LINK 2000+ EEC Test Facility - ATN 2003 London 1 LINK 2000+ Test Facility Overview Located at EEC Bretigny - France In support to LINK 2000+ EATMP project.

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

ACARS & VDL Mode AVICOM Japan
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
GLOBALink/VHF Digital Link Mode 2
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
ATN 2001, London - 18 Sep 01 1 PETAL II and II Extension Maastricht Multi-stack Implementation Lessons Learnt Prepared by Gustaaf Janssens/Konrad Koebe.
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
Modified Automatic Dependent Surveillance (Expanded)(Expanded) M-ADSM-ADS As implemented in Norway.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
FAA/JCAB ATN & AMHS Trial Varadero, Cuba May 2002 Presentation ATN 3.2 by H. Tran.
WAEA On-Board Infrastructure ah hoc group 1 WAEA Internet Working Group On-board infrastructure ad hoc group Revised by Rolf Goedecke August 18, 2000.
BCI’s Aeronautical Telecommunication Network (ATN) Router
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
ATN 2001, London - 18 Sep 01 1 PETAL II Extension Architecture, Integration and Testing Prepared by Martin Adnams/Isabelle Herail.
AMHS (ATS Message Handling System)
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.
Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
1 New Algorithms and Protocols: Development and Testing at HPGC Research Lab PATH: measures Bottleneck Bandwidth PATH: measures Bottleneck Bandwidth Testing.
Technical aspects of designing of network UZSCINET V.Navotny.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
Air Traffic Control Communication
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
AMHS (ATS Message Handling System)
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
Presented by Thales Avionics ATN 2003 London, UK September 2003
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN London - 23 September 2003 Alex Wandels
The Air Ground Datalink Server (AGDS)
FANS (Future Air Navigation System) Flight Crew Procedures
NEXCOM Next Generation Air/Ground Communications Appendix G
Ground based ATN Router Requirements
Ground System implication for ASAS implementation
Presented at ICAO ACP WG-I By Robin Hughes
NEXCOM by Bruce Eckstein FAA.
FAA/JCAB ATN & AMHS Trial
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
ATN Subnetwork Implementation:
FAA Data Communications Program System Engineering
Presentation transcript:

LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project Includes three components: –CM/CPDLC Test Facility –VDL Mode 2 Test Facility –ATN Network Infrastructure Facility

LINK EEC Test Facility - ATN 2003 London 2 CM/CPDLC Test Facility Objectives Offering an inter-operability testing platform for LINK Baseline Support to Avionics and Airlines Support to Maastricht and other Ground implementations Support in deployment of Ground-Ground infrastructure (and Ground to Air-Ground infrastructure )

LINK EEC Test Facility - ATN 2003 London 3 CPDLC Air and Ground Test Tools Functionality Implement LINK2000+ Baseline Air and Ground messages sets with support of single and concatenated messages Support of Test Error cases: –Invalid message sequences, wrong message ID –LACK not sent –Unsupported messages Automatic generation of messages with configurable period (to stress remote system)

LINK EEC Test Facility - ATN 2003 London 4 Air/Ground Test Tools Architecture AIR/GROUND TEST TOOL HMI Airtel CPDLC/CM ASEs ATN Upper Layers Airtel TAR-TTS BIS/ES Ethernet Access X.25 Access COMPAQ EVO PC Linux OS Wanware X.25 boards Lan integrated interface

LINK EEC Test Facility - ATN 2003 London 5 CPDLC Ground Test Facility

LINK EEC Test Facility - ATN 2003 London 6 VDL M2 LAB Test Facility Objectives To get a system in LAB functionally as similar as is possible to the operational system: –verification of VDL M2 intended functioning –close look at VDL M2 Handoffs To be able to conduct end-to-end CPDLC testing in LAB via VDL M2 To get expertise on the ACSP VDL M2 equipment To help in investigations of real environment VDL M2 problems

LINK EEC Test Facility - ATN 2003 London 7 VDL M2 LAB Test Facility Functionality Core component: the ARINC VDL M2 AGTS –Operationally equivalent ATN/VDL M2 capable Test facility –Includes two VGSs and associated VDRs –Includes Variable RF attenuators for simulation of live mobile environment –Includes A/G BIS and G/G BIS routers –Allows registration of traces in VGSs and monitoring of the VDL M2 traffic from a third VGS/VDR set

LINK EEC Test Facility - ATN 2003 London 8 VDL M2 Test Facility Architecture Avionics Pallet CMU VDR Vdl-2 radio VGS Control Unit Vdl-2 radio A/G router G/G router Ground Test Tool Equipment Coaxial Cable Network MCDU VDL M2 Air/Ground Test system:AGTS

LINK EEC Test Facility - ATN 2003 London 9 ROCKWELL COLLINS Avionics Pallet Installed at EEC

LINK EEC Test Facility - ATN 2003 London 10 ARINC VDL M2 AGTS Installed at EEC

LINK EEC Test Facility - ATN 2003 London 11 LINK End to End Architecture End to End ATN VDL M2 Network Architecture End to End CM/CPDLC Architecture

LINK EEC Test Facility - ATN 2003 London 12 ATN/VDL M2 Network Architecture AGR GG Bis GG Bis ARINC Network UAC/Maastricht X25 switch GG Bis PROATN TAR/TTS Airtel ES EEC/Bretigny GG Bis PROATN P2FEP PROATN ES x25 X25 switch AGR FDPS Ground/Air Test Tools ARINC NR ATN VDL M2 VGS

LINK EEC Test Facility - ATN 2003 London 13 CM/CPDLC End To End GBIS ProATN GES ProATN MADAP P2FEP Maastricht UAC GBIS ATN ES HMI CPDLC Ground Centre CMU Simulator Collins Cedar/Rapids X.25 Network A/GBIS ProATN Ground Ground ASEs TAR-TTS TEST FACILITY EEC Bretigny Air ASEs TAR-TTS TEST FACILITY Air CMU ATN VDR MCDU R ES Avionics ATN A/G R VGS VDL M2 Network

LINK EEC Test Facility - ATN 2003 London 14 LINK ATN VDL M2 Flight Trials Status From September 03 to October 03 : Flight trials with NLR Citation experimental Aircraft equipped with Rockwell Collins Avionics against EEC CPDLC Ground Facility. –Main objective is to complete check of LINK VDL M2 area coverage December 03: Start of SAS revenue flights against EEC and Maastricht Development system.