STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP5.3940.8804.7299.56.62056.9.

Slides:



Advertisements
Similar presentations
Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
Advertisements

Electronic Soft Starters for Marine & Offshore Applications
Ghana’s Power Outlook 1. Generation Sources 2 Currently, VRA contributes 75% of the total generation.
ENERGY EFFICIENT STORAGE By Er.V.Vallivel, M.E Assistant Executive Engineer/ MRT/ TNEB/ Muppanda l RENEWABLE ENERGY SOURCES-TAMIL NADU/ INDIA.
Madhav Solar (Vadodara Rooftop) Private Limited Be a partner of Madhav Group to develop Vadodara into Solar city.
The ice machines are available at various capacities and can be placed where needed in the site. Capacities range from 3 to 70 tons per day. The ice is.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
Springfield Power & Light. 4% of Total Electric Sales (GWh)320 Capacity Factor of Solar Panels20% Generation Capacity (GW DC )0.183 Installation Cost.
©2014 Storelectric Ltd Making Renewable Energy Profitable and Traditional Energy Efficient Storelectric Ltd Compressed Air Energy Storage.
The Importance of Hydropower and the Dam of Włoczławek
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
 It is mechanism for producing electric power.  Wind power plants are installed in windy places.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Endend /01 PPT10/03/99 Diesel business. endend What can the Diesel Business offer? Individual diesel engine packages up to 15 MW or Total diesel.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
THERMAL POWERTECH CORPORATION INDIA LTD (TPCIL). 2 JV Structure With more than 48 years of Construction Experience Gayatri Group has established itself.
Chapter 3 Wind Power of the world. 3.1 Development and utilization of wind energy in China  Wind power generation  Wind farm construction.
SINTEF Energy Research 1 Planning And Operation Of Large Wind Farms In Areas With Limited Power Transfer Capacity by M. Korpås, J. O. Tande, K. Uhlen,
California Energy Commission Drought Impacts on Electricity Generation Joint Workshop on California’s Drought Response Sylvia Bender, Deputy Director Energy.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
W E L C O M E Power Grid Corporation of India Limited.
Biggest hydroelectric power plants in world
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1. In combined cycle power plant (CCPP), the Brayton cycle & Rankine cycles are combined. 2.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
Key Findings Utility & Environmental Implications Table 5b: Generation capacity mix at selected energy tax rates in year 2025 Issue 1 Energy Tax Power.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC.
(1). I.Introduction  The current situation of Energy Sector in Palestine II.The Strategic Objectives III.Energy Efficiency and Renewable Energy A.Strategic.
1 11-SOCIAL MARKETING. ACUTE POWER SHORTAGE IN INDIA, WITH PARTICULAR REFERENCE TO MAHARASHTRA & MUMBAI.
بسم الله الرحمن الرحيم General Information Total Installed Capacity PLAN 2015 =3155 MAX Load =2296 MW demand– 2015 =11793GWH Number of Customers2014.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
Condensing Hydronic Heat Exchangers Make-Up Air Units Meets.
Recent Advances in Solar Power Technology. Total Installed Electricity Capacity worldwide is about GW Worldwide solar PV installation.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
Variable Load on Power Stations
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Terms & Definitions.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
UTILISATION OF IDLING CAPACITY OF CAPTIVE POWER PLANTS-A VIABLE ALTERNATIVE BHANU BHUSHAN DIRECTOR(OPERATION),POWERGRID.
Solar Energy. What is solar energy??? Solar energy is energy received from sun which is converted into electrical energy with the help of solar cells.
Applications of Solar Energy for Biodiesel Production Natthaphob Nimpitiwan, Ph.D. Sountaree Ratapasakorn.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
North Coast Wind Farm Tolano Environmental Consulting.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
SOFTCON SYSTEMS PRIVATE LIMITED PROJECTS.  QATAR PETROLEUM (QP) revamping and upgradation work of North Field ALFA Offshore Platform work  HEAVY HYUNDAI.
1. WHY THE NEED OF RESOURCE CONSERVATION?  Resources are limited.  Pulp & Paper industry strongly dependent on natural resources.  High Energy & water.
Biomass GEM assumptions Erwan Hemery 12 May 2009.
Vishakhapatnam Steel Plant (VSP) Andhra Pradesh ( Southern India) GTS, Inc. PO Box 799, Shalimar, FL USA Phone:
Wind power variation: a highly variable, unreliable and unpredictable source of energy Facts and statistics from the largest wind generator in Germany.
ENERGY CONSERVATION IN SR - A CASE STUDY
First in Service First in Value
HPP USTIKOLINA Sarajevo, May 2017.
Non-ideal Power Supply
Renewable Integration
POWER MISSION Energy Efficiency is the key CAPACITY BY 2020 Nuclear
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Wind Power.
Presentation transcript:

STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP KAR KER TN PONDY MW

STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP KAR KER TN PONDY GWh

STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE) LOAD FACTOR StatesHydroSteamDieselGasWindTotal AP KAR KER TN PONDY

List of CPPs along with MW quantum applied for STOA and approved NAME OF THE CPP STATE MAX MW NAVABHARATANDHRA PRADESH 50 JSWELKARNATAKA190 UGARSWLKARNATAKA25 GSMLKARNATAKA16 VSLKARNATAKA7.5 GELKARNATAKA4

List of CPPs along with MW quantum supplying power to Andhra Pradesh NAME OF PLANT RATE Rs. MAX MW VSP HEAVY WATER PLANT NAVABHARAT RCL2.6015