+ ALICE SPD COOLING CRITICAL ISSUES Rosario Turrisi.

Slides:



Advertisements
Similar presentations
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
Basic Refrigeration Cycle
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
+ FLOW RATE ISSUES IN THE ALICE SPD COOLING Rosario Turrisi A.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
CLAUDIO BORTOLIN SPD Cooling Status INFN – PD / CERN.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
COOLING BY EVAPORATION OF PERFLUOROCARBONS Why evaporate? 1. To enhance the heat transfer per unit area The heat transfer coefficient increases significantly.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
A two-stage system for the future cooling system.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
Air condition installation
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Stato del sistema di raffreddamento del rivelatore SPD di ALICE
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Filter drilling status
Ti/SS transitions A.Basti INFN-PISA*
Rosario Turrisi INFN Padova
Performance of a CO2 System with Four Parallel Pipes
ITS Cooling: Xmas Plan Claudio Bortolin.
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Ultra-light carbon fiber structures: evaporative tests
Pixel CO2 Cooling Status
Recirculating CO2 System
VELO Thermal Control System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Aachen Status Report: CO2 Cooling for the CMS Tracker
Università di Udine / INFN – PD / CERN
November technical stop activities:
Presentation transcript:

+ ALICE SPD COOLING CRITICAL ISSUES Rosario Turrisi

+ In this talk Detector’s side cooling system Performance history Remarkable events Flow vs. thermal contact Recent interventions Final consideration 2

+ Detector’s (in)side 1sector = 1 cooling line 1 cooling line feeds 6 staves input: collector box, 6 capillaries 550 mm × 0.5 mm i.d. output: collector box, 6 pipes ~10 cm long, 1.1 mm i.d. 2 bellows in a row, ¼” tube diameter, 6” and 12” length 3 bellows C side (liq) A side (gas)

+ Critical components - 1 Capillaries used to enter the coexistence phase CuNi, 550 mm long, 0.5 mm i.d. Cooling pipes where the heat transfer happens Phynox, 40 μ m wall round 3 mm pipes squeezed to 0.6 mm inner size Both sensitive to pollution! 4

+ D = 5.6 mm T = 11.8 mm X = 0.7 mm (~1 mm in the filtering area) S = 4 mm L = ~5000 mm T D X Filter Swagelok SS-4-VCR-2-60M Swagelok gland 6LV-4-VCR-3-6MTB7 Pipe: SS 316L 4-6 mm i-o diameter Swagelok 316 SS VCR Face Seal Fitting, 1/4 in. Female/Male Nut: SS-4-VCR-1 & SS-4-VCR-1 SEM picture of the filter S L 5 Critical components - 2 no access

6

+ 7

+ 8

+ The picture (as we know it) Some pollution went into the lines It had to go through oxysorb/hydrofilter of the plant (1 μ m filter was installed after 1 year run) and/or It had to go through the first 60 μ m inline filter and deposit (and partly go through) the second inline filter The second clogged filter cannot be replaced (have to disassembly the experiment) and causes: less flow pressure drop The liquid heats up to room temperature along the path to the detector (~40 meters) – this was not a problem, if alone The combination of the last two causes: less flow in the single line  worse performance in the sector bubbling before the capillaries  local and occasional loss of performance Most of the effects are reproduced at the test-bench At least one effect is difficult to reproduce and understand: post-stop/start flow reduction 9

+ Efficiency history 10 Long stop (you know why…) – minor rerouting of return pipes First switch on after installation: efficiency = 87% DSF status (tests pre-installation): efficiency = 100% Restart after long stop: efficiency = 71%

+ 11 Stable after interventions: efficiency = 83% Interventions in fall 2009 Last resume after tech stop: efficiency = 64% Efficiency history extrapolation from last year assumes constant trend

+ Critical issues – a list Pump breakdown pressure spikes – correlated? we know since 2008 why only one pump fails? working time? position? two-stages pumps? need for qualification other technologies? Missing protection against unwanted (and sudden) stops chilled water stop power failure/glitch mixed water stop Subcooling reliability in case of mixed water failure, access inside the magnet could be needed Leaks bad connections & safety valves Black holes where the pollution came from cause(s) of performance drop at (technical) stops 12

-11% of flow in 2 months To vacuum the bad loops before the restart can help to recover the flow From: C. Bortolin 1 st Cooling Workshop Jan From: C. Bortolin 1 st Cooling Workshop Jan

+ Situation after 2010 WS 1. Cleaning of 4 sectors’ lines (sector nrs. 3,5,6,7) counter-flow 1h flow w/nitrogen + 24h C 6 F 14 flow + nitrogen flow to remove liquid leftover Sector #BEFORENOW Notes: values ~2 have been tuned by hand, could be more clear improvement in sector 3, 4, 5 situation stable in # 6,7 line of sector #9 is behaving normally, issue of flow between PP4 and PP1 (as we know) SECTOR #3: ALL HS ON !!! (absolute première) 93 HS on, missing 2 from sector #9 (by-passed) By-passed by a dummy sector w/plastic pipes

+ Flow/power correlation Slowly decreasing trend of flow The flow doesn’t tell the whole story – stable # of modules must depend on local thermodynamical conditions (not monitored) The flow itself depends on something not understood start/stop’s result often in flow reduction as after last TS 15 total power total flow number of hs ready Aug 2010 Aug 2011 SectorFlow (g/s)Trend (g/s) Δ p PP4 (bara) Flow(g/s) Pliq 6.1 baraP liq. 6.5 bara Before TSAfter TS * TOT %-2.7% after 11/2011 TS

+ Thermal contact Could thermal contact be another issue? Performed with AOS thermal grease real K measured (slightly less than promised) mechanical stress tested Long term performance? Thermal/mechanical stress? It is a minor issue (by now): good sectors do not show a worse performance 16

+ Recent interventions Ultrasounds cleaning piezoceramics brought in front of the filters cycles of 2 h (alternate 2 h of mechanical bumping with stainless steel wire) two sectors treated no evidence of effect Regularly counterflow flushing last time: 4 days on same sector, gain ~10% of flow filters replacement SEM analysis on both faces of the filters show no pollution 17

+ Current performance Flow: 11.6 g/s (nominal: 18 g/s) Modules ‘’on’’: 75/120, i.e % (off not because of cooling: 3) Power consumption: 850 W (nominal: 1500 W) Inlet pressure: 6.3 bara (with a jump to 6.5) was ~4 in 2008, 4.5 end of 2009, 5.5 end of 2010… maximum we dare to go: 7 bara at the plant Sectors 7, 9 off – 6,5 in very bad shape 18

+ What’s next Get rid of those filters ‘’the hard way’’… laser drill Keep testing the strategy (‘’in case everything else fails’’…) on the test bench Thanks for the attention! 19 see Claudio’s talk see Andrea’s talk

+ Backups 20

21

+ (2) Target point The pipe is in yellow The access point (1) is ~4.5 m away from the target point (2). The pipe is not fixed but laying in the aluminium box (below the yellow pipe in the exploded view) The pipe will be filled with liquid (C 6 F 14 ) or flushed at low pressure (0.5 bar) with the same liquid (1) Access point Layout of the circuit 22

+ ‘Ice age’ test We installed an ‘intercooler’ on the freon line in PP4 (close to SPD) 8 m of plastic pipe in a bucket filled with ice (many thanks to CERN Restaurant #1!) freon reached ~8 °C in PP4 Test done on 2 sectors (#6 and #5) Observed: increase of flow in one case ( ∼ 50%) clear improvement of performance in both cases 6/7 half-staves recovered ! 23

+ Measurement of flow Very low flow rate in sectors 7 and 9; Reynold’s number vs. pressure

Pipes New routing (Symmetric inlet) View from A side (front) side ‘I’ side ‘O’ 5HX5HX 10 New pipes ~ 10 ˚C ~ 20 ˚C ~ 10 ˚C 5 pipes Flow ~ 16 g/s 25 5HX5HX

Size: 16x26 meters Weight: 10,000 tons SPD Cooling station ~ 50 m SPD ~ 8 m R i = 39.3mm R o = 73.6mm L = 282mm Silicon Pixel Detector SPD SIDE C SIDE A 26

+ SPD structure 27 SPD Sector Half-barrel Half-stave Ladder 5 sectors 12 half-staves 2 half-barrels 1 sensor 5 read-out chip 2 bump bonded ladders 1 MCM 1 multilayer bus Total:120 half-staves 1200 ASIC 1200 ASIC 9.83 × 10 6 channels 9.83 × 10 6 channels half-stave= basic working unit

+ Principle of operation Joule-Thomson cycle sudden expansion + evaporation at constant enthalpy Fluid C 4 F 10 : dielectric, chemically stable, non- toxic, convenient eos Nominal evaporation: 1.9 bar, 15°C PP=patch panels PP3: close to the detector, not (immediately) accessible, PP4: ~6 m upstream SPD 28 ~40m liquid pipes 6/4 mm ~35m gas pipes 12/10-10/8 mm heaters PP4 PP1PP3 p, T Filters (60μm) liquid pump capillaries condenser compressor cooling tube enthalpy pressure two ‘knobs’: liquid-side pressure flow gas-side pressure temperature

+ Test in the lab very stable against changes in parameters settings (1-2 sectors at a time) 100% efficiency tested one half barrel at a time full power to the detector (~150 W/sector) 29 For ~ 3 years the system has been tested in the DSF at CERN In the lab, filters where missing (60 μ m in line and the final 1 μ m filter on the plant)

+ Looking for the ‘’unsub’’ Pressure increase line by line Check if performance can be recovered by increasing the flow The flow is enhanced by the pressure increase Lines swapping Could be something related to the lines’ path/conditions Some dependence is found – replaced lines with symmetric and shorter path Lines insulation Heating up the fluid can cause early bubbling Impossible to insulate the lines – too much surface w.r.t. the volume SEM analysis of ‘first-stage’ filters Clogging material in the lines? Keystone test…see later ‘’Ice age’’ test Further subcooling to avoid early evaporation: 8 m of pipe in a bucket filled with ice (thanks Restaurant #1) in PP4 (~6 m before the detector) Two lines tested, flow increased, 6-7 hs/sector recovered, in one line +50% of flow 30

+ Pressure correlations Sector #0 (‘good’) Observed behaviors: 1.“Good” sectors have a higher pressure drop 2.“Bad” sectors are more “sensitive” to pressure changes … Observed behaviors: 1.“Good” sectors have a higher pressure drop 2.“Bad” sectors are more “sensitive” to pressure changes … bad guys Principle: look at the correlation (slope) between the pressure set at the plant and the pressure close to the detector Test done in 2009 Principle: look at the correlation (slope) between the pressure set at the plant and the pressure close to the detector Test done in 2009 PLANT SPD liquid gas PP 31

+ SEM analysis 32 Analysis of a filter taken from PP4, in place for 1 year approx. Results and conclusions: “In the used filters several exogenous fragments were located clogging the filter. There were several fragments containing different composition elements. In addition to elements from the Stainless steel, the following traces of elements were found: O, Al, K, C, Sn, Cu, P, Ca, Cu, Na, Cl and Zn.” Possible origin of the fragments: pumps (graphite) hydrofilter (aluminium oxide) weldings (TIG weldings remnants) NB lines: electrocleaned s.s. pipes (Sandvik), flushed after installation with liquid freon clean filter 20 μ m

+ ‘’Upgrades’’ 1.Installation of a 1 μ m at the plant (in 2008) 2.Installation of new liquid-side pipes dedicated path of new lines, more straight (less elbows), shorter inox SS316L, 6/4 o/i diameter (same as before) no insulation (useless) 3.Additional heat exchangers to cool the fluid close to the detector 10 HX’s (one per line), redundat exchange factor (more than 5 times) use leakless system with water cooled down at 7.5 °C 4.Flushing each line counter-flow wise drain particles clogging the filters outside the line redundant protection against overpressure: 2 safety valves (mechanical) + pressure switch (electronic) 2 filters, stainless steel, 1 μ m grid, on the “washing machine” 1 to 4 days washing cycle per each sector 33