PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
PACS IIDR 01/02 Mar 2001 Baffle and Straylight1 D. Kampf KAYSER-THREDE.
TELESCOPE ANALOG CONTROL Martin Frericks, Frans Zwart.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Instrumentation: ground and noise Temperature Measurement.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
Cryogenics for B-Pol S. Masi, reporting from F.X. Desert L. Piccirillo …. Use SAMPAN as a baseline, and look for improvements/variations.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
XEUS Technology Milli-Kelvin Refrigerator for the XEUS Cryogenic Detectors Adiabatic Demagnetisation Refrigerator I Hepburn Mullard Space Science Laboratory.
Close Cycle Dilution for Space Ph. Camus, G. Vermeulen, G. Chaudhry, A. Benoit, F. Martin B-POL Workshop, IAP Paris, 29th July 2010.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Cryogenics for FPP S. Masi Two inter-related issues: –Cryogenic chain for the focal plane (final temperature 0.1K) –Thermal system to radiatively cool.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
The Coudé Lab Environment Boulder 18 March The Coudé Lab.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Midea Water Dispenser. Water Dispenser 1 FEATURES TYPE Table Top Style COMPRESSOR BRAND DANFU POWER SUPPLY 230V+-10%,50HZ NUMBER OF FAUCETS 2 COOLING.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
Defining the volumes and functions of the cryogenic suspension Discussion guidance Kashiwa October JGW-G
1 Airborne Science Program EMASHSI Kick Off Meeting Interfaces NASA Ames Research Center University of California Santa Cruz Airborne Science & Technology.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
Report on Payload and Calibration splinter meeting B. Maffei M. Bersanelli 1CERN May 2016.
Date of download: 6/6/2016 Copyright © ASME. All rights reserved. From: Three-Dimensional Integrated Circuit With Embedded Microfluidic Cooling: Technology,
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
PACS IBDR 27/28 Feb 2002 PACS Thermal Analysis1 Dr. L. Morgenroth CASE GmbH.
Teleconf ACS – FREIA 28th March 2017
TEMPERATURE SENSOR LOCATIONS
System Considerations for Submillimeter Receiver
Cryostat 5 K Thermal Shield -- Conclusions (Proposed)
GLAST Large Area Telescope:
Another Modular Focal Plane: Part 2 – FP assembly
SPICA / FPI Mechanical /Optical Issues
Presentation transcript:

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 2 Scheme of FPU and I/F

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 3 Instrument Interfaces to S/C Mechanical interface to OB (FPU) ! Mechanical interface to SVM (WE) Mechanical interface to CVV (BOLA) Thermal interface to S/C cooling system ! (FPU to temperature level 0 and 1 only) Electrical interface to S/C (data, power, sync) Electrical interface (FPU to WE) Optical interface (FPU to telescope focus) ! ! means: AI pending

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 4 Pending AIs on Interfaces PACS/HIFI/SPIRE accomodation on OB: identify solution (clearance) using the detailed technical drawings of instruments Number of cooling straps: PACS to put the requirements (4+1) into IID-B Telescope – PACS: PACS provided report on used telescope design for the optical model ESA to provide a telescope model (optical prescription, temperature, emissivity, stray light)

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 5 Mechan. Budget and I/F: Size+Mass of Units Project codeInstrument unitDimensions (mm)Mass (kg) FPFPUCold Focal Plane Unitenvelope max. 920 x TBC FPDEC1Detector Control 1tbd x 240 x FPDEC2Detector Control 2tbd x 240 x FPMEC1Mechanism Control 1tbd x 240 x FPMEC2Mechanism Control 2tbd x 240 x FPBOLCBolometer and Cooler Control248 x 279 x FPBOLABolometer Buffer Amplifier180 x 230 x FPDPUDPU240 x 258 x FPSPU nomSPU nominal240 x 218 x FPSPU redSPU redundant240 x 218 x FPWIH“Warm” Interconnecting Harness length  1000 (each part) 1.5 TOTAL Dimensions are given as Length x Width x Height. Length and width define the fixation baseplate.

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 6 FPU Envelope

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 7 FPU Side View (Entrance Focus)

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 8 Suspension Location on OB

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 9 Thermal Budget and I/F: FPU- S/C cryostat FPU requires two temperature levels - level 0 at 1.7K (max. 1.75K accepted) - level 1 around 4K (max. 5.0K accepted) Other temperatures inside the FPU are produced autonomously (2.2K / 0.3K) Thermal coupling to level0 via 4 heat straps Thermal coupling to level1 via 1 (tbc) heat strap FPU is thermally decoupled from OB Thermal loads are given in the following table

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 10 Temperatures and Heat Loads (TMM)

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 11 Electrical Budget and I/F: FPU– WE– S/C Harness - cryogenic part (1100 wires+199 shields tbc) - interconnecting WE part - S/C supply part - S/C data part Power consumption of WE see following table Telemetry budget will be detailed under Agenda point PACS Data Flow

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 12 Harness Schematic

PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 13 WE Power Consumption in Primary Mode Project codeInstrument UnitPower Dissipation (W) FPDEC1Detector Control 112 FPDEC2Detector Control 212 FPMEC1Mechanism Control 118 FPMEC2Mechanism Control 218 FPBOLCBolometer/Cooler Contr22.5 FPDPUDPU15 FPSPUSPU20 TOTAL on SVM117.5 on CVV outside2.5