NYS Department of Environmental Conservation Through The Probe (TTP) NYSDEC Plan for Auditing For NPAP NESCAUM MAC Meeting Troy, New Hampshire April 24.

Slides:



Advertisements
Similar presentations
Service Tips April COOLING SYSTEM To check and/or fill the cooling system it is necessary to remove the rear fender, the fuel tank (photo 1) and.
Advertisements

PowerPoint ® Presentation Chapter 15 Troubleshooting and Mitigating IAQ Problems Troubleshooting and Mitigating IAQ Problems Overview of Non-IAQ Problems.
Food Safety Site Evaluations. 1.) Learn what the customer does 2.) Specific areas of concern 3.) Current treatment technologies 4.) What are their food.
NYS Department of Environmental Conservation Update on the Niagara River U.S. RAP Niagara River Remedial Action Plan Implementers Session April 10, 2013.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Installation. Indoor Unit Installation Typical Installation.
New Products 5204 Openable API Bottom Loading Adapter Integrated flow indicator Longer sight glass Teflon lip seal in stuffing box Ergonomic aluminum.
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Reservoirs Covered in Ch. 5 of Vickers Text
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
Why do we lose analyzer data? Monitor malfunction DAS malfunction Power outages Environmental problems Wildlife damage Vandalism Operator error.
Data QA/QC Techniques. Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.
The Mondial Forni Mondial and Ecomondial steam tube fixed deck ovens, gas or gasoil heated, are composed of independent decks with standard working height.
Drug Delivery & Tissue Engineering Laboratory
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Cleaner Production Assessment (Chapter 4)
2-4. Solar Panels.
Air Pollution Control for the Hydraulic Fracturing Industry Protecting the Workers Protecting the Environment Controlling Escape of Airborne Sand.
24 x 7 Energy Efficiency February, 2007 William Tschudi
Instrumentation Developments in Stream Switch Valve Technology Steve Doe, Parker Hannifin Corporation.
National Air Monitoring Conference EPA Precursor Gas Training Workshop Dennis K. Mikel EPA - Office of Air Quality, Planning and Standards Technical.
Monitoring Systems Gaseous Pollutants mini-course TAMS Center February 2009.
Ozone and Ozone Monitoring 2015 National Tribal Forum Glenn Gehring, Technology Specialist III Tribal Air Monitoring Support (TAMS) Center Institute for.
Your House as a Healthy System Bruce Stahlberg. Improvements / Remodeling When one has finished building one's house, one suddenly realizes that in the.
High Density Cooling Air conditioning for high density applications
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Installation. Indoor Unit Installation Typical Installation.
Settings & Adjustments. Settings & Adjustments.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Preventing Silicosis in the Mining Environment. 1.Prevention of Silicosis to Improve Mine Workers Health and Quality of Life. 2. Compliance with MSHA.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
Quality Control – Part II Tim Hanley EPA Office of Air Quality Planning and Standards.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
California Emerging Technologies Statewide Program Dynamic Air Quality Solutions December 10, 2012.
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
WHAT IS THE CHEROKEE NATION? Cherokee Nation Air Quality Data Management Concepts for Quality Data Collection Ryan Callison.
Automotive Engines: Theory and Servicing, 6/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ
Reaction Monitoring with ReactionView ® and ReactionProbe™ In-situ contamination and surface analysis with SpotView and SpotView-SL © Remspec Corp
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Easy FlowTM and Smart FlowTM
PP-00XXX A WEATHERFLO ® HD. TNT WEATHERFLO ® HD Overview  WEATHERFLO HD integrated VFD Cooling Solution –Designed to protect and cool Variable.
3.0 Comprehensive Performance Audit Fossil Fuel Appliances Health & Safety 3.2.
Day 1 Part 4 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Day 2 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
COMPRESSED AIR ENGINE (An engine which runs on Air only)
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Sampling Oil-Filled Transformers
Plating Cell Considerations/ Proper Cell Design,
Draught Finder 4. Air Tightness Inspections The Air Test Trevor Clark
Design, Evaluation and Application of a Fuel Cell Vehicle
14 Refrigerant Recovery, Recycling, and Recharging.
Automotive Engines Theory and Servicing
Thunderbird Water Pump Upgrade
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Part 2 – Supplied-air Respirators
Service Tips April 2005.
The Improvement of ALARA for the Steam Generator Maintenance
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Automotive Technology Principles, Diagnosis, and Service
Automotive Engines Theory and Servicing
Presentation transcript:

NYS Department of Environmental Conservation Through The Probe (TTP) NYSDEC Plan for Auditing For NPAP NESCAUM MAC Meeting Troy, New Hampshire April 24 – 25, 2007

TTP rack Photo Shows: - line conditioner, - cooling fans (2 more in back) rotometer on right is for TTP Ozone analyzer sample line connection, - API 700E calibrator, - pull out shelf, and - API 701H zero air supply

Presentation line Pulling the ½” Teflon tubing through the polyolefin tubing. Heat shrinking the polyolefin tubing.

Initial checkout of TTP system A complete set of analyzers (SO2, CO, Ozone, & NOx) was set-up to thoroughly test system before the EPA evaluation.

Certification in QA Lab Front of TTP rack, with the required ozone analyzer on top Back of TP rack showing the presentation line connections

Certification in QA Lab The multi gas certifications were conducted using the QA Labs glass manifold.

Van Modifications before modifications after modifications

Van Modifications before modifications after modifications

Vehicle Equipment Full sine wave 1500 watt invertor Exhaust line, power bar, 8’ folding ramp, gas cylinder mounts

EPA Lab in Edison, NJ NYSDEC -TTP rack evaluation

SITE AUDITS:

NYS Department of Environmental Conservation Loaded Van Fully loaded Van - presentation line - TTP rack - plywood panels to roll rack over grass - digital recorder - travel case with supplies - multi gas cylinder (SO2, CO, NO in Nitrogen)

Manifold connections: EPA staff have been The DEC presentation line using a siliconized plug is connected to the manifold that is a friction fit and the by an endcap modified with a presentation line is held screw type fitting that uses a place with bungee cords viton o-ring seal. Bungee cords used for strain relief.are also used for strain relief.

Niagara Falls CAM

NYS Department of Environmental Conservation Buffalo Primary

NYS Department of Environmental Conservation Tonawanda

NYS Department of Environmental Conservation Dunkirk

NYS Department of Environmental Conservation PROBLEMS NOTED AT SITES There have been several findings that could lead to the reduction in significant problems during future audits. - dirty manifold- dirty sample lines - dirty connectors- dirty particulate - leaky joints filter holders - difficult access

Dirty manifolds CO does not appear to be affected by an accumulation of dirt. SO2 is affected in that it takes significantly longer to come to equilibration. A dirty manifold seriously degrades Ozone response (anywhere from 4% to 6% loss), A dirty manifold lowers NO2 results (approx. 2% to 4%)

NYS Department of Environmental Conservation Manifold Have found that even with a clean manifold the joints collect enough dirt to affect the NO2 and Ozone responses. When manifolds are cleaned, attention needs to be given to the Teflon connection between the sections of glass manifold.

Leaky connections leaking joint (inside), it’s not easily seen, but there is a crack in the Teflon that caused a significant cycling in the analyzer response during an Ozone audit. Chart showing looping effect caused by the leak

Leaky connections When joints are misaligned, rain can enter the manifold – have seen water on top of the bug screen. - in the upper photo the rubber seal is being pinched causing a leak - in the lower photo the stainless steel shield is in place, which completes the seal.

NYS Department of Environmental Conservation Recommendations? Sample lines -Should be cleaned or replaced annually?

NYS Department of Environmental Conservation Recommendations? Particulate filters ‑ have found dirty particulate filter holders can retain enough contamination to have an effect on instrument responses with NOx and Ozone. Clean annually ?

Sunlight Effects Sunlight has not been a problem with SO2, Ozone, or CO TTP. Sunlight appears to convert NO gas in the presentation line to NO2, It is necessary to eliminate exposure of the audit gas to sunlight. - The presentation line must be covered: - EPA uses aluminum foil ‑ tears easily, needs to be replaced frequently - DEC is using polyolefin (heat shrink) tubing ‑ has been shown to work well both in lab and initial field audits It is also necessary to cover all exposed glass manifolds: - Have been using aluminum foil - are investigating other materials (mylar, woven plastic, corrugated dryer vent, etc.

Sunlight Effects

Hidden Requirements (TTP) Must write acceptable QAPP Must write acceptable SOP’s Annual certification of TTP equipment Annual certification of TTP operator It is also recommended that a TTP audit be repeated at a site within several days of an EPA TTP audit sometime during the year

EPA Results 2006 Parameter sites audited range of ave. %d’s SO % to + 1.9% CO % to + 0.8% Ozone % to + 5.5% NO % to +7.2% NO % to +6.7% NOX % to +8.3%

NYSDEC results 2007 Parameter sites audited range of ave. %d’s SO % to + 3.2% CO % to – 0.3% Ozone % to + 1.1% NO % NO % NOX %

NYS Department of Environmental Conservation Recommendations When siting or modifying existing sites, a gate directly in front of the door would be very beneficial – avoids having to lift the TTP rack in and out of shelter. Keep manifolds clean, TTP audits take longer than a back of the analyzer audit (3 - 4 hours vs. 1½ -2hours) – a dirty manifold can add significantly to the time it takes to conduct the audit.

Manifold Replace inverted cane type manifolds with a vertical inlet

Manifold The use of a lower volume blower will help keep the manifold cleaner Primary CAMS came equipped with a blower that draws between 45 and 65 CFM, with a residence time of approx. 2 to 3 seconds.

NYS Department of Environmental Conservation Thank you, Any Questions ???