Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE.

Slides:



Advertisements
Similar presentations
Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
Advertisements

SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
SCARIe FABRIC A pilot study of distributed correlation Huib Jan van Langevelde Ruud Oerlemans Nico Kruithof Sergei Pogrebenko and many others…
Dominik Stokłosa Pozna ń Supercomputing and Networking Center, Supercomputing Department INGRID 2008 Lacco Ameno, Island of Ischia, ITALY, April 9-11 Workflow.
Progress With iBOBs at Jodrell Bits & Bytes Meeting, JBO, th Dec 2007 Jonathan Hargreaves Electronic Engineer, Jodrell Bank Observatory.
Digital FX Correlator Nimish Sane Center for Solar-Terrestrial Research New Jersey Institute of Technology, Newark, NJ EOVSA Technical Design Meeting.
StreamBlade SOE TM Initial StreamBlade TM Stream Offload Engine (SOE) Single Board Computer SOE-4-PCI Rev 1.2.
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
DBBC3 Development - Digital Base-Band Converter 3
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
The 6713 DSP Starter Kit (DSK) is a low-cost platform which lets customers evaluate and develop applications for the Texas Instruments C67X DSP family.
Translate the following message:
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
High Bandwidth Data Acquisition and Network Streaming in VLBI Jan Wagner, Guifré Molera et al. TKK / Metsähovi Radio Observatory.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
VLBI Storage Manager (VSM) Matteo Stagni – Mauro Nanni 0.
The Guts. CPU CPU Socket The CPU is generally a 2 inch ceramic square with a silicon chip located inside. The chip usually about the size of a thumbnail.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
GPU DAS CSIRO ASTRONOMY AND SPACE SCIENCE Chris Phillips 23 th October 2012.
DiFX Performance Testing Chris Phillips eVLBI Project Scientist 25 June 2009.
Update on the Software Correlator Nico Kruithof, Huseyin Özdemir, Yurii Pydoprihora, Ruud Oerlemans, Mark Kettenis, JIVE.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Demonstration of 16Gbps/station broadband-RF VLBI system Alan Whitney for the VLBI2010 development team MIT Haystack Observatory 22 October st Intl.
Demonstrations of RDBE-PFB Data Flow. Review the original PFB Data Flow.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
NEXPReS Period 3 Overview WP 6: High Bandwidth on Demand Paul Boven, JIVE.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
WP8: FlexBuff Ari Mujunen, Tomi Salminen Aalto University Metsähovi Radio Observatory NEXPReS 2nd Board Meeting – 2012 June 20 – NORDUnet, Copenhagen Denmark.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Introduction to Fabric Kiwi Team PSNC. E-VLBI system – general idea.
EXPReS FABRIC meeting at Poznan, Poland1 EXPReS FABRIC WP 2.2 Correlator Engine Meeting Poznan Poland JIVE, Ruud Oerlemans.
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
WfMS and external systems Katarzyna Bylec PSNC. Agenda Introduction Pre-corelation ▫ North Star ▫ NRAO SCHED ▫ Vlbeer FTP ▫ Log2vex ▫ drudg Correlation.
SUCCS Software for Uniboard / Correlator Control System.
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
Presentation Title Presentation subtitle Your name Your title, organisation.
UniBoard review September 2014
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
Distributed Correlation in Fabric Kiwi Team PSNC.
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
SA1: technical progress
JIVE UniBoard Correlator External Review
SA1: overview, first results
Overview of 4Gbps connectivity for Nordic-MERLIN fringe tests
Nat 4/5 Computing Science Interfaces
Overview of the Belle II computing
Mark 5 / VLBA Correlator Topics
JIVE UniBoard Correlator (JUC) Firmware
EXPReS Annual Review April 17
e-EVN: practical considerations
SA1: third year overview
Progress on EXPreS at JBO Ralph Spencer
The e-EVN Arpad Szomoru, JIVE.
Correlator Growth Path
User interaction and workflow management in Grid enabled e-VLBI experiments Dominik Stokłosa Poznań Supercomputing and Networking Center, Supercomputing.
EXPReS Annual Review April 17
Presentation transcript:

Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 2 Overview and updates Slides from: JIVE PSNC Metsähovi JBO see JBO report Questions to the ones that know the answers please!

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 3 JIVE: Personnel Changes Huseyin Ö zdemir, left on March 31st. Nico Kruithof (SCARIe) left on June 30th. Des Small took over some of Huseyin's work. Michael Sipior started working on prting SFXC to GPUs Aard Keimpema took over from Nico on September 1st (SCARIe) Unfortunately this means more delays.

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 4 Progress on Software correlator: Conversion to MeasurementSet implemented Conversion to FITS possible Data can be loaded into AIPS Digital sampler correction (Van Vleck) implemented Mark5B and VLBA data formats implemented Optimizations: Optional reverse order of fractional bit shift and fringe rotation: 25% faster Different FFT implementations: somewhat faster for high spectral resolution JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 5 Validation Comparison with Mark4 correlator: Phases match within 1 degree Amplitudes are 15% lower JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 6 First Images 4C J JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 7 Webservices Integration with “the Grid” through webservices: vex2ccf finished, tested with workflow manager translation node (to distribute data on the Grid) finished; awaiting further tests Currently development is on halt; needs VLBI grid broker JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 8 FTP Fringe Tests Fully operational now Produced first Yebes fringes! JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 9 Post Processing JIVE uses j2ms2 to convert hardware correlator output into MeasurementSet. j2ms2 has been adapted to accept the SFXC output format. Benefits: Standard analysis tools can be used. Translation into FITS through standard pipeline (skipping some steps). Result: Data can now be read into AIPS and matches data produced by hardware correlator. JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 10 Remaining Work Further optimization of correlator core Test integration with Grid broker Implement & test real-time correlation JIVE

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 11 PNSC: Recent Activities (1 of 2) VLBI Broker Implementation the VLBI Broker (first version) Communication with Workflow Management Module Communication with Translation Nodes Design of a distributed version of the VLBI Broker Design and implementation of a communication interface with Network Module Correlator Job Submission Module Design and implementation of a communication interface with VLBI Broker Design of a module core Network module Design of a module core Design and implementation of a communication interface with VLBI Broker PSNC

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 12 Recent Activities (2 of 2) Workflow management Implementation of a Workflow Management Module with the following functionality: Possibility to load a vex file Possibility to convert a vex file to CCF file CCF editor Possibility to create an observation workflow Possibility to submit a workflow for execution Personnel changes have also caused minor changes to schedule, but with the planned extension, but should be managable with the extension period PSNC

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 13 METSAHOVI: Recent Developments Development of 4G-EXPReS Data Acquisition System Targeted for new dBBC or DBE2 use with 10GE 10 Gbps Ethernet tests Disk controller and SATA port multiplier tests High speed streaming with Tsunami protocol Design of a new-style disk pack and tray Result: 4 Gbps speed, 60 TB capacity Hardware Based UDP/IP (Tsunami, VDIF) Streaming Together with Jodrell Bank and Onsala Targeted for Onsala -- JB eMerlin link Successful 8 Gbps demonstration from Metsähovi to Onsala in June 2008 Also suitable for dBBC or DBE2 Metsähovi

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 14 4G-EXPReS disk recorder Targeted to record from upcoming 10 Gbps Ethernet digital backend output such as the dBBC, DBE2 and others. 4 Gbps, 1.5 TB disks, 17 hours 4 Gbps, 2.0 TB disks, 20 hours Hardware: The Serial ATA port multiplier Based on SATA port multiplier (PM) technology, part of the Serial ATA standard (used in place of SAS) Commercially available, low cost and supported by many modern SATA controllers. Hosted on a high-end, gaming computer Metsähovi

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 15 Diskpack details Diskpacks developed external, low-cost diskpack variants carry 20 or 10 SATA disks Connected to mainboard via single InfiniBand/miniSAS multilane cable 12 Gbit/s max throughput The recording system can emulate Mark5C commands and can store network data in Mark5C, VDIF and other formats. Performance Over 24 hour recordings are possible with two diskpacks Current write rates are in excess of 4 Gbps, reaching 6 Gbps. Expecting 8 Gbit/s with newer motherboards. The diskpack is easy to carry and easy to ship It presents a portable, shippable solution for high-speed recording and storage for those who do not desire to set up a traditional distributed network file system. Metsähovi

JBO Progress See update report Summary –Protocols final report in revision stage (later than we said) –4.1 Gbps Onsala-Jodrell Link now working! –E-MERLIN Correlator racks powered up –Station board being tested locally –Coding. implemention and testing for iBOB almost complete –Good progress on ‘VSI Chip’ coding on Station board –Waiting for 1 st baseline board and a further station board real soon now!

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 17 Questions/Answers Contact information T. Charles Yun Project Manager EXPReS (JIVE) tcyun \at\ jive dot nl Additional Information only one “s”] EXPReS is made possible through the support of the European Commission (DG-INFSO), Sixth Framework Programme, Contract #026642

2009 Jan 28EXPReS Board Meeting, Madrid, Spainslide: 18