ERT 323/2 SIMULATION FOR BIOPROCESS ENGINEERING SEM 2 (2012/2013) Modeling & Simulation of Bioprocess: ‘THROUGHPUT ANALYSIS & DEBOTTLENECKING STRATEGIES’

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

HUMIDIFICATION/COOLING TOWER
WHAT IS STEAM PRO? Thermoflow, Inc.
Flow Rate and Capacity Analysis
Heat Exchanger Network Retrofit
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.

Profitability and Risk Management 1 Theory of Constraints Let’s go back to the CVP model: What “constrains” your profit? If you can choose X to be arbitrarily.
Theory of Constraints Part II: TOC Concepts
PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014) Batch Processing Modelling (Unit Procedures Initialising)
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Dr. F. Iskanderani Spring 2003/2004 Example C : Component.
Kristen’s Cookies.
13 Relevant Costs for Decision Making Chapter Future revenues or costs that differ among alternatives. Is the cost of equipment purchased in the past relevant?
Batch Processing Optimal Design and Scheduling
Ch 3 Manufacturing Models and Metrics
Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
Operations Planning Horizons
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Scheduling.
Part 6 Financing the Enterprise © 2015 McGraw-Hill Education.
Introduction to SuperPro Designer for Batch Processing Modelling
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
PROCESS MODELLING AND SIMULATION Biochemical Case Study
Module 1, Part 3: Process validation Slide 1 of 22 © WHO – EDM – 12/2001 Validation Part 3: Process validation Supplementary Training Modules on Good Manufacturing.
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Creating Report Templates.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Managing Processes and Capabilities CHAPTER THREE.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Break Even Point and Payback Period Course Outline 11.
Simulation Of Bioprocess ERT 315
Contemporary Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014) Batch Processing Modelling (Component Registration)
ERT 320 Bio-Separation Engineering
Simulation Of Bioprocess ERT Modeling and Assessment in Process Development.
Flow Rate and Capacity Analysis
1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.
Process Scheduling, Resource & Inventory Tracking.
Presented by Demetri Petrides INTELLIGEN, INC.
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
ERT 210/4 Process Control & Dynamics
ERT 315/4 SIMULATION OF BIOPROCESS SEM 1 (2010/2011) Modeling & Simulation of Bioprocess: ‘BIOCHEMICAL CASE STUDY’ By; Mrs Hafiza Binti Shukor.
Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
Case study 2. Session outline  A sequential modular approach to solve for a moderate complex flowsheet  Some common unit operations in biochemical industries:
Value Stream Mapping Plus Learning to See Better Know the Laws. Use the Tools. Profit. © Factory Physics, Inc.
PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
Chapter 3: Strategic Capacity Management
Manufacturing Simulation Case Studies
Key Learnings: Little’s Law
IMPLEMENTING LEAN SIX SIGMA IN THE PALESTINE POULTRY COMPANY
Manufacturing Capacity Increase via Cycle Time Reduction
Software project mgt. session # 3– lab manual.
Analytical Tools for Process Analysis and Improvement
Differential Analysis, Product Pricing, and Activity-Based Costing
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Modeling & Simulation of Bioprocess: ‘THROUGHPUT ANALYSIS &
Constraint Management
Manufacturing system design (MSD)
Location-dependent Synthesis of Biorefinery Networks
Biomass-fired combined heat and power for district heating
Chapter 3: Strategic Capacity Management
Chapter 5 Process Analysis.
Chap 11 Learning Objectives
Progress Presentation on: Production Cost Analysis By
Chapter 24 Differential Analysis and Product Pricing Student Version
Batch Processing Optimal Design and Scheduling
GATORADE MX Production
Theory of Constraints Part II: TOC Concepts
Presentation transcript:

ERT 323/2 SIMULATION FOR BIOPROCESS ENGINEERING SEM 2 (2012/2013) Modeling & Simulation of Bioprocess: ‘THROUGHPUT ANALYSIS & DEBOTTLENECKING STRATEGIES’

Student should be able to;  ANALYZE the uncertainty problem that might be happen during the operations.  CLASIFY and ORGANIZE debottlenecking strategies to increase the annual production with low operation cost.

COURSE OUTLINE PART 1: Throughput Analysis Theory PART 2 : Process Debottlenecking Strategies PART 3 : Case Study & Discussion Tongkat Ali extract production Pharmaceutical cream production

PART 1 Throughput Analysis Theory  Types of bottleneck  Batch throughput

TYPES OF BOTTLENECKS Bottlenecks Equipment Resources SizeTime Size Time (utilities, labor, demand for raw materials)

BATCH THROUGHPUT ANALYSIS Annual Throughput = Batch Throughput x Number of Batches per Year  Annual throughput of a batch process: To increase annual throughput Run bottlenecks EQUIPMENT RESOURCE (utilities, labor, demand for raw materials) or Further classification: A) TIME BOTTLENECK - equipment/resource that limits the number of batches per year. B) THROUGHPUT BOTTLENECK -equipment/resource that limits the batch throughput (amount of material processed per batch).  Continuous process will only experience throughput bottlenecks.

THROUGHPUT /SIZE BOTTLENECK Equipment Capacity Utilization = Liquid volume Max liquid volume Equipment Capacity Utilization = Operating throughput Max throughput OR

Batch time = hr Equipment Uptime = Total time equipment is utilized per batch Batch Time (BT) A) TIME BOTTLENECK PCT for P-1 = hr PCT = Procedure Cycle Time (duration spent to complete an entire procedure including all operation in the procedure

 Path: View/Throughput Analysis Charts/ Utilization  Remark: Throughput analysis will only carry out for equipment in rating mode (switch P-1 to rating mode) Throughput Analysis Chart B) THROUGHPUT BOTTLENECK Combined Utilization = Equipment Capacity Utilization x Equipment Uptime

PART 2 Process Debottlenecking Strategies

Debottlenecking strategies  Increase batch throughput until a size bottleneck is reached.  Do the following: Increase number of cycles of limiting procedure Rearrange equipment, or; Use new equipment Annual Throughput Cycle Time Batch Throughput or 8

Debottlenecking Example 1 ‘Tongkat Ali Extract Production’

Tongkat Ali extract production

Pilot Scale Production

Base Case Simulation Debottlenecking question: How to increase production? Spray drying time: 22 hrs Annual production: 323 batches

Throughput analysis Path: View/ Throughput Analysis Charts/ Utilization Highest combined throughput SPRAY DRYER

Operation Gantt chart Path: Tasks/ Gantt Charts/ Operation GC Time bottleneck : SPRAY DRYING (22.44 hrs)

SCHEME 1 : ADD NEW SPRAY DRYER New SPRAY DRYER

SCHEME 1 - Instructions  Delete outlet stream from storage tank  Add a mixer from Splitting/ Bulk Flow/ 2-way  Duplicate a new spray drier. Select spray drier with its associated inlet & outlet streams Press copy icon or Ctrl+C Press copy icon or Ctrl+V  Reconnect stream between storage, splitter & dryers.  Unit procedure configuration: Storage: increase transfer-out flowrate to 0.24 L/min Splitter: 50% distribution to each stream; reschedule start time (start with transfer- out of storage) & duration (follow spray drying duration via Master-and-Slave) Both spray dryers: reduce process time to hrs; reschedule start time of drying & CIP operations in new spray dryer  Save file as “Scheme 1”  Execute the simulation & check answers

AFTER ADD NEW SPRAY DRYER Cycle time: hrs Annual production: 591 batches ERT 315/4 SIMULATION OF BIOPROCESS SEM 1 (2010/2011)

SCHEME 2 NEW EVAPORATOR

SCHEME 2- Instructions  Use “Base Case” file for start  Delete outlet stream from storage tank.  Added a new evaporator from Phase Change/ Multi-Effect Evaporation  Reconnect streams between storage, evaporator & spray dryer; rearrange the procedures of needed  Unit procedures configuration: Storage: increase transfer-out flow rate to 0.24 L/min Evaporator: 50% water & 1% TA powder evaporated; schedule operation to start when transfer-out of storage starts; setup time: 20 min; process time: hrs. Spray dryer:reduce process time to hrs  Save file as “Scheme 2”  Execute the simulation & check answers.

AFTER ADD NEW EVAPORATOR Cycle time: hrs Annual production: 591 batches

SCHEME 3 – SCHEME 1 + SCHEME 2

SCHEME 3- Instructions  Use “Scheme 1” file for a start  Delete outlet stream from storage tank  Add a new evaporator from Phase Change/ Multi-Effect Evaporation  Reconnect streams between storage, evaporator & mixer; rearrange the procedures if needed  Unit procedures configuration: Storage: increase transfer-out flowrate to L/min Evaporator: 50% water & 1% TA powder evaporated; schedule operation to start when transfer-out of storage starts; set-up time: 20 min; process time: 5.71 hrs Splitter: reduce process time to 5.71 hrs Both spray dryers: reduce process time to 5.71 hrs  Save file as “Scheme 3”  Execute the simulation & check answers.

AFTER SCHEME 1 + SCHEME 2 Cycle times: 8 hrs Annual production: 984 batches

SCHEME 4- PACKAGING LINE

SCHEME 4- Instructions Use “Scheme 3” file for a start Delete outlet streams from both spray dryer Add the following unit procedures:  Mixer: Mixing/ Bulk Flow/ 2-stream  Capsule mixing: Mixing/ Bulk Flow/ Custom  Capsuling: Formulation & Packaging/ Tableting (General)  Bottling: Formulation & Packaging/ Boxing  Boxing: Formulation & Packaging/ Boxing Flip the equipment to reverse direction, reconnect the streams & rename the unit procedures New component registration:  Maltodextrin (refer component: soybean flour)  Boxes (refer component: water)  Bottles (refer component: water)

SCHEME 4- Instructions  Set rating mode for the following (right click & select “Equipment Data”):  Capsuling: 50 entities/min for rated throughput  Bottling: 2 entities/min for rated throughput  Boxing: 1 entities/min for rated throughput  Unit procedures configuration:  Mixer: set-up time: 20 min; process time: 6.63 hours; start operation when either of the dryer starts  Capsule mixing: mix-in stream: maltodextrin; Set outlet composition for maltodextrin: 88.89% mass; start operation when mixing starts  Capsuling: Tablet name: TA capsules; Amount per tablet: 0.45 g: Operating throughput: 50 tablets/min; setup time: 10 min; process time: calculated based on throughput; start operation when capsule mixing ends

 Unit procedure configuration (continue): Bottling: boxing capacity: 60 items/box; container line- bottom [bottles (name); bulk amount per entity: 1g; purchase price: $ 0.10]; setup time: 20 min; process time: h; start operation when capsuling starts Boxing: boxing capacity: 12 items/box; container line-bottom [bottles (name); bulk amount per entity: 1g; purchase price: $ 0.13]; setup time: 10 min; process time: 1h; start operation when capsuling starts  Save files as “Scheme 4”  Execute the simulation & check answers. Continue………

ASSIGNMENT Throughput & economic analysis Process parametersBase case Scheme 1 Scheme 2 Scheme 3 Scheme 4 Overall product yield (%) Batch production (kg/batch) Minimum cycle time (hr) Plant batch time (hr) Number of batches per year Annual production (kg/yr) Capital cost ($) Operating cost ($/yr) Total revenues ($/yr) Gross margin (%) Return on investment, ROI (%) Throughput Economics

Debottlenecking Example 2 ‘Pharmaceutical Cream Production’

BASE CASE SIMULATION dayyear Annual Operating Time = 8 hours x 52 weeks x 5 day week = 2080 hours year Challenge: How to increase additional 150% of current production rate?

Throughput Analysis Chart Highest combined throughput

Operation Gantt Chart The longest operation

SCHEME 1- Intermediate Tank

Scheme 1: Throughput analysis Slight increase Slight decrease

Scheme 2- New Blending Tank

Scheme 2- Throughput analysis Further increase Further decrease

SCHEME 3- New Multifunctional Tank + New Filter

Scheme 3 - Throughput analysis Further increase Further decrease Slight decrease

Scheme 4- Schemes 1 + 2

Scheme 4- Throughput analysis Huge increase New bottleneck

Scheme 5- Future expansion

Scheme 5- Throughput analysis Further increase Further decrease

Combined utilisation Equipment Tag Procedure Name Base case Scheme 1 Scheme 2 Scheme 3 Scheme 4 Scheme 5 V-102P-2Jacketed Heater 2 V-101P-1Jacketed Heater 1 V-103P-4Main Blending Tank FL-101P-5Filler BC101P-6Belt Conveyor BX- 101 P-7Manual Cartoning GBX- 101 P-8Shrink Wrapping BX- 102 P-9Manual Pallet Packaging

Process Throughput Economic parametersBase case Scheme 1Scheme 2Scheme 3Scheme 4Scheme 5 Batch production (tube/batch) Plant batch time (hour) Minimum cycle time (hour) Number of batches/ year Annual production (tube/year) Cost of investment ($) Annual operating cost ($) Unit production cost ($/tube) Annual revenue ($) Gross margin Cost benefit ratio (CBR)

CBR = Revenue of alternative - Revenue of current operation Investment cost of alternative + Operating cost of alternative - Operating cost of current operations

Conclusions  Debottlenecking can never ending, it should be stopped when the debottlenecking objective has been meet.  Remember to check the economic performance: Payback time (PBT) Return on investment (ROI) Cost benefit ratio (CBR)