1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
RF Cavity / Coupling Coil Module
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
High Density Interconnect (WBS 1.4.3) Extension Cables (WBS 1.4.4) Douglas Fields University of New Mexico Douglas Fields, FVTX DOE Review November 17,
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HFT face-2-face F.Videbaek Brookhaven National Lab.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M. Brooks, LANL 1 02/19/07 Review Schedule The FVTX upgrade project Melynda Brooks Silicon Sensor, Chip, ReadoutJon Kapustinsky Mechanics Walt Sondheim.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
03/12/07 Jon S Kapustinsky LANL Jon S Kapustinsky, LANL Forward Vertex Detector Collaboration Meeting UNM, March 12, 2007 Outline: FVTX Overall Description.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Aug 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
M. Brooks, LANL 1 Intro Goals: Status reports on each topic, to bring all collaborators up-to-date on work To-Dos for upcoming review, and following review,
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Melynda Brooks, FVTX Closeout Review, April FVTX Project Overview Cost & Schedule Deliverables Melynda Brooks Los Alamos National Laboratory FVTX.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Douglas Fields, fVTX HDI Technical Review October 23, 2009 High Density Interconnect WBS Douglas Fields University of New Mexico 1.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Melynda Brooks, FVTX Annual Review, November FVTX Project Overview Cost & Schedule Melynda Brooks Los Alamos National Laboratory FVTX Project Manager.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Final CALICE OsC meeting: Status and summary of project
TK Upgrade report.
Presentation transcript:

1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee

2 Talk Outline Schedule Overview - Current, and comparison to Baseline Technical Status of each WBS item Status Schedule compared to Baseline Cost/Schedule mitigation efforts, where needed Preparation for September Review Report Near-term Activities

3 FVTX Tasks and Schedule (Current) FVTX ProjectFri 10/21/05Wed 8/3/11 Start ConstructionTue 4/1/08Tue 4/1/08 Start R&D BNLMon 1/2/06Mon 1/2/06 Start R&D LANLMon 1/2/06Mon 1/2/06 Wedge ComponentsThu 3/15/07Mon 12/13/10 Wedge sensorsFri 2/15/08Mon 12/13/10 FPHX ChipThu 3/15/07Mon 4/19/10 Kapton flex cables HDIWed 6/4/08Thu 4/9/09 Kapton HDI to ROC interconnectWed 10/8/08Wed 4/8/09 DAQMon 10/23/06Mon 8/2/10 MechanicsFri 10/21/05Thu 6/9/11 Endcap AssemblyThu 6/18/09Wed 8/3/11 System IntegrationWed 4/2/08Thu 3/10/11 Mechanical engineer Fri 4/25/08Thu 3/10/11 Electrical EngineerFri 4/25/08Thu 3/10/11 FVTX ManagementWed 4/2/08Thu 3/10/11 Tasks this FY include prototyping of all wedge components and DAQ as well as prototyping of much of the mechanics

4 FVTX FY08 Tasks and Funds R&D Construction $ Procure prototype sensors and test $109.9k Design/Procure prototype FPHX chips $184k $ Design/Procure prototype HDI $ Wedge assembly prep $ Design/Procure prototype ROC/FEM (LANL LDRD) 1.5 ROC prototype ($71k construction) - hold 1.6 Design/Procure prototype mechanical structures (cage, backplane, disk, jigs) (part R&D) $ Integration, Management $ 86 Total $499

5 Schedule Snapshot, from Initial Package

6 FVTX Technical Status - FPHX FPHX Readout Chip Prototyping, LANL + FNAL FNAL completed all analog simulations, quite a number of digital simulations (hits in various channels), plus complete analog + digital simulation. Everything checked out o.k. In-person review of design with Jim Hoff/Tom Zimmerman by Jon Kapustinsky, Sergey Butsyk. No issues. Chip submitted to MOSIS last week of May. MOSIS run started June 2, expected delivery by end of July (~8 weeks preliminary estimate). Approximately 1 month delay compared to Management Plan due to longer time needed for layout than anticipated (plus FNAL furloughs). Partially addressed by additional reviews of chip to try to maximize probability that 3 rounds not needed. 20 weeks of float in the schedule on this task Increased overall costs due to mis-calculated FNAL overhead Critical Path Item HDI Sensor

7 FVTX Technical Status - HDI and Sensors High Density Interconnect, UNM + LANL Mark Prokop, LANL EE produced schematics, basic layout of HDI while UNM designer was unavailable Mark transferred current HDI package to UNM beginning of June (schematics, HDI outline, etc.) Layout at UNM in progress Expect delivery of prototype HDI by August. ~2.5 month delay due to unexpected designer availability issues; addressed by pulling LANL EE onto project. Not critical path Sensors, LANL Hamamatsu awarded sensor prototype contract Design specifications and preliminary layout from LANL received by Hamamatsu and they are working on real sensor layout Expect prototype sensors by October 2008 Prototype delayed compared to Management Schedule, but production is still on track. Also, not on critical path.

8 FVTX Technical Status - DAQ DAQ, LANL ROC layout expected complete and ready for procurement by end of July FEM schematics not quite completed, but layout in progress with what is available. Simpler board, so still expect layout complete near end of July Discussing DAQ test stands for prototypes that will be tested this summer/fall: FPHX chips, chips with HDI, chips with HDI and sensor. Prototype schedule on track, but 2nd round procurement delayed to FY09 due to additional funds that were transferred to FPHX task. Active development of test stands (LANL + UNM) ongoing to prepare for testing of prototype FPHX, sensors, HDIs

9 FVTX Technical Status - Assembly Wedge assembly - Columbia SiDet (FNAL) will make prototype assembly (this summer) and quote on cost for them to perform full assembly Walt Sondheim/HYTEC working with FNAL on assembly jig design and procurement Detector Disk Assembly - NMSU Steve Pate starting sabbatical at end of summer to set up BNL assembly areas Assembly plan detailed with manpower, schedule by Steve HDI Sensor FPHX chip bonded to HDI Backplane Rigid, thermally conductive epoxy Rigid epoxy

10 FVTX Technical Status - Mechanics Mechanics - HYTEC/LANL Backplane design completed, being prototyped by FNAL Disk plane design completed, working toward final drawings Cage design reviewed internally, some iteration with LBNL (manufacturer) on optimizing design Expect cage prototype by end of FY

11 September Review Report "Prior to the next annual review, perform a detailed study of the trade-offs between noise hit levels, ADC signal thresholds, raw data bandwidth bottlenecks, Level-1 latency and memory requirements, tracking efficiency, and physics performance. Derive a set of "final" functional requirements that the FVTX system needs to satisfy within a reasonable period of time after project completion in order to achieve the physics goals and meet the recommendations expressed in the FVTX Science Review report.” Simulation code updated to allow full flexibility in setting noise, threshold levels. Studies underway to map out performance across parameter space. DAQ bottlenecks straight-forward to calculate for any parameter. Expect performance reasonably well mapped out by September already “Documents for technical specifications, testing plans, and procedures should be finalized, approved, and adopted prior to procurement” Drafts all produced, most reviewed and finalized already. Will include in report. “A detailed grounding & shielding plan should be developed and reviewed prior to the annual review” Grounding & shielding plan produced: collaboration with LANL, Eric Mannel (electronic integration engineer), FPHX designers (FNAL), HDI designers Will be reviewed along with electronics components at August 2008 PHENIX review. “Identify a systems integration manager” Project managers provide overall integration, Walt Sondheim mechanical integration, Eric Mannel electrical integration, Robert Pak integration to BNL infrastructure

12 Near-term Activities Expect delivery of all wedge component prototypes by August (FPHX, backplane, HDI, DAQ boards) or October (sensor), Preparing test stands for full test Developing list of tests to establish full functionality of FPHX, sensor, HDI, ROC/FEM prototypes Preparing for blind physics analyses, complete with embedding (wasn’t enough time to complete before science/technical reviews)