HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Workflow Session Pier Giorgio Marchetti European Space Agency
Advertisements

Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
HMA CDR, 5-6 September 2006, Frascati Slide 1 HMA Catalogue Update Presented By Paul Kopp On behalf of Jolyon Martin, ESA Summarising many presentations.
Jürgen Walther Office of the Interministerial Committee for Geo Information (IMAGI) Coordination Office GDI-DE Federal Agency for Cartography and Geodesy.
Page 1 Federated Earth Observation (FedEO) Status CEOS WGISS Meeting #40 28 Sep – 02 Oct, 2015 Harwell, UK Hosted by UKSA M.Albani, P.Mougnaud, A.Della.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
HMA-FO ODA, February 2010 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Preliminary.
Welcome to the 2009 SSE Service Providers Workshop ESA - ESRIN, Frascati, Rome.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 AR Meeting 15 July 2009 S. Gianfranceschi, Intecs.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
Frascati, 2-3 July 2008 Slide 1 HMA User Management in G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Fabrice Brito, Terradue Srl
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Evolution and Perspectives for SSE Y. Coene, Spacebel s.a. M. Gilles, Spacebel s.a ESA - ESRIN, Frascati, Rome.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 FP 14 December 2009 S. Gianfranceschi, Intecs.
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
ESA-FAO GEOPortal STATUS & PLANS
HMA Identity Management Status
HMA Follow On Activities
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
DREAM High-Level Architecture
CEOS OpenSearch Project II
HMA Follow On Activities
WPS updates from ESA Projects
HMA Identity Management Status
IMAA-CNR activity report
EO Profile of GML and HMA Product Catalog for VITO CVB
HMA SPS Mandatory I/F Development
SMAAD Project Summary SMAAD Final Presentation – updated for
CEOS OpenSearch Project II
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
Overview of HMA/DAIL Overview of HMA ICDs HMA implementation at ESA
HMA Follow On Activities
CEOS OpenSearch Project II
Contributions to Testing and Reference Data
HMA Follow On Activities
Standardisation Status Update
HMA for Science Cataloguing of ISO Metadata (CIM) using the ebRIM
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
Web Service Security support in the SSE Toolbox
CITE tests for and HMA-T Phase 2 Progress Meeting
CEOS OpenSearch Conformance Test Document
HMA Follow-on Kickoff Meeting
HMA-T: “EO GML” and “EO ebRIM CSW” for VITO CVB
OGC and activities HMA-T Phase 2 KO Meeting
CITE tests for and HMA-T Phase 2, FP Meeting
Pier Giorgio Marchetti - European Space Agency
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
CNR-IMAA Proposal ( and )
EO profile for WMS progress report
Presentation transcript:

HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL

HMA-T Phase 2 KO, 2-3 July 2008 Slide 2 Agenda  See separate MS-Word File

HMA-T Phase 2 KO, 2-3 July 2008 Slide 3 Agenda

HMA-T Phase 2 KO, 2-3 July 2008 Slide 4 Overview  Project Objectives  Overview subjects  Tools  Baseline  Schedule and Reviews  Project Reporting  Actions

HMA-T Phase 2 KO, 2-3 July 2008 Slide 5 HMA-T Objectives 1. Permit evolution and test of HMA interoperability standards in parallel with EODAIL-Implementation and implementation of I/F with Partner G/S. 2. Permit conformance testing of any HMA adopted standards. 3. Support take-up of HMA defined standards by European Institutional Users and geospatial software product developers

HMA-T Phase 2 KO, 2-3 July 2008 Slide 6 ITT Phase 2  Closing date 14 April 2008  10 (partial) Proposals selected by TEB. Allocated budget approximately XXX KEUR. Become subcontractors of SPACEBEL.  Selected organisations notified 27 May  KO (i.e. T0) 2-3 July in ESRIN

HMA-T Phase 2 KO, 2-3 July 2008 Slide 7 HMA-T Phase 2  Support evolution of specifications OGC EO Extension Package for ebRIM (ERDAS) OGC ISO Extension Package for ebRIM (ERDAS)

HMA-T Phase 2 KO, 2-3 July 2008 Slide 8 HMA-T Phase 2  Conformance Testing (CITE) OGC EO Extension Package for ebRIM  IGN  CNR-IMAA OGC ISO Extension Package for ebRIM  IGN  CNR-IMAA  Conterra (base level conformance + INSPIRE guidance) OGC User management for EO  Terradue  Intecs

HMA-T Phase 2 KO, 2-3 July 2008 Slide 9 HMA-T Phase 2  Support uptake of HMA standards OGC EO Profile of GML applied to VITO synthesis products (GIM) OGC EO Extension Package for ebRIM applied to VITO synthesis products (GIM, VITO, ERDAS) OGC EO Extension Package for ebRIM for WS-Dali (Spot Image, ERDAS) OGC EO Profile of SPS implementation for Radar – Earth Explorer (Deimos) and Optical (Spot Image) OGC User Management integration with G-POD Grid (Terradue)

HMA-T Phase 2 KO, 2-3 July 2008 Slide 10 HMA-T Phase 2  Open-source support of HMA standards OGC User Management - Open-source SSE toolbox implementation (Intecs) OGC EO Profile WMS open-source implementation – based on UMN Mapserver (Infoterra) OGC EO Extension Package for ebRIM implementation in opensource Gi-cat (CNR-IMAA) OGC ISO Extension Package for ebRIM implementation in opensource Gi-cat (CNR-IMAA)

HMA-T Phase 2 KO, 2-3 July 2008 Slide 11 Overview  Project Objectives  Overview subjects  Tools  Baseline  Schedule and Reviews  Project Reporting  Actions

HMA-T Phase 2 KO, 2-3 July 2008 Slide 12 Project Tools  Action & SNCR Tracking  Project Wiki, Forum  TEAM/CITE engine  SSE Testbed  See also Project Management Plan: Issue 1.3

HMA-T Phase 2 KO, 2-3 July 2008 Slide 13 Project Tools – Action Tracking  Action and SNCR Tracking Internet-base, IP protected. Login/password per organisation.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 14 Project Tools - Wiki  Wiki & Forum Register on to obtain login name and password.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 15 Project Tools - Skeleton  HMA Skeleton Simulates various HMA protocols Available from Wiki.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 16 Project Tools - Skeleton Supports: Catalogue, Ordering, Programming, User Management

HMA-T Phase 2 KO, 2-3 July 2008 Slide 17 Project Tools - SSE  SSE Permanent Testbed Services.eoportal.org and services-test.eoportal.org Provides also access to HMA ICDs and HMA Skeleton.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 18 Project Tools  Project Directory See last page of Software Project Management Plan Corrections/updates to be communicated ASAP. alias

HMA-T Phase 2 KO, 2-3 July 2008 Slide 19 Overview  Project Objectives  Overview subjects  Tools  Baseline  Schedule and Reviews  Project Reporting  Actions

HMA-T Phase 2 KO, 2-3 July 2008 Slide 20 Project Baseline  Issues: ICD updates as part of Phase 2 (ERDAS)  OGC , OGC ICD updates expected during Phase 2 by external "events":  HMA-E: OGC – (expected july)  DAIL-Implementation: OGC (expected october)  DAIL-Implementation agreed RIDS on baseline (OGC etc.).  OGC CAT WG: ebRIM ?  FP7 GIGAS ICD updates if problems found with HMA-T CITE tests ?  OGC  OGC  OGC

HMA-T Phase 2 KO, 2-3 July 2008 Slide 21 Project Baseline  Best effort and flexibility expected from all partners to use latest ICD versions when they become available. Reserve budget for final consolidation at end of project (e.g. AR to FP).  Current: OGC , GML Application Schema for EO Products, Version 0.9.1, 01/08/2007. (<< More recent already available) OGC , EO Products Extension Package for ebRIM (ISO/TS ) Profile of CSW 2.0, Version 0.2.0, 25/06/2008. OGC , Cataloguing of ISO Metadata (CIM) using the ebRIM profile of CS-W, version 0.1.8, 21/11/2007 OGC Opengis Sensor Planning Service Application Profile for EO Sensors, version 0.9.5, 19/11/2007.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 22 Project Baseline OGC User Management Interfaces for Earth Observation Services, Version 0.0.2, 23/04/2008. OGC OpenGIS Web Map Services - Application Profile for EO Products, Version 0.2.0, 15/06/2007.  Up-to-date HMA-T project baseline will be put on HMA-T Wiki. Will be controlled via HMA-T Change Control Board.  Latest working versions (not yet baseline) will also be made available for information via HMA-T Wiki.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 23 Other Project Inputs  Selected HMA-T Phase 1 outputs: CITE test assertions HMA-T Phase 1 for OGC “Proposed Compliance levels for OGC ”, HMAT-TN SPB, Issue 1, revision 1, 2/06/2008.  Early ERGO project outputs Relevant for TEAM CITE tests for SOAP HMA-T Phase 1 tests converted to use To be agreed/confirmed with Agency. See also ERGO presentation on Day 1.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 24 Overview  Project Objectives  Overview subjects  Tools  Baseline  Schedule and Reviews  Project Reporting  Actions

HMA-T Phase 2 KO, 2-3 July 2008 Slide 25 Schedule and Reviews  Issues: Only physical meetings for KO, AR and FP required in ITT Partners propose short(er) and long plannings. Several partners have PDR and CDR deliverables in their Proposal.  Proposal: Each partner reschedules according to one of the two possible plannings (see next slide). Two Acceptance Review events planned.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 26 Schedule and Reviews  These are tentative dates.  Additional ad-hoc progress meetings at OGC TC Meetings.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 27 Proposed Payment Plan  To be confirmed by all organisations and accepted by ESA.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 28 Overview  Project Objectives  Overview subjects  Tools  Baseline  Schedule and Reviews  Project Reporting  Actions

HMA-T Phase 2 KO, 2-3 July 2008 Slide 29 Progress Reporting  Monthly Reports Contractual: Word Document per subcontractor Technical Progress: Wiki Page per month. Predefined section headings.  Monthly Teleconferences Teleconf unless already a meeting in same month. T0+2M, 4M, 6M, 8M Grouped per subject. Dates will be in update of SPMP.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 30 Actions  All partners to: Update deliverables list and schedule in line with harmonised planning for inclusion in SPMP update. Provide IP information for access to action tracking tool. Provide abstract of their Phase 2 task in appropriate section on HMA-T Wiki (TBC) – one page per partner.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 31 Agenda  See separate MS-Word File

HMA-T Phase 2 KO, 2-3 July 2008 Slide 32 Presentations  Objectives: Present work packages, deliverables and planning Raise issues if any Address various remarks raised by TEB Allow other organisations to identify possible overlaps, cooperation, synergies etc.

HMA-T Phase 2 KO, 2-3 July 2008 Slide 33 Conclusion  Possible synergies to be exploited: Harmonised planning across all participants CITE development according to "short planning": AR-1 Same TEAM engine version with extentions (for SOAP 1.1 and 1.2 –TBC): input from ERGO/HMA-E by Intecs. Sharing (on Wiki) available:  Reference implementation (and test) end-points  Reference datasets CITE development aiming for similar deliverables and deliverable structure/content allowing for integration into single OGC "ATS" document (per spec):  ATS – Abstract Test Suite documentation. IGN Proposal ?  Acceptance Test Plan for ATS  ETS – Executable Test Suite documentation

HMA-T Phase 2 KO, 2-3 July 2008 Slide 34  Clients SSE  FEDEO clearinghouse TEAM engine Toolbox Skeleton EOLI SA (Jan 2009 ?) CNES Charter catalogue GIM WMS client (SAS project)  Servers Skeleton SPS (Spot, Deimos) WMS Toolbox (PEP + gateway) G-POD service(s) GI-cat catalogue ERGO catalogue EO Proxy (VITO) EO Proxy (Dali) HMA-E reference platform and (Sept. '08) Proxy for MUIS (which version?) Charter catalogue

HMA-T Phase 2 KO, 2-3 July 2008 Slide 35 Possible Client/Server combinations  Compliance test baseline Skeleton and test data to be updated for new (SPS) and (when adopted for HMA-T) ESA to provide Envisat and MERIS metadata for and sample requests, corresponding responses and metadata (EO GML, ISO 19139). Spot Image to provide the same for Spot for use in the skeleton. Skeleton to be accessed by SSE Portal Skeleton to be accessed by TEAM engine (at ESA). Skeleton to be accessed by Team engine in the SSE Toolbox  Demonstration baseline

HMA-T Phase 2 KO, 2-3 July 2008 Slide 36  WMS (HTTP binding) TEAM engine SSE WebMapServer  Identity Mgt TEAM engine in SSE Toolbox as client (with SOAP header support) SSE Portal (after integration of DAIL Portal UM capabilities in Framecontract WP340) Future version of Skeleton will support the UM ICD.