G Bellodi - L4BCC meeting – 26/05/2011. 26/05/2011 G Bellodi - L4BCC - meeting BE/ABP Setting requirements & specifications Coordination (G Bellodi) OP.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
1 1. Some recent views ( ) 2 Linac tunnel
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
New PSB Beam Control Upgrade of daughter cards Alfred Blas PSB rf Working group meeting 24/03/ Generation of REV clocks 2.Synchronization with.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
RF source, volume and caesiated extraction simulations (e-dump)
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
RF acceleration and transverse damper systems
Experience with beam instrumentation at Linac4
J.-L. Sanchez Alvarez(PSB-EIC)
ELENA installation and commissioning status
EC Activities Status for the LIU
BE-BI Software for LINAC4
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Status of the BI Work Package in the LIU-PSB frame
HALF SECTOR TEST: a test for the future PSB injection
PSB rf manipulations PSB cavities
PSB Injection scheme in the Linac 4 era
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
commissioning and measurements
(Beam) Commissioning Plan
Presentation transcript:

G Bellodi - L4BCC meeting – 26/05/2011

26/05/2011 G Bellodi - L4BCC - meeting BE/ABP Setting requirements & specifications Coordination (G Bellodi) OP group, application programming (J-L Sanchez Alvarez) Individual equipment groups, FESA front-end software BE/CO Control systems, HW infrastructure.. (I Kozsar)

26/05/2011 G Bellodi - L4BCC - meeting

26/05/2011 G Bellodi - L4BCC - meeting E-logbook – already in use CCM/Working-sets available Alarms – LASER extension Vacuum – PVSS extension ? Radiation – RAMSES Interlocks – application, FESA classes already existing, only needs deployment (B Puccio and team, done in the past but first time Linux installation)

EquipmentCommentsNeeded forUse beyond 2013Status SEM grid application - 02/2011 Yes Done Spectrometer application Above+ NMR calibration, magnet cycling, plane conversion 09/2011 No (LBS?) In development Wire scanners Upgrade ISOLDE appl.09/2011 Yes In development Emittance meter application Stand-alone LabView09/2011 No In development Bunch shape monitor (Feshenko) Stand-alone09/2011YesProvided by externals Halo monitor Stand-alone09/2011No Existing, to be tested, check for maintenance BCTs Knobs, working sets and OPDisplay config 09/2011 Yes FESA scheduled for summer 2011 BPMs Knobs, working sets and OPDisplay config (orbit viewer) 09/2011 Yes FESA scheduled for summer 2011 Time of Flight In FESA 09/2011 Yes FESA scheduled for summer 2011 G Bellodi - L4BCC - meeting 26/05/2011

G Bellodi - L4BCC - meeting LEM screenshot x vs x’ -Separate LEM +  reconstruction -Originally on different platforms & not very user- friendly (need to set a lot of parameters to launch a scan, very easy to make mistakes, BI colleagues only experts at the moment) -Work ongoing towards one single application performing scan and emittance reconstruction 26/05/2011  Evgeny’s talk

G Bellodi - L4BCC - meeting Current 3 MeV proton source application. Plans for more sophisticated control system being drafted for L4 H- source. 26/05/2011

G Bellodi - L4BCC - meeting 1.First phase of manual testing to calibrate obtained deviaton vs voltage applied (DC operation) 2. Tests of AC operation and beam time structure with halo monitor. Proposal under discussion : 1.Initially (2012) use existing BE-CO timing cards with a resolution of 25ns to provide bunch sequences for tests of basic chopper functionalities. Possibility to use RF LHC-style hardware if finer resolution (sub-ns) is required. Standard controls solution: FESA class already available. OP customisation if needed. 2.End 2012: LLRF development at 352MHz. Commissioning time slot should be planned for testing simple beam sequences at 3 MeV in the tunnel, as starting point for a full LLRF validation and more complex tests of L4 synchronisation to the PSB and beam production schemes. FESA classes provided by RF. Simple application needed to define bunch sequences to be tested. Ideally identify a person in OP to take charge and follow up all LLRF-related work in view of developing the final “Linac4 Super-application”(?). 26/05/2011

G Bellodi - L4BCC - meeting OASIS: initially not foreseen, request has since been approved for a package to have availability of signals from transformers, pick-ups and power supplies  Ioan’s talk 26/05/2011

G Bellodi - L4BCC - meeting

26/05/2011 G Bellodi - L4BCC - meeting Component, measurement systemparametersunits Power suppliesU(t), I(t), U eff, I eff V, kV, A, mA Sparks counterI>I peak min -1 H 2 injection and Pumping systems (extraction, Einzel lens, LEBT) P(t), P max, P eff mbar H 2 density regulation (density, thickness)  (t),  eff, X eff At/cm 2 Residual gas mass analysis spectrum and follow up of H, H 2, N, N 2, O, O 2, OH, H 2 O, CO 2, CO, Ar Mass spectrum, I(M,t) At/s Optical emission spectroscopy: spectrum and H , H , H  relevant impurities I( nm) Hi(t), Hi eff Photon/s Timing and delaysto i, dt i ms,  s TemperaturesTiTi °C°C RFf, U F (t), U R (t) Vacuum gauges, valves Interlocks & safety systems Time dependent values will be acquired via oscilloscopes: 2 OASIS systems x 16channels (8x10MHz bandwidth, 8x100MHz bandwidth ) J Lettry Ex. date=03/2013 at the latest

26/05/2011 G Bellodi - L4BCC - meeting -control/status for H- foil exchanger - viewing SW and control for foil camera (could be like BTV application). -dedicated BLMs synoptic -data logging - what, with what frequency, what filtering etc. -dump current monitoring (normalisation to the injected beam intensity to judge if the foil is degrading). -display of beam intensity in the line, intensity circulating, transmission/injection efficiency values Ex. date=2014

26/05/2011 G Bellodi - L4BCC - meeting High level applications to control chopper/pre-chopper sequences and synchronisation timings in PPM mode according to super-cycle specifications Setting up of users in the super-cycle : intensity per beam, number of PSB rings for injection, number of turns per ring. From these settings the correct chopper and pre-chopper sequences are selected. Synchronization of the beam delivered by Linac4 with the PSB RF system LLRF system compensation of beam loading transients by feed-forward Energy modulation for longitudinal painting if needed External conditions (suppressing injection into one or more rings) and interlocks internally accounted for. Complex tool but to be kept of as simple use as possible Ex. date=2014

26/05/2011 G Bellodi - L4BCC - meeting

26/05/2011 G Bellodi - L4BCC - meeting

 3 MeV test stand : o Progress is ongoing and details/requests are being defined for software and hardware needs. o Coordination meetings are held ~every couple of weeks, with more specific meetings in between.  Present status, progress tracking, deliverables  ) Linac4 Longer term planning (considering both development and maintenance needs): -availability of resources - impact from LS1 activities - expected showstoppers? 26/05/2011