Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE Kurt W. Fisher Review Committee Chair Office of Science, U.S. Department of Energy 1 Closeout Report.
Advertisements

OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Closeout.
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE Kin Chao, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review Committee.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
OFFICE OF SCIENCE Review of Critical Decision 2 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
OFFICE OF SCIENCE Review Committee for the NuMi Off-Axis Neutrino Appearance (NO A) Experiment at the Fermi National Accelerator Laboratory August 9, 2011.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Office of Project Management Metrics Report Presentation
Princeton University Plasma Physics Laboratory EVMS Certification Review EVMS Implementation on NSTX-U Steve Langish October 4 - 6, 2011.
U.S. Department of Energy Project Management: Communicating Progress – Celebrating Success Paul Bosco, PE, PMP, CFM, LEED-AP Director, Office of Procurement.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 3 March 2011 Stellarator Program Update.
ANNUAL REPORT TO THE COLLEGE SENATE SUNY ONEONTA MAY 7, 2012 Strategic Planning Council.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
NCSX PROJECT OVERVIEW AND MANAGEMENT James L Anderson NCSX Project Manager August 15, 2007.
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Closeout.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 NSTX Upgrade Progress Report May 7 th, 2013 Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Steve Langish, Tom Egebo, Mike Williams and the NSTXU.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
Closeout Report on the Review Committee (CD-1) for the Long Baseline Neutrino Experiment (LBNE) Project at Fermi National Accelerator Laboratory October.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Anthony Indelicato DOE-Princeton Site Office October 2013 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
Where Module 04 : Knowing Where the Project Is 1.
Project Overview Ron Strykowsky Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 December 11-12th, 2012 NSTX-U.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
Office of Baseline Change Proposal (BCP) Approval or Brief Presented by: Draft version Jun 16, 2015.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
SmartMeterTM Steering Committee Update – November 2012
Principal Investigator ESTCP Selection Meeting
Conventional Facilities
Principal Investigator ESTCP Selection Meeting
Globus-M2 will be constructed by the end of 2015
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX Upgrade Project U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office 1

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office Increase toroidal field: 0.5T > 1.0T Increase plasma current:1 MA > 2 MA Increase pulse length:1.0 s > 5 sIncrease NB heating: 5-7MW > 10-14MW New Center Stack Inner TF bundle, TF joint, OH & inner PF coils Upgraded TF coil support structure Existing outer TF coils w/ reinstated water cooling Exst’g outer PF coils – 6 total New PF coil support structure Reinforce umbrella structure Also…modify coil power system, protection system & ancillary support systems What’s the proposed workscope? 2

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office Add 2 nd Beamline Decon, recondition and install Install 3 HVEs Relocate from TC basement New NB port New NB armor Modify Vacuum Vessel New Vacuum Pump Duct (below) Also…modify existing power system and ancillary support systems Workscope… continued 3

TPC=$94.3M Contingency: $11.3M (or 30% of ‘to go’) Today CD-0 CD-1 CD-2 CD-3 CD-4 Feb 09 Sep 15 Dec 11 Dec 10 Apr 10 FY09FY10FY11FY12FY13FY14FY15 $5.2$9.0$9.9$20.5$22.8$23.7$3.2 stdadv CD-3 Overdrive Budget odometer U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office How’s spending? $38.9M to go EF 1/4 1/2 3/4 14 months of schedule contingency (or 52% of ‘to go’) 4 $44.1M spent

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office How’s the performance so far? SPI = 1.06 & CPI = % complete Contingency = 30% of ‘to go’ costs Budget at completion = $82.7 Estimate at completion = $83.9 Level 2 milestones:  Past = completed on or ahead of schedule  Ahead = early completion anticipated 5  All scope remains as planned.  TPC remains ‘on-target’.  CD-4 date remains ‘on-target’ with promise of early finish.  Concern: FY13+ Presidential Budget How’s the baseline?

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office Risks and Concerns NSTX-U future funding profile: FY 13 President’s budget provides reduced funding to PPPL...  Institutional impacts are high  NSTX-U would be adversely impacted : -Reduction in Lab-wide human resource support... Added risk. -Slow down of schedule (due to a constrained budget profile) will add cost. Actions:  PPPL continues to work closely with PSO and FES to understand impacts of the budget cuts.  The Project developed actionable plans based on differing funding scenarios to determine the impacts on the project.  Early delivery date of the project will be significantly reduced, but project can still meet CD-4 baseline date.  Worst case: If FY13 Budget comes in at President’s mark …AND… future year budgets remain at this reduced level for FY14, a re-baselining will be required for this project. 6

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office Thoughts  The Budget cycle is still unclear for FY13 and beyond.  Too early to react ( i.e., re-baseline ).. but precautionary institutional planning must be done.  The NSTX-U Project’s performance is still the #1 priority as stated by PPPL Directorship and agreed upon by FES.  The Project has built a nice buffer in schedule contingency to date... this will come in handy if budget is reduced.  Yes... there will be added cost risk to the project. 7

Construction Progress? U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office 8 Overall Progress is good... All construction efforts are well underway Vendor performance is good overall Critical Path... Remains through the construction of new Center Stack assembly Center Stack Fabrication facility is on line Entering the “riskiest” stage of construction: potting of quadrants & full center bundle, and OH coil winding Management... EVMS system in place and fully functioning (Annual Internal Surveillance complete) Construction proceeding well on the accelerated schedule. All previous Review Recommendations addressed. Project is getting the resources it needs.

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office Post CD-3 efforts are proceeding well…  Good performance to date.  Good communication between PPPL and Site Office.  Estimates are updated and remain well within plan.  Funding and human resources are in place.  Elements of DOE Order 413.3B are met. 9 Conclusion PSO, PPPL and FES must work together as the FY13 budget evolves and assess the impact to NSTX-U and PPPL.

Back-up Slides 10

U.S. DEPARTMENT OF ENERGY Office of Science Princeton Site Office Charge Questions 1.Construction Efforts: Are construction efforts being executed safely? Yes Does the project have adequate resources and the appropriate skills mix to execute the project per the plan? Yes 2.Baseline Cost and Schedule: Are the current project cost and schedule projections consistent with the approved baseline cost and schedule? Yes Is the contingency remaining adequate for the risks that remain? Yes 3.Management: Evaluate the management structure as to its adequacy to deliver the scope within budget and schedule. Are risks being actively managed? Yes 4.Response to Prior Reviews: Has the Integrated Project Team implemented all required actions in the Corrective Action Plan that was developed following the Project Status review from May 2012? Yes 11

12 PROJECT STATUS as of 10/30/12 Project TypeMIE CD-1Planned: Dec 09Actual: Apr 10 CD-2Planned: Dec 10Actual: Jan 11 CD-3Baseline: Jan 12Actual: Dec 11 CD-4Baseline: Sep 15Forecast: Aug 14 TPC Percent CompletePlanned: 44.4%Actual: 47% TPC Cost to Date$44.1M TPC Committed to Date$1.8M TPC$94.3M TEC$83.9M Contingency Cost (w/Mgmt Reserve)$11.3M29.4% to go Contingency Schedule on CD-414 months52% to go CPI Cumulative1.00 SPI Cumulative1.06