KM2A MD prototypes xiao gang 2011.2.18. introduction simulation Prototypes conclusion.

Slides:



Advertisements
Similar presentations
Pertemuan ke-5. 1.A water tank is the shape of a rectangular prism having length 2m, breadth 75cm and height 500mm. Determine the capacity of the.
Advertisements

FLUKA radioprotection calculations Maria – Ana Popovici Politehnica University of Bucharest.
Project No Drip Prototype Presentation Jacqueline Greene Michele Dufalla Tania Chan April 5, 2007.
Robert Cooper L. Garrison, L. Rebenitsch, R. Tayloe, R. Thornton.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Volume of Triangular Prism. Volume of a Triangular Prism Length Volume of a prism = Area x length Area of triangle = ½ x base x height.
Prototype of the Daya Bay Neutrino Detector Wang Zhimin IHEP, Daya Bay.
LLNL A Sandia and Lawrence Livermore National Laboratories Joint Project Nathaniel Bowden Detection Systems and Analysis Sandia National Laboratories,
Working Concepts for a very near detector Preliminary discussions involving SNL/LLNL, ANL, Saclay and Brazil Goals –Work towards a compact detector design.
Liquid Xenon Gamma Screening Luiz de Viveiros Brown University.
Another Conceptional Design of Veto Daya Bay Phone Meeting Changgen Yang 2006/03/01.
MUON FLUX MEASUREMENTS AT THE LSC JRA1-N2 Meeting, Zaragoza, Nov 23 rd 2007 Héctor Gómez Maluenda, University of Zaragoza.
Polymer Laboratory Mrs. Brostrom Integrated Science.
CsI Photocathode Production and Testing
Alpha Prototype Presentation Nov 4, Today’s Presentation: System Schematic Review Materials Analysis Materials Processing Tube Fabrication Joints.
Abstract A time resolved radial profile neutron diagnostic is being designed for the National Spherical Torus Experiment (NSTX). The design goal is to.
ALCPG09 Albuquerque, The new geometry of the ILD muon system in MOKKA N. D’Ascenzo, V. Saveliev, Obninsk State University / DESY U. Schneekloth.
Simulation study of RENO-50 Jungsic Park Seoul National University RENO-50 International Workshop June 13-14, 2013 Hoam Faculty House, Korea.
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
Status of IceTop tank testing Tom Gaisser, Madison, Feb 20, 2003.
Spasimir Balev /CERN/ mrad 3 LKr simulation: – very slow, so only events with interesting topology are fully simulated: –  + with.
Structural option for the Jinping neutrino central detector Contributor : Yuanqing Wang, Zongyi Wang Speaker : Zongyi Wang Department of civil engineering,
R.Svoboda, U.C. Davis /LLNL This work was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore.
A detector design for the Daya Bay reactor neutrino experiment Yifang Wang Institute of High Energy Physics, Beijing Jan. 18, 2004.
Design and optimization of Electromagnetic particle Detectors (EDs) in LHAASO-KM2A Xiangdong Sheng, Jia Liu, Jing Zhao on behalf of the LHAASO collaboration.
Naming UsesProperties Structure Reactions.
Water Tank as the Outer Muon Veto Mingjun Chen
A General High Resolution Hadron Calorimeter using Scintillator Tiles Manuel I. Martin for NIU / NICADD Northern Illinois University Northern Illinois.
…………………………………………………………………………………………………………………………………… Lee Hun Joong Shin Kyoung Seung.
Lessons from Braidwood with Relevance to Daya Bay Jonathan Link Virginia Polytechnic Institute Workshop on Future PRC-U.S. Cooperation in High Energy Physics.
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Vyacheslav Klyukhin, SINP MSU Simulation of magnetic toroids for CMS forward muon detection April 22, 2013V. Klyukhin, General Muon mtg, CERN1.
Introduction bin/Dev_DocDB/DisplayMeeting?conferenceid=54http://juno.ihep.ac.cn/cgi- bin/Dev_DocDB/DisplayMeeting?conferenceid=54.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
Detecting Air Showers on the Ground
Performances of the KM2A prototype array J.Liu for the LHAASO Collaboration Institute of High Energy Physics, CAS 32nd International Cosmic Ray Conference,
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
Price List for Un-pressurized Sets Vacuum TubeTankLoading Quantity (sets)FOB Price US$ SizeQty(pcs)Capacity20 ’ GP40 ’ GP40 ’ HQ 58×1800m m L
CDMS II Shielding To Installation To Construction From Design.
Neutron Shield/Muon Veto (WBS 1.3) and Underground Installation Issues (WBS 1.6) May 11, 2009 Erik Ramberg.
Er. Hiralal Agrawal EXECUTIVE ENGINEER.. Apparatus:  Concrete cube moulds of 15 cm size in required numbers.  Standard tamping bar (steel) of 16mm diameter.
Positronium intensity measurement preparation SNU Bongho Kim.
CHANDLER Detector Neutronics Modeling Alireza Haghighat William Walters Nuclear Science and Engineering Lab (NSEL) Nuclear Engineering Program, Mechanical.
Jim Brennan for the WATCHMAN Collaboration Detector Engineering Design Simulation courtesy G. Jocher/J Learned, U Hawaii This work was performed under.
Perimeter, Area and Volume Presented by Bill Haining Functional Skills L1.
Plastic Woven Bag Manufacturers in Dubai
Scintillating Fiber BLM with PMTs
Xiong Zuo IHEP, CAS, for the LHAASO Collaboration
Area of a Triangle These two triangles are identical.
Fast neutron flux measurement in CJPL
IFR Status Summary W. Baldini on behalf of the IFR Group
SHiP straw tracker prototype tests
Institute of High Energy Physics, CAS
Simulation for DayaBay Detectors
Muon and Neutron detector of KIMS experiment
KM2A Electron Detector Optimization
1 3 2 Maths 3:Perimeter, Area and Volume By: Bill Haining.
CsI Compton Veto Detector for A low Mass WIMP Experiment
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
FBE05 – Mathematics and Statistics
ACD transparency - gaps between tiles - holes in tile to attach them
Detecting dark matter through line emission
Presented By J. Mills-Dadson
Xiong Zuo IHEP, CAS, for the LHAASO Collaboration
Design Requirements for Jinping Underground Neutrino Experiment
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Presentation transcript:

KM2A MD prototypes xiao gang

introduction simulation Prototypes conclusion

introduction 1209 MDs spacing 30m triangle layout tank: area:36 m^2 Diameter: ~7m Height: 1.2m Dirt hillock: 2.5m

Simulation: select the WaterAbsLength(maxReflectivity 97.5%) maxWaterAbsLength : 10m maxWaterAbsLength : 20m maxWaterAbsLength : 30m maxWaterAbsLength : 50m

maxReflectivity : 90% maxWaterAbsLength : 30m Simulation: select the maxReflectivity

maxReflectivity : 97.5% maxWaterAbsLength : 30m Mev, no shielding layer

maxReflectivity : 97.5% maxWaterAbsLength : 30m

Single particle resolution vs. water depth Single particle resolution

Punching-through

Dirt thickness Muon MPV Detect efficiency (0.5 mpv) Gamma mean Punching through (0.5 mpv) 0.5 m % % 1 m % % 1.5 m % % 2 m % % 2.5 m % % 3 m %8e %

Simulation conclusion: The length of tank>1.2m the thickness of dirt> 2.5m Reflectivity>97.5% WaterAbsLength>30m

Experiment in lab scintillator Small bag made of 2 layers, the inner is tyvek, the outer layer is TPU. 72cm 1.2m

prototypes dirt hillock concrete tank

prototypes: concrete tank

tyvek LDPE (low-density polyethylene) HDPE (high-density polyethylene) prototypes: plastic bag nuts sealed with the disk Stainless steel disk adhered on the bag PMMA cover adhered between the steel disk and the bag inletoutlet

prototypes: PMT and bag’s assembly transparent cover PE chimney Plastic pipe for installing the PMT Steel disk Cone nail for locating PMT hatchcover

Prototype: water quality Water –processing: Filter 、 UV disinfection 、 Soften 、 eliminate chlorine steriliration and cleaning of the bag airproof of the bag

conclusion The experiment of Small tank is ongoing The prototypes will complete in a half year

thanks