 straws) signal cables:17 kg signal coax cables, 2100ch × 10m × 0.5mm 0.83 g/m HV cables: 80 kg for 60 HV channels (~1 mainframe), 3.5mm coax 130 g/m LV cables: 9.6 kg 64 LV double-cables 2.5mm x 10m 15g/m TOTAL WEIGHT 100 kg cable weight (20kg/m) Loads on STT Support Structure 26/4/11 Loads on Routing Support Structure

26/4/11Paola Gianotti mm 2 Cable arrangement

Electronics arrangement 26/4/11Paola Gianotti19

1500mm 26/4/11Paola Gianotti20

Backup 26/4/11Paola Gianotti21

26/4/11Paola Gianotti22

26/4/11Paola Gianotti23

26/4/11Paola Gianotti24

-“ROUTING SUPPORT STRUCTURE” LOADS ANALYSIS (Loads for 1.5m cables)- - Gas rilsan tubes: 4 dia.20mm (In-Out Main Lines): ,40Kg - Signal cables: signals coax cables chx3mx0.5mm: ,55Kg - HV Cables: for 60 HV channels - (1 mainframe), 3.5mm coax: ,0Kg - LV cables: 64 LV double-cables - 2.5mmx5m: ,50Kg TOTAL: ,00Kg -“STT TRACKER” LOADS ANALYSIS (Half STT houses 2600 straws + preams + HV)- -Straw weight: ,5Kg - Frame structure: ,0Kg - Preamp board + short cabling – 2600ch x 10cm + HV:---6,0Kg - Gas manifolds: ,0Kg - FEE boards (discriminators, TDC,….): ? - Cooling system: ? -ANALYSIS FOR AN HALF “SST TRACKER”- - Needed space: 5000mm^2 - See detailed “constrain reactions” 26/4/11Paola Gianotti25

26/4/11Paola Gianotti26