Markus Gaug, CCF-Meeting, Barcelona 26-28 Oct. 2015 Oct. 26 th, 2015 1 Status of the IFAE/UAB Raman LIDAR Markus Gaug Universitat Autònoma de Barcelona.

Slides:



Advertisements
Similar presentations
Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.
Advertisements

Waveguides Part 2 Rectangular Waveguides Dielectric Waveguide
OL 750 Diffuse Spectral Reflectance Measurement System
Spectral Resolution and Spectrometers
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Spectral Resolution and Spectrometers A Brief Guide to Understanding and Obtaining the Proper Resolution of the 785 Raman System.
The HDF Group HDF4 Mapping Status and Proposal Mike Folk, Ruth Aydt The HDF Group Oct. 17, 2012 Apr , 2012HDF/HDF-EOS Workshop XV.
Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay Japanese Labs. : KEK, ATF.
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
2013 LIDAR'S TELESCOPE AUTO-ALIGNMENT SYSTEM FOR CTA Auteurs principaux : Mr. PALLOTTA, Juan Co-auteurs : Dr. RISTORI, Pablo 1 ; Dr. OTERO, Lidia 1 ; Mr.
European Gravitational Observatory25/01/20061 Alignment : Hardware & Software Status Henrich Heitmann, Julien Marque with the contribution of: INFN Frascati,
Software Project Transition Planning
Fiber Optics Defining Characteristics: Numerical Aperture Spectral Transmission Diameter.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Toshimichi Otsubo Mihoko Kobayashi Hitotsubashi University 1 Optical Response Simulation for ASTRO-G Laser Reflector Array Hiroo Kunimori National Institute.
HBD Transmission Monitor: Update on Assembly & Testing HBD Working Group Meeting 8/29/06 B. Azmoun Brookhaven National Lab.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
S/W Project Management
GWADW, May 2012, Hawaii D. Friedrich ICRR, The University of Tokyo K. Agatsuma, S. Sakata, T. Mori, S. Kawamura QRPN Experiment with Suspended 20mg Mirrors.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Precise wavelength reference for Spirou F. Pepe, F. Wildi, B. Chazelas, C. Lovis, S. Udry.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
Second GALION Workshop, WMO, Geneva, 20 ‐ 23 September 2010 A d v a n c e d L I D A R S y s t e m s Established in Athens, Greece in 2002 COMPANY SCOPE.
TOLNet/UAH Station Report – Operation, Upgrade, and Future Plan TOLNet Working Group Meeting, NOAA/ESRL/CSD, Boulder, CO June 16 15:30, 2015
干涉仪实验 Michelson interferometer Sliver mirror Sliver mirror with piezo Sliver mirror HeNe source.
Universitat Autònoma de BarcelonaSplit, October 2002.
Stabilization of Focus at ATF2 David Urner University of Oxford.
GSFC Scanning Holographic Receivers for Air and Space Geary Schwemmer Meeting of the Working Group on Space-based Lidar Winds Sedona, Arizona January 27.
Status of the development of Mini-Camera for the 1 st LST camera. Toko Konan Univ. Japan A test module for the 1 st LST camera, which is called.
Test Readiness Review 23 October 2003 CRAL - LYON.
Linac Status June 16, 2015 Time Meeting D. Raparia.
Working Technologically Early Stage 1 – Stage 3. Students evaluate by: recounting the steps taken to reach a final solution discussing their likes and.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka.
Ceilometer absolute calibration to calculate aerosol extensive properties Giovanni Martucci Alexander Marc de Huu Martin Tschannen.
Editing Status of Accelerator Systems R&D, CesrTA, ATF2 as of Sep.10 K. Yokoya.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Almega. Visible Raman Microscope
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
1 Progress of the Thomson Scattering Experiment on HSX K. Zhai, F.S.B. Anderson, D.T. Anderson HSX Plasma Laboratory, UW-Madison Bill Mason PSL, UW-Madison,
MAGIC II Mirrors Features Production Calendar M.Doro for the Padova group MAGIC Collaboration Meeting Sofia May, (2007)
Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.
Characterization of a strip crystal previously in use at FNAL Vincenzo Guidi, Andrea Mazzolari CERN, March 24, 2009 University of Ferrara and INFN - Italy.
Status Francisco Rogelio Palomo University of Sevilla nTOF meeting Lisbon, 13 th -15 th Dec 2011.
Topic report C. C. Tsai Speaker: C. C. Tsai Adviser: Dr. S. L. Huang 2011/12/29 Specification of handheld probe for dermatology 2016/6/111.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Atmospheric Monitoring for the MAGIC Telescopes Markus Gaug 1,2, Michele Doro 1,2,3, Daniel Garrido 1,2, Christian Fruck 4 for the MAGIC Collaboration.
Status of IFAE/UAB Raman LIDAR Lluís Font and Markus Gaug UAB & CERES-IEEC Central Calibration Facilities meeting Barcelona June 2016.
Sept 16, 2005Ast 920 Meeting 21 Astronomy 920 Commissioning of the Prime Focus Imaging Spectrograph Meeting 2 Intro; VPH Grating Spectroscopy Ken Nordsieck.
LASER SAFETY Reminder EXSO EP HSE AD Hall 18 November 2016 S. DETRAZ
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
Pulse energy measurement for the CTF lasers.
Mirror Alignment Using Dual Beam Laser
QUBIC Meeting MDP Sept LAL - Orsay
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Weather monitoring status and ORM
Interferometric measurements on mirrors
Dual Laser Fiber Launch System
Accelerator Physics Technical System Group Review
LIGO Photon Calibrators
Thesis work, year 2005 Student: Davide Rossi, Tutor: Giovanna Sansoni
Status of the Calibration
Presentation transcript:

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, Status of the IFAE/UAB Raman LIDAR Markus Gaug Universitat Autònoma de Barcelona + Oscar Abril (IFAE) + Oscar Blanch (IFAE) + Oriol Calpe (UAB) + Michele Doro (INFN Padova) + Lluís Font (UAB) + Daniel Guberman (IFAE) + Manel Martínez (IFAE)

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 Situation in  Funding for LIDAR has failed unexpectedly this year (as most Spanish funding proposals in 2015)  Workshop at IFAE has become heavily involved in bogies for LST, LIDAR has dropped to lowest priority

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 Achievements in 2015 (practically w/o funds...) 3 Hardware:  Polychromator has started production and assembling (but workshop not yet fully dedicated).  Installed new dichroic guiding mirrors,  Received permission to operate LIDAR (from 1-3 am)  Aligned the LIDAR in zenith position (fine-alignment still ongoing)  Unfortunately, laser needs some additional maintenance Software:  Library to read Licel files ready  Internal communication translated from Labview to C (in process) Documentation:  Finished one bachelor thesis on pre-alignment (Eudald Font)  Another bachelor thesis on alignment and near-range solutions is on-going (Oriol Calpe)  Constantly update a LIDAR TDR  ICDs created (except for the one with ACTL) New ideas:  Near-range solution

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 Polychromator 4

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 New dichroic guiding mirrors 5 Tailored by “OptoPrim”, Italy. Reflect >97% at 355 and 532 nm, but <10% at 1064 (at correct incidence angle of 61 deg,)

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 LIDAR alignment 6 The position where we started aligning

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 LIDAR alignment 7 The position where we stopped gross alignment and started fine- tuning.

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 LIDAR alignment 8

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 LIDAR alignment 9 23/07: “calima”

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 LIDAR Alignment prel. results

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 LIDAR Alignment prel. results

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 Documentation 12

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 FC/PC-Connectorized UV-Enhanced Aluminum Reflective Collimators (RC12SMA-F01 by Thorlabs) Colimador reflector 250 – 450 nm 12 mm dia. beam Conector SMA 0.39 NA TECS-Clad Multimode Optical Fiber 1,5 mm diàmetre (!!) SMA Conectors SMA entrance and exit Negligible attenuation at 355 and 532 nm Total cost up to here: 1400 eur. Additional (simple) 2-line polychromator unit Near-range solution(s) 13

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 Near range solution(s) 14

Markus Gaug, CCF-Meeting, Barcelona Oct Oct. 26 th, 2015 Outlook Have applied for new funds from Once polychromator is assembled, LIDAR can start long-term tests (e.g. in La Palma) After long-term test and evaluation, move to unified design with LUPM for final LIDAR for CTA-N. Final LIDAR planned to be ready in