BIMA Antenna Reconstruction. AntennaFarm.V3 antenna assembly lift pedestal onto base (CRANE) lift dish onto pedestal (CRANE) reinstall ladder (FORKLIFT)

Slides:



Advertisements
Similar presentations
© 2014 MAIN STREET LED SIGNS, LLC MINDEN, LA. Yes, modular display components are changing the way we do business. But how? And why is that important.
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Cabling UTP AND FIBER CABLING. Structured Cabling Infrastructure Mounted and permanent Allows patching Comfort that infrastructure is OK Components: Information.
Install L2 Switch Head End CATV
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
TECHNICAL TRAINING 2008.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
FormulaBot is racing car using servo motor as a steering yoke system Formula.
Racks, Bins & Modules PDR Paul Harden 17 June 2002 EVLA Vertex Room ( and other mechanical considerations) This file has been modified from the original.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Wood Construction CTC-375.
LIGO-G W eLigo PSL laser diode room strawman design Rick Savage, Anamaria Effler, Peter King.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CRYOGENICS Stephen Muchovej Caltech.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
Installation of the T600 at Fermilab CSN2, September 22,
TC meeting P2 planning wks 5&6 A.Tauro
COB Integration and Test Nov. 15, 2010 Roy Esplin Mike Watson Monte Frandsen.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
Installation of the T600 at Fermilab Fermilab, February 15,
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Integration of the Spectrometer Solenoid Magnets
Cosmic Microwave Technology, Inc.
Automotive Engines Theory and Servicing
Chapter Objectives In this chapter, you will learn:
Installation of the T600 at Fermilab
Camera Maintenance and Access
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
Mechanical Design Review February 25, 2008 Université de Montréal
Scott Wakely University of Vengeance
New telescope projects
Materials of Energy Car
Radiation-safe area for electronics, or laser or
مقدمة في الاردنيو د فضل الاكوع.
Engine Removal and Replacement
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Tagger Microscope Mounting, Shielding & Cooling
COLUMNS SLIDE SHOW.
STARSHINE on Station Conceptual Configurations
SEQUENCE OF OPERATIONS
Hall C Dump Status Beam Resuscitation Review
Automotive Engines Theory and Servicing
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

BIMA Antenna Reconstruction

AntennaFarm.V3

antenna assembly lift pedestal onto base (CRANE) lift dish onto pedestal (CRANE) reinstall ladder (FORKLIFT) caulk seams, reinstall cabin insulation (MANLIFT) install door, window in base insulate base power and fiber connections through base install new feet on azimuth cable chain test az, el drives and limit switches reinstall TV camera reinstall sun shades on dish and yoke (MANLIFT)

receiver and electronics install, align WVR mirrors on front truss install cal wheel plate, A-frame, tie rods; align axis with subreflector install IF plate replumb lines to water chiller, test install VME, cPCI, pwr supply, etc in rack install a/d mux board on cabin wall test cabin temperature control rewire Elco connectors to subreflector install new fiber cable, splice patch cords on base end reinstall all cables in rcvr cabin

dewar and cryogenics install new adsorber in helium compressor, purge; run compressor on test dewar install compressor on platform (FORKLIFT) check and purge helium lines pump out dewar, lift up to rcvr cabin (FORKLIFT), install on A-frame, cool down install LO plates test computer control of telescope and rcvr TV pointing with frame grabber holography; reset panels as needed