B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Heat Pump Water Heaters Kacie Bedney, P.E. – Project Manager Bonneville Power Administration.

Slides:



Advertisements
Similar presentations
Advanced Heat Pump Water Heater Research Conducted by WSU Energy Program Funded by Bonneville Power Administration BPA Technology Innovation Project #292.
Advertisements

Thermostats, Pressure Switches, and Other Electric Control Devices
Heating, Ventilating, and Air-Conditioning
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
TYPES OF MECHANICAL SYSTEMS
KE2 Evaporator Efficiency
Energy Saving Control-Strategies for Reefer Containers Kresten Kjær Sørensen, Lodam electronics.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Engineer Presentation
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
Heat Pump Clothes Dryer Presented on April 23, 2008 By Brian Pollica Michael Hildenbrand.
WP Inc. Case STUDY 3.1 Problem Solving Jonathan Stanley & Kari Eddings
Product Introduction.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Richard Simmons Drilling Company, Inc. 60 Drill Rig Drive, Buchanan, Virginia Telephone (540) Geothermal Heating & Cooling How it Works.
Hydronic Mechanical Controls
BPA Pre-Pilot, Monmouth  14 homes with installed DHP, single zone, single compressor.  11 Monmouth, 2 Moses Lake, 1 Tacoma  Savings.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
Heat Pump Water Heater (HPWH) Subcommittee Christian Douglass Regional Technical Forum June 18, 2015.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Residential Hot Water Use Patterns and Energy Efficiency April 29, 2014 Advanced Energy Conference - Albany Hugh Henderson CDH Energy Corp.
HPWH UES Measure Initial Review 16 April Agenda Provisional Measure Review Method Overview Prelim Findings Measure Development Approach Simulation.
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
Hawke’s Bay Refrigeration
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
Edison would be pleased. 2 / Edison secured a spot in history, igniting a company built on innovation and leadership 1879 – Incandescent Lamp 1949 – Jet.
USGBC NY Upstate Chapter R333 Domestic Hot Water: Usage Research DHWUR Hugh Henderson March 22, 2014.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Northwest Power Planning Council The Fifth Plan’s Draft Conservation Resource Assessment Summary of Results To Date April 8, 2003.
1 Distribution Efficiency Conservation Voltage Regulation (CVR) Jillianne Welker 4/21/2009.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Combo products: Space + Water Market Drivers and Field Testing Status.
Why Maintenance Tasks are Important Produced by Joe Marchese.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration Heat Pump Water Heater Laboratory Testing Results & Field Work.
Emerging Technologies Presented by Mark Rehley, Emerging Technology Operations Manager Northwest Energy Efficiency Alliance.
Residential Heat Pump Water Heaters: HVAC Interaction Study RTF HPWH Subcommittee May 14, 2015.
Solar Heating/Cooling/Dehumidifier Systems
HEATING AND COOLING SYSTEMS
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Authors: William Tschudi, Lawrence Berkeley National Lab Stephen Fok, Pacific Gas and Electric Company Stephen Fok, Pacific Gas and Electric Company Presented.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
Regional Air Source Heat Pump Performance and Savings Research and Evaluation Project Proposed Scope of Work and Estimated Budget February 10, 2004.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
Seventh Plan Update RETAC September 23, Final Plan Update Review of Past Program Results Emerging Tech & New Measures Finance, Admin Cost, Line.
NEEA Regional HPWH Workshop Seattle May 2011 John Karasaki, P.E. Manager – Programs
Northwest Power and Conservation Council Slide 1 Heat Pump Water Heaters Tom Eckman Manager, Conservation Resources Northwest Power and Conservation Council.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Northern Climate HPWH Spec Update.
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Heat Pump Water Heater Market Transformation Update March 27th 2012Dave Kresta.
Heat Pump Water Heaters: Interior, Ducted Installations Presentation to the Regional Technical Forum December 13, 2011 Ben Larson, Ecotope
Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Northern Climate HPWH Specification Update Dave Kresta, NEEA 11/10/11.
Energy Star Heat Pump Water Heating Program May 25, 2011 Dennis Rominger Program Manager
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
Air source heat pump Understand the fundamental principles and
Heat Pump Water Heaters
. Level 3 Air Conditioning Inspections for Buildings
Elliott Microturbines Absorption Chiller Integrated System Development
GEYSER Heat Pump Water Heater
By: JAGDEEP SANGWAN Refrigeration Basics 101.
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Heat Pump Water Heaters Kacie Bedney, P.E. – Project Manager Bonneville Power Administration - Energy Efficiency May 24, 2011

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 Presentation Overview  HPWH Potential  BPA’s approach to this technology  Two projects: Project 1 – Laboratory Testing Project 2 – EPRI Energy Efficiency Demo  Lessons Learned  Next Steps  BPA Resources and Contacts

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 What is the potential of HPWH?  Potential: Only 8 aMW or 31,614 units by end of 2014  Sixth Power Plan potential 5.2 million households in Pacific Northwest 1.49 million use electric water heat 3.70 million single family homes 673,000 w/ water heater in garage 40% 45% 5% 5% in 5 years of these

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 4 Our approach to this technology….. Project 1: Laboratory Testing*  Testing 3 integrated units Project 2: EPRI Demonstration*  Nationwide testing of ~160 residential units  BPA utilities will install and test 40 units in the region (with an additional 10 “control” homes)  HPWHs monitored for: efficiency, performance, reliability, electric demand, application issues and customer behavior *Funded by the Office of Technology Innovation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 5 GE 50-gallon AO Smith 80-gallon Rheem 50-gallon Which major US HPWH manufacturers?

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 Project 1: Laboratory Testing

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 BPA laboratory testing Tested 3, US manufactured, integrated units  Impact of ambient intake air  Impact of exhaust air on home/garage  Impact of inlet water temperature  Issues about condensation  Potential for icing on coils  Impact of clogged filter  Recovery time  Hot water draw profile

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 8 BPA lab testing: project goals  Gather impact data specific to the region to: a)“prove” there are conditional impacts and encourage manufacturers to address them, or b)“disprove” the impacts, allowing installations to commence in the region  Evaluate the lab testing results and provide manufacturer-specific feedback to assist BPA in driving Pacific Northwest region- specific technology improvements

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 9 BPA lab testing: project team BPA: Project management, methodology oversight, lab test regional coordination, evaluation review, regional rollout of results. Ecotope, Inc. – Develop the analytical methods, protocols and lab testing necessary to evaluate HPWHs and provide technical evaluation reports on the results. Advisory Team – Develop and assist in determining the lab testing criteria. Members include utilities, RTF, contractors, consultants from the region and EPRI. NREL – Lab testing

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 10 Testing Chamber at NREL Photo credit: Kate Hudon, NREL PIX # 18678

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 11 Testing Chamber at NREL Photo credit: Kate Hudon, NREL PIX # 18667

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 12 Our Lab Story: Manufacturer A: 55 degrees

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 13 Our Lab Story: Manufacturer B: 55 degrees

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 14 Our Lab Story: Manufacturer C: 57 degrees

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 15 Lab Testing Observations Manufacturer A:  Pro: The component selection and wrap-around condenser implementation provide high levels of efficient heat transfer  Pro: Operating range (45F-109F) & compressor performance make this well suited for buffered or semi- conditioned spaces  Pro: The larger tank is able to heat water most of the time with the heat pump, without resorting to supplemental resistance elements  Pro: Resistance heat will only be used in very high demand applications

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 16 Lab Testing Observations Manufacturer A:  Pro/con: High air flows across the evaporator do optimize the heat transfer from the air, but come at the expense of fan energy  Con: To change the air filter, a screw securing it to the heat pump shroud must be removed vs. a slide out  Con: Touch screen is not particularly responsive  Con: One mode not offered is simultaneous use of the upper element and the compressor – this would provide maximum heat output while maintaining efficiency

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 17 Lab Testing Observations Manufacturer B:  Pro: For tanks that don’t mix and remain stratified, the outlet temperature stays high until most of the tank water has been replaced.  Pro: Does not enter defrost mode too frequently  Pro: Operating modes offer a reasonable mix of strategies to meet efficient or high demand scenarios  Con: Changing a set point or the operating mode, which are the most basic adjustments a user would make, requires going through several menus

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 18 Lab Testing Observations Manufacturer B:  Con: The 45.5 gallon tank is likely to meet the needs of only light to medium hot water use households  Con: Compressor does not cycle back to hybrid mode once it has been shut off and the resistance elements take over  Con: Not allowing the compressor to turn on again during the recovery cycle is a performance decrement, especially when there are no water draws occurring during that time.  Con: Compressor capacity is fairly limited e.g. at 67°F ambient air, a complete draw down (a bath) will take 6-7 hours to heat the tank

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 19 Lab Testing Observations Manufacturer C:  Pro: The reasonably sized compressor capacity has the advantage of providing more heat, more quickly, to the water in heat pump mode.  Pro: Allowing both the compressor & upper element to run is an optimal way to produce hot water quickly while still maintaining improved energy performance  Pro/Con: A reasonable mix of strategies to meet efficient or high demand scenarios, but the compressor operating range and the circulation pump limit the usefulness of this

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 20 Lab Testing Observations Manufacturer C:  Con: Using a temperature gradient on the panel, forces the owner to reference the manual to learn what setting is required for 120°F water  Con: The operating range of °F is too narrow for the Pacific Northwest for garage installations. So it will only work for conditioned spaces.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 21 Lab Testing Observations Manufacturer C:  Con: For temperatures below the low 60s, the coil temperature drops quickly to a range which could induce frost buildup. The compressor cycles off for a defrosting period. But with no active defrosting, the equipment uses resistance heat while waiting for the coils to warm up again  Con: In using a circulation pump in the design of the equipment, extremely low water users may find the water temperatures acceptable, but other users are likely to encounter undesirable periods of cold water.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 22 Project 2: EPRI Energy Efficiency Demonstration

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 23 EPRI Energy Efficiency Demonstration  Nationwide testing of 160+ residential HPWHs GE, AO Smith, Rheem  Collaborative research with multiple utilities  BPA utilities will test 40 units in the region (with an additional 10 control homes)  HPWHs monitored for: efficiency, performance, reliability, electric demand, application issues and customer behavior

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N treatment sites Single-family residential homes, maximum 10 per utility  Provided with new HPWH  Instrumented and monitored for up to 2 years  Daily uploads of data to EPRI via internet  Occupant observations before and after installation  Occupants permitted to adjust water temperature and operating modes as desired  Occupants instructed to operate HPWH normally, year-round EPRI Energy Efficiency Demonstration

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N control sites Single-family residential homes, maximum 3 per utility  Instrumented and monitored for up to 2 years  Provides baseline for comparison with treatment sites EPRI Energy Efficiency Demonstration

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 26 Monthly COP vs. Ambient Temp for BPA January 2011

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 27 Monthly COP vs. Ambient Temp for BPA February 2011

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 28 Monthly COP vs. Ambient Temp for BPA March 2011

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 29 Monthly COP vs. Ambient Temp for All March 2011

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 30 Customer Feedback (~1 month) Temperature Change around Water Heater  24 of 40 (60%) noticed it was colder around the unit  Majority didn’t find it bothersome, a minor annoyance at best Noise  37 of 40 (93%) noticed the additional noise  7 answered “bothersome”, but considered it a mild disturbance Features and Controls  Installers generally provided little training and many didn’t understand how HPWHs operate  Homeowners found the features/controls easy to understand and use  Most adjusted their water temperature (default is 120-deg F)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 31 Noise Perspective Noise Pollution Clearinghouse* Refrigerator Typical Living Room 40 Forced Air Heating System Radio Playing in Background Exhaust Fan Microwave Normal Conversation Clothes Dryer Window Fan on High Dishwasher Clothes Washer Hair Dryer Installed Sites HPWH Intake HPWH Exhaust (readings taken 3-ft from unit, 5-ft from floor) *

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 32 Installation Lessons Learned ManufacturerWater pressure cut off Protocol Install regulator to: GE80 psiMaintain pressure below 80 psi AO Smith80 psiMaintain pressure below 50 – 60 psi Rheem125 psiMaintain pressure below 125 psi DaikinCapacity of pressure relief value Maintain pressure within capability of relief value Water pressure should be recorded as a part of the site assessment and a regulator installed if the pressure does not meet the following parameters:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 33 Installation Lessons Learned CategoryLesson HPWH STAND Consideration should be given to local codes, as some jurisdictions may require stands for electric water heaters installed in garages based on fire concerns with a potential ignition source. HEAT TAPE Heat tape is not necessary for condensate drains located in garages in the NW. EXPANSION TANK If not present, an expansion tank must be installed to meet code requirement for thermal expansion.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 34 Installation Lessons Learned CategoryLesson CONDENSATE LINES Consideration should be given to the necessity of condensate lines or a condensate pump for each installation. DAIKIN ALTHERMA INSTALL Installation of the Daikin units is considerably more complex than the tank-integrated HPWH units. At a minimum, this is a 2 day installation which requires detailed commissioning per unit/location according to the Daikin’s field settings report and an additional visit at 4 – 6 weeks to check and clear the closed water loop strainer.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 35 Next Steps for BPA Combine:  Laboratory test data (controlled environment data)  Early EPRI demonstration NW results (“real life” data) Determine:  What are the energy savings from this technology?  What is the cost benefit?  Determine the readiness of a BPA incentive  Can BPA support this current technology?

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 36 BPA Resources  Check out BPA’s Web site for more information about HPWHs and other residential activities  Link to BPA’s laboratory testing protocols Plan_Final_ pdf  Link to BPA’s Emerging Technology activities

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 37 Contact Information BPA Lab testing, Field testing Kacie Bedney, HPWH Project Manager Bonneville Power Administration BPA Emerging Technology Jack Callahan, Emerging Technology Bonneville Power Administration BPA Residential Sector, general Sarah F. Moore, Residential Lead Bonneville Power Administration