N.E.C. Installation Techniques and Common Violations

Slides:



Advertisements
Similar presentations
UNIT 31 HOME ELECTRICAL SYSTEM
Advertisements

Basic Electricity.
28 Residential Electrical Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the characteristics.
4/30/2015 AFCI 9/01/07 Rev 5 1 Arc Fault Circuit Interrupters For NEMA Field Reps.
2014 NEC Code Changes Ted “Smitty” Smith E Light Electric.
Master Examination Practice Drill # O 1. Given: Two (2) rigid metal conduits (RMC) are to support a weatherproof 18 cu. In. device box, with threaded.
Master Examination Practice Drill # Ted “Smitty” Smith.
DAY 4 CHAPTER 3 CONDUCTOR SIZES,TYPES, ETC.. Continuous Load. A load where the maximum current is expected to continue for 3 hours or more. Continuous.
EET Survey of Electronics
PRESENTED BY THE ELECTRICAL
Electrical Power Systems
Master Examination Practice Drill # (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.
2014 CHANGES TWO MINUTE DRILL COPYRIGHT TED “SMITTY” SMITH ©2014.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
 E4 Electrical Installation #2 Wire Sizing and Materials.
Two Minute Drill Number 32- Journeyman Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 25- Residential Improving your skill in code Look Up Increasing Speed Drill.
2005 NEC ® Code Changes Presenter Mark Nowak North East Specification and Project Manager.
Two Minute Drill Number 26- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Principles of Electricity Ampere The rate of flow of electricity.
Calculation Speed Drill # NEC
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
1 Air Conditioning Breaker Panels and Disconnects.
Two Minute Drill Number 23- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Electricity By: Mr. Brock. Electrical Safety 1) Always disconnect the circuit to be worked on before anything else and lock the cover to the SEP when.
Two Minute Drill Number 31- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill Number 22- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Objective Describe materials used in electric wiring.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
Electrical Plans.
Electrical Safety Craig Shurson CSP, ARM Regional Loss Control Coordinator Hortica - The Florists Mutual Company.
Ag. Mechanics for Beginning Teachers
Electrical Materials.
Electrical Installation AMI- 17.0
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
By: Mr. Brock.  Electricity- Source of energy that can be easily converted into light, heat or power  Ampere (Amp)- Unit of measure of the rate of flow.
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Electric Wiring Conductor A material that allows electricity to move readily and offers low resistance Example: copper, aluminum and water.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
Joel Moody, MD, PhD, MPH Director of Safety, Risk, Policy and Innovation Why did the requirements for Arc Fault Circuit Interrupters in Dwellings Change?
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Planning The Electrical System
Grounding the Electrical System
License Examination Practice Drill
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
2011 Changes Two Minute Drill
Smitty’s Two Minute Drills
Planning The Electrical System
Grounding the Electrical System
Smitty’s Two Minute Drill Mixed Content -05
2014 NEC – Code Changes Pertaining to Wiring Devices
AFCI Protection: AFCI Receptacles and the NEC
Conductors and Cables 2017 NEC
Chapter Six Ground-Fault Circuit Interrupters, Arc-Fault Circuit Interrupters, Surge Protective Devices, Immersion Detection Circuit Interrupters, and.
Your Inspection Business Name Goes Here.
Outlet Branch Circuit Arc Fault Circuit Interrupter (OBC AFCI)
2014 Changes Two Minute Drill
EET 323 – Electrical System Design Lecture 9: Grounding
Smitty’s Two Minute Drill Grounding and Bonding
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Two Minute Drill – Residential 3
Smitty’s Two Minute Drill Varied Number 7
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

N.E.C. Installation Techniques and Common Violations The following information is based on the 2014 National Electrical Code Presented by: Edward D. Mathieu State Electrical Inspector

Ground-Fault Circuit Interrupter Protection NEC 210.8(A)(1) through (10) Dwelling Units Bathrooms Garages Outdoors Crawl spaces Unfinished basements Kitchens (countertop surfaces) Sinks (within 6 feet) Boathouses

New GFCI Requirements for Bathtubs or Shower Stalls

New GFCI requirements for Laundry Areas

New GFCI Requirements for Dishwashers

GFCI Circuit Breaker This will protect all outlets supplied by the branch circuit.

GFCI Receptacle A duplex receptacle with integral GFCI that also protects downstream loads.

Arc-Fault Circuit-Interrupter Protection NEC 210.12(A) Dwelling Units Kitchens (2014) Family rooms Dining rooms Living rooms Parlors Libraries Dens Bedrooms Closets Hallways Laundry rooms (2014)

Common Approved Arc-Fault Installations NEC 210.12(A)(1) A listed combination-type circuit breaker installed at the panel to protect entire circuit.

Arc-Fault Branch and Feeder Circuit Breaker NEC 210.12(A)(2) Requires AFCI circuit breaker and AFCI device NEC 210.12(A)(2)

Common Approved Arc-Fault Installation Technique NEC 210.12(A)(4) Listed circuit breaker with AFCI device installed at first outlet. Cable from panel to first outlet (home run) is restricted to 50 Ft. for #14 and 70 Ft. for #12

Summary of Arc-Fault Requirements The following rooms/areas do not require AFCI protection. Basement (unless used as a space requiring AFCI) Outdoor Bathrooms In each room listed as requiring arc-fault all devices must be protected.

Readily Accessible NEC 100 Accessible, Readily Capable of being reached for operation, renewal, or inspection without requiring those to whom ready access is requisite to actions such as to use tools, to climb over or remove obstacles, or to resort to portable ladders, and so forth.

Branch Circuits Requiring GFCI and AFCI Protection. Install combination type AFCI in panel and GFCI as first device in circuit. Install circuit breaker listed as dual purpose. Install device listed as dual purpose.

AFCI and GFCI Circuit Breaker and Device

Exception to AFCI Requirement NEC 210.12(B) exception AFCI protection is not required where an extension to an Existing circuit is less than 6 Ft. and does not include any additional outlets or devices. Service entrance upgrades often utilize this exception.

Receptacles NEC 406.12(A) Dwelling Units All non-locking 125 volt,15 and 20 amp receptacles shall be listed tamper-resistant receptacles. All areas as specified in 210.52.

Outdoor Receptacles Wet locations NEC 210.8(A)(3) All 15 and 20 ampere, 125 volt require GFCI protection. NEC 406.9(B)(1) All 15 and 20 ampere,125 and 250 volt non- locking receptacles shall be listed as weather resistant.

Outdoor Receptacles NEC 406.9(B)(1) All 15 and 20 ampere receptacles will have an outlet cover listed as “extra duty”

The Grounding Electrode System NEC 250.50 All of the following grounding electrodes that are present at a building must be bonded together to form the grounding electrode system. Metal underground water Pipe. Metal frame of building or structure Concrete encased electrode Ground Ring Rod and Pipe electrodes Plate electrodes Other local metal underground systems Other listed electrodes

Concrete-Encased Electrode Sometimes referred to as the Ufer ground. Named after its inventor Herbert G. Ufer Added to the NEC in 1968 Required in the NEC in 1978

Components that Qualify as a Concrete Encased Electrode 20 Ft. of rebar not less than ½ inch, one continuous length or multiple pieces tied together with tie wire or other effective means. A minimum of 20 Ft. of bare copper conductor no smaller than # 4. Both methods require a # 4 copper conductor from the concrete encased electrode to the main disconnecting means.

Approved Methods to Connect Concrete-Encased Electrode

Listed for Concrete/Rebar and Direct Burial

Supporting of Non-Metallic Sheathed Cable (Romex) NEC 334.30 Within 12 inches of every outlet box, junction box, cabinet or fitting support must be provided. Type NM cable must be supported every 4.5 feet on a long run. NEC 314.17(C) exception Single gang plastic boxes must be supported within 8 inches of the box.

Non-metallic Sheathed Cable installed Through Bored Holes NEC 300.4(A) Type NM cable must maintain 1-1/4 inches from the nearest edge of the wood framing member. If 1-1/4 inches cannot be maintained a steel plate at least 1/16 of an inch thick will be installed to cover the area.

Nail Plates

NM Cable Supported on 2x4

Cable Stackers

Nonmetallic-Sheathed Cable Passing Through Holes in Wood Framing NEC 334.80 Ampacity of type NM cable is determined by 310.15 Where more than two cables are installed in drilled holes that are sealed with insulation, caulk or foam ampacity adjustments from Table 310.15(B)(3)(a) apply.

Nonmetallic-Sheathed Cable Installed in Contact with Thermal Insulation NEC 334.80 Ampacity of type NM cable is determined by 310.15 Where more than two cables are installed in thermal insulation without maintaining spacing ampacity adjustment from Table 310.15(B)(3)(a) apply.

Nonmetallic-Sheathed Cable Bundled NEC 334.80 Type NM cable is subject to the ampacity adjustments of Table 310.15(B)(3)(a).

Heat Pumps

Basic Heat Pump Installation All installers need to have a EPA license Can be installed by Electricians, Master and journeyman oil technicians. (Residential) A disconnect is required at each outdoor unit. A service receptacle is required within 25 feet of the outdoor unit.(exception for one and two family dwellings) The wiring between the outside unit and inside unit needs to be UF Cable, Liqua-tite, or PVC Jacketed MC Cable. Using Type TC-ER or CL-3R cable is a code violation.