ALICE Upgrade Construction management system Adriana Telesca ALICE MFT Plenary meeting 9 July 2015.

Slides:



Advertisements
Similar presentations
WELCOME to an Introduction of the Monitoring the end-to-end Transport/Distribution Chain B2B Version V.
Advertisements

Employee Self-Service (ESS). Agenda Introduction 1 Terminology 2 Employee Self-Service Components 3 More Information 4 Questions & Answers 5.
-Reservation Monitor -Insurance Policy Monitor -Flight Monitor -Transport Monitor -Hotel Allotment Monitor -Flight Allotment Monitor -Flight/Hotel Optimization.
Reviewing Course Outlines for C-ID Designation
Program Management Portal: Overview for the Client
V2 1 E1 – Indirect Purchases Session 2 (V4) HAREFIELD.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
A viable Solution to track and report Supplier Performance for Visual Enterprise: Manufacturing and Quality Copyright © 2007 – 2013 VisualHelp.net. All.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
The University Library. slide1 Alma: a driver for organisational change Alison Little – Alma Project Manager Lynn Sykes – Head of Customer Services The.
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
The System Development Life Cycle
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
The Budget Template is a CSTA product in partnership with Organisports.
Spreadsheets in Finance and Forecasting Project Session 3b(ii) Data Flow Diagrams.
MFT Progress Report Ginés Martínez García for the MFT project ALICE mini-week, Sep 1 st -5 th 2014.
Introduction to SAP R/3.
CEO Juice Process for Sales Orders: Paperwork to Delivery Equipment Sales Order Process.
Software Testing Test Design and Implementation. Agenda Test Design Test Implementation Test Design Sources Automated Testing 2.
Release & Deployment ITIL Version 3
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
VHC SP Application - Overview VHC Service Provider Application Training WELCOME.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Photo taken at Sra Patum Palace SUT is a full member of ALICE On 13 December 2012, there was a signing ceremony Memorandum of Understanding between SUT.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Matthias Mekschrat h_DA WS 2011Logistical applications and optimizationsSlide 1 Logistical applications and optimizations.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Project Life Cycle.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Oracle Services Procurement
By Team Awesome. Team work was a valuable skill during this task. Making sure all team members contributed was important. As a team we needed to make.
An additional module for Baan Mail-Merge, which enables you to electronically sign your printed purchase orders and automatically , Fax, Print and.
Shaping the Future: A Vision for Learning Disability Nursing United Kingdom Learning Disability Consultant Nurse Network.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Project Progress Tracking Advantages –Automatic request for reporting. –Uniform Reports available in a central location. –Management at all levels can.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.
Sap PS online training in usa,uk,australia,india Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
SCC P2P – Collaboration Made Easy Contract Management training
Merseyside County Scouts
Project Management (PS)
Mechanics: (Tim).
Mini-drawers, FE-ASIC , Integrator
Module 1 Assemble the WSP team
Introduction to project accounting
Overview of the FEPAC Accreditation Process
Performance Management Training: Year-End Review
Terry Cotter LO/IF Group Leader
SCC Supplier Performance Management (SPM) Training
Software Development Process
Status of CO2 Cooling tests at CERN for Pixel phase 1
How Students Log In and Start a Test
Reviewing Course Outlines for C-ID Designation
ASPEC April 2016 Incidents 0 incidents, 0 near misses
Presentation transcript:

ALICE Upgrade Construction management system Adriana Telesca ALICE MFT Plenary meeting 9 July 2015

ALICE Upgrade Construction management system Need for an application to manage the workflow of the detector construction. Specifications have been defined by taking the ALICE ITS Upgrade as example but keeping them general enough to apply to the other ALICE Upgrade projects. 6 modules by project: 1.Resource management: project members, expertise, work percentage, institutes, etc. 2.Project definition and planning: tasks and milestones. 3.Construction workflow: components (types and parent-child relationship) and activities. 4.Suppliers. 5.Finances: contributions, invoices, orders. 6.Reporting. 2ALICE | MFT Plenary | 9 July 2015

ALICE Upgrade Construction management system Price enquiry launched at the beginning of Contract with KYBERNETIKA (Košice, Slovakia) for the development of the ALICE Upgrade Construction management system. The preliminary documentation is in preparation and will be distributed at the next weeks. The first prototype should be ready by the end of July After delivery of the first prototype, a demonstration session will be organised (confirmation will be sent). The final version of the application will be ready in October 2015 and training sessions will follow. 3ALICE | MFT Plenary | 9 July 2015

ALICE Upgrade Construction management system Resource management module Members details such as: -Personal information (first name, last name, , telephone number) -Affiliation are taken by ALICE GLANCE. The project leaders will add the members and institutes of their projects and define the availability of the person in term of %FTE. They will also define the members’ qualifications in order to allocate resources. PLs will be able to define management functions and associate them to the members of their projects. 4ALICE | MFT Plenary | 9 July 2015

5

6

7

ALICE Upgrade Construction management system Construction workflow Designed to monitor the production of items or individual components and their quality. Every item will belong to a specific type. The list of all possible types of monitored items and components will be defined in the system. Examples of component types are: Pixel Chip, Flexible Printed Circuit, Test Board, Inner Barrel Stave, Outer Layer Stave and other types of components needed for the project realization. An activity type defines input components (if any), raw material (if any) and output components (if any) of that activity. 8ALICE | MFT Plenary | 9 July 2015

ALICE Upgrade Construction management system Construction workflow A component is a physical item with a unique identifier (component ID). Conversely, raw material is used for physical items that do not have a unique identifier. Component types might be related via a parent–child relationship. A parent-child relationship between two components is used to define either that a component (child) originates from another component, or that a component (child) is part of a more complex composite component (parent). For example, the component CMOS Wafer undergoes an activity, thinning and dicing, which will cut the CMOS wafer into a number of samples of a new component type named pixel chip. 9ALICE | MFT Plenary | 9 July 2015

10

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

Example of structure of a component type ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE Upgrade Construction management system Project definition and planning The project schedule is made of milestones and tasks. Tasks and milestones belong to work packages. PLs will define the manpower and qualification needed for each task. PLs will associate people to tasks and define the allocated time. At any time, PLs will be able to verify the status of the tasks. PLs will be able to create/modify the Project Plan. The system will generate automatic messages ( ) if: A due Milestone was not checked by the Task Leader. A Milestone was checked by the Task Leader but not achieved. A Task has insufficient manpower. 18ALICE | MFT Plenary | 9 July 2015

19

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE | MFT Plenary | 9 July

ALICE Upgrade Construction management system Suppliers, finance and reporting Suppliers are inserted in the system and associated to components. The finance module will contain information about institutes contributions. The reporting module gives an overview of the project status. 24ALICE | MFT Plenary | 9 July 2015

25

ALICE Upgrade Construction management system Conclusions A new system for managing the ALICE upgrade projects is under development. The preliminary documentation will be distributed to PLs in the next weeks. A first prototype will be presented in a dedicated meeting. Feedback from PLs is expected. The application should be ready in October ALICE | MFT Plenary | 9 July