Performance & Supply Chain Programs

Slides:



Advertisements
Similar presentations
specifically designed for Manufacturers and Distributors
Advertisements

Introduction to Web Bill of Lading Q Proprietary and Confidential Copyright © 2005 INTTRA Inc. 2 Agenda Industry Challenges INTTRA Solution Value.
Session 3 – EDI (part 2) – The EDI Process. Stein Mart Requires All Vendors to be EDI compliant Required EDI Documents Purchase Order 860 – Purchase.
WMS – Warehouse Management Systems
Main Menu F3 Exit = Press F3 to exit this screen. Commonly Use Keys: F4 Prompt = Position cursor in front of ‘?’ location and press F4 to display a list.
 A Purchase Request is utilized for a variety of reasons, including, but not limited to: ◦ Items not able to be purchased through Office Max ◦ Conference.
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
Session 5 – Routing and Shipping. 1. Freight Terms, Freight Claims, and Commercial Zone 2. Vendor Regions 3. Shipment, Load, and Mode Definition 4. Determining.
Managing Inbound Freight Costs Loette D. King, CPSM, CPSD.
Session 6 – Business Recovery Charges.  What is a BRC?  What infractions result in incurring a BRC and what are the corresponding charges?  How will.
---Confidential 1 Order Management Training. ---Confidential 2 Introduction Three cycles in Oracle Applications Plan to make. Order to cash Procure to.
Cross-Docking Distribution Center (DC)
Session 3 – EDI (part 1) - Get Connected.  Session 3 – EDI requirements  What is EDI?  Do we have to be EDI Compliant?  What is EDI?  What EDI Documents.
ISupplier Portal September iSupplier Portal Purpose Benefits Login Navigation Viewing Information Advance Shipment Notices Preferences.
E2Open Supplier Training
DCMS DEMO 1. Agenda 2 Inbound Processes Outbound Processes Security Manager Questions & Answers.
Smart Connect – Supplier Portal Training Module 1 – System Overview.
Leveraging JDA technology to support a Shelf Connected Supply Chain Amy Higgins VP, Space Management & Analytics Sears Holdings Corporation 1.
GEORGIA ELECTRONIC CONVICTION PROCESSING SYSTEM 1 Georgia Electronic Conviction Processing System (GECPS)
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
Welcome! User Conference 2011 Presenter: Robert Goldman.
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
SECTION 1 - BOOKING Requirement Timely and Accurate submission of booking information Where APL Logistic Taipei Office Cut-Off Vendor should submit the.
Test Materials Aids/Tools Available Distribution Model Additional Orders.
Copyright 2013 GHSP | A JSJ Company 2 SUPPLIER TRAINING – Advance Shipping Notice (ASN) Guidelines Discover, Align, Deliver. Worry Free. GHSP.
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
Vendor Score Card coming soon … Metrics…  Ship on Time – Based on P.O. ship window  Fill Rate – Ship Complete  Quality Assurance  EDI Compliance, ASN.
1 of 26 ECOM Users Group - EDI October 18, of 26 Agenda Introductions –Sarah Knowles Supply Chain Purchase Order Carton Consolidation (POCC) Closing.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
© 2015 Universal Service Administrative Company. All rights reserved. Direct BEAR Payment Process E-rate Program Applicant Training Washington DC Tampa.
1 Package Marking, Packing List and Invoice Data Requirements for EB Receiving & Invoicing Approved for Public Release.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
Barcodes and MDS Easy ways to speed up and increase accuracy using barcodes in MDS Monday June 14, 2010.
Mod6 - Shipping Presenter’s Name Presenter’s Title.
Budget Basics for Managers. Purchasing Requisition-A request to purchase goods or services. PO-Approval to purchase goods or services on behalf of the.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
Exhibitor Education Webinar: Shipping & Handling Tips.
Supplier Up to Schedule Plan  Supplier receives releases from Lear on a weekly basis via EDI or Fax.  If the supplier does not receive a release on a.
Oracle iSupplier Portal Product Presentation
ENTERPRISE DATA QUALITY (EDQ) – Vendor Portal EDQ Vendor Portal is an on-line web application hosted on the vendor extranet. The EDQ Vendor Portal enables.
Packaging and Distribution Presentation Module 1 Participation Counts and PEMSolutions Reports.
Toys R Us Drop-Ship Performance Programs Discussion Document 1.
Federal Acquisition Service U.S. General Services Administration TransPort Integrator The Solution Moving Forward August 14, 2013.
ASN Error Notifications Published by Vendor Operations Discussion Document.
oracle apps order management training
SchoolSuccess for Coordinators
Part Approval / Compliance Data Submission via Jotform.com
Customer Return Management Scenario Overview
Toys R Us Drop-Ship Performance Programs
Welcome to Stein Mart New Vendor Orientation
DOMESTIC SUPPLY CHAIN PROGRAMS Reference Sheet
INTERPRETINING DEDUCTIONS ON INVOICES
Delivery Performance System DPS
5th Edition.
Delivery Performance System DPS
Import Vendor Reference Guide
DrayWatch Training November 2009.
Texas Instruments Supplier Portal- Web Invoice Overview
Jessica Dare, Principal Consultant
SM KM Consignment Model
Part Approval / Compliance Data Submission via Jotform.com
Orders & Shipment Tracking
Drop Ship- Compliance Reporting
Smart Connect – Supplier Portal Training
STANDARD ACCOUNT: SOLUTION QUICK GUIDE
Partner Portal Training document
Supplier EDI On-boarding Overview
Presentation transcript:

Performance & Supply Chain Programs Published by Vendor Operations Discussion Document

Toys R Us Compliance Programs The following presentation will review the various Supply Chain measurements in place, and provide detailed instruction on how to succeed when interacting within the Toys R Us Supply Chain. These programs are designed to help ensure products are shipped on time, and can be accurately received into our DCs or stores. Should non-compliance occur, infractions will generate.

Agenda Purpose: To Review the various Supply Chain Compliance Programs currently implemented by Toys R Us to set up Vendors for success. Topics Covered: (DPS)- Delivery Performance System Infractions ASN GS1-128 Routing Appointment & Appointment Scheduling ETA and Delivery UPC compliance Item Goal: To help our Vendor community understand the various supply chain expectations when interacting within the Toys R Us.

What is DPS The Delivery Performance System (DPS) is a web-based application enabling on-line monitoring of vendor supply chain performance, compliance, and appeal management.  This system provides visibility to instances of supply chain non compliance. Instances of non-compliance are referred to as “infractions” For further details about DPS please see the “DPS Navigation” presentation.

What is an ASN? An ASN (Advanced Ship Notice), is an Electronic Data Interchage (EDI) document that supports our receiving team when bringing in goods, and is transmitted prior to the goods arriving in our warehouse. Operationally, this document provides receipt visibility to the distribution center, and assists in the efficiency of moving product throughout TRU DC’s and stores. Without a proper, error free ASN, the Toys R’ Us receipt process is negatively impacted, leading to a delays in the goods being received as well as getting to our stores.

Reasons how an ASN can be Non Compliant No ASN for DC Receipt- TRU did not receive an ASN related to the PO in question. Late ASN for DC Receipt- Any ASN received after goods received in DC will be considered late. ASN Variance- Generates when there is a variance between what is entered on the ASN and what is received within the DC.

Best Practices for Transmitting an ASN Make sure an error free ASN is transmitted and acknowledged via 997 Functional Acknowledgement before goods are received within DC. If an ASN generates errors, be sure to resend ASN in its entirety (using the same ASN ID), before goods are received in TRU warehouse. Make sure all ASNs are transmitted within a timely manner. Make sure ASN represents EXACTLY what is being shipped to TRU.

GS1-128 Labeling When shipping goods, Toys “R” Us requires both master carton marking along with proper shipping labels. Toys”R”Us utilizes label formatting consistent with the GS1 US Common Label for shipments delivered within the United States. These labels provide valuable information such as: Item number, UPC, ship-from, ship-to details, that helps to track individual cartons from the beginning to the end of our supply chain. These labels are utilized during our receiving process, and speed the flow of goods through our network. For further details refer to section 12.7 of the Domestic Vendors Guide Located on the Vendor Extranet .

GS1-128 Carton ID (Example)

GS1-128 Labeling Expectations ALL individualized cartons that are being sent domestically to TRU warehouses must contain a unique GS1-128 carton ID and label. Labels must be affixed in the proper location For further details regarding label placement please refer to section 12.7.1 of the Domestic Vendors Guide Located on the Vendor Extranet .

Best Practices for GS1-128 Labeling Make sure that all cartons are represented on the ASN, and are represented with a unique GS1 carton ID. Ensure prior to shipping that each carton is affixed with GS1-128 carton ID. For more information on GS1-128 expectations, please go to section 11.6 of the Domestic Vendors guide.

Routing Only Collect Vendors are required to request for routing. Routing is submitted through the Freight Order Management System (FOM). To gain access to FOM, please reach out to RRES@toysrus.com

Why Measure Collect Vendor’s for Routing Proper routing within Freight Order Management (FOM) helps Toys R Us to plan the exact amount of space that will be needed to store and transport goods, and can be used to maximize available equipment. Collect orders may be combined with other PO’s, and therefore it is critical that space within our trucks is accurately accounted for.

Routing Compliance Expectations Routing must be submitted more than 3 FULL business days before the start ship date of PO. Cartons that are routed through FOM must be fully representative of what is sent on ASN, and what will be received by the Toys R Us warehouse.

When should I submit for routing? A routing submission in FOM must occur more than 3 full business (Saturday & Sunday are not considered business days) days prior to the start of the PO Ship Window. Routing within the 3rd day is not considered compliant.

Best Practices when Routing Make sure that each shipment is accurately routed within FOM within the three full business day rule. DO NOT Route within the third day as this is not compliant. Please ensure, when routing, that all cartons being represented are available, and there will be no variances in what is actually received. No PO changes should occur after routing has been committed within FOM. Communicate with RRES of any routing related issues

Appointment Scheduling Only Pre-Paid Vendors are required to request appointments. Appointments are requested through LEAN. For access to LEAN, please reach out to leanlogistics@toysrus.com

Why measure Pre-paid Vendors for Appts? Toys R’ Us depends on Pre-paid vendors to make timely, accurate appointments to ship goods to our DCs, in order to streamline the amount of trucks coming into and leaving our DC’s. Appointments help to control space and labor, and plan out exact schedules for our DC docks.

How is an Appointment Non Compliant Late Appointment show- Carrier is required to arrive on, or up to one hour prior, to requested appointment time. No Appointment Show- Carrier does not show up for requested appointment, or reschedule occurs within 8 hours of drop-off. **All appointments are expected to be made by Tuesday of the ETA week.

Appointment Compliance (Timeline) NOTE- All appointments expected to be made by Tuesday of the ETA week.

Best Practices for Appointments & Scheduling Make sure all appointments are scheduled by Tuesday of PO ETA week. Ensure carrier arrives on time or up to an hr. prior for each appointment, and checks in with guard booth in timely fashion. Insist carrier receives TRU approved time stamp upon arrival. Communicate with the LEAN Logistics team of any appointment related issues (weather, application access etc.)

ETA & Delivery Programs ETA Performance is measured in two ways: Fill Rate Compliance- The variance between what represented on the current PO and what has actually been received. Delivery Compliance- Individual milestones that have to be met within the supply chain process to ensure product arrives at the DC during the necessary timeframe.

ETA Measurements for Collect Vendors Fill Rate- What is received in DC vs. what is represented on the current PO. Late Ship Window- Carrier picks up outside of ship window, as laid out on the PO. Late Routing Request- Routing is submitted within 3 full business days of the start of the ship window.

ETA Measurements for Pre-Paid Vendors Fill Rate- What is received in DC vs. what is represented on the current PO. Late Appointment Request- Appointment must be scheduled by Tuesday of ETA week. Late Appointment show- Carrier is required to arrive on, or up to one hour prior, to requested appointment time. No Appointment Show- Carrier does not show up for requested appointment, or reschedule occurs within 8 hours of drop-off.

Best Practices for ETA Compliance Ensure understanding of procedures prior to the shipment of product. If a collect shipper, make sure any late pickups are reported to RRES@toysrus.com Vendor is responsible for notifying the carrier of issues with pickup. If a prepaid shipper, make sure all appointment times are adhered to. If any need to be rescheduled, put in the reschedule at least 8 hours prior to appointment time. If you have problems with making proper appointments, please reach out to LEANlogistics@Toysrus.com

UPC Not on File Program The UPC enables Toys “R” Us to accurately track inventory, attribute sales appropriately, maintain in-stocks, and delight our guests with a prompt, reliable service.   The omission, or inaccuracy, of this critical piece of information can lead to downstream disruptions that negatively impact POS integrity, product availability, and the customer experience UPC non-compliance is identified by our stores, and communicated through e-mail notifications. UPC infractions cannot be viewed in the Delivery Performance System.

Preventing UPC Not on File Non Compliance Make sure all, active, sellable UPCS have been identified and approved within EDQ. Ensure you are set to receive UPC Compliance newsletters under your vendor user subscriptions. For more information regarding subscriptions, please reference Section 9.1 of the Domestic Vendor Guide. UPC infractions are not visible within DPS, so make sure to appeal any infractions thought to be invalid, in an email to vendorcompliance@toysrus.com

New Item Initiation Program Each new item that is added into our assortment will receive an administration fee. This fee is utilized towards item maintenance in our systems. It will be automatically generated and assessed on your next invoice.

Item Verification Programs As part of the new item initiation, one full production master case pack sample must be sent to one of our verification centers. This case pack must arrive at LEAST 48 hours prior to product being received in our DC. Failure to send items for verification will result in an unverified item violation. For more detailed information, please refer to Section 3.1.2 of the Domestic Vendor Guide on the Vendor Extranet.

Item Variance This program ensures data integrity of all item/carton attributes input upon item setup in EDQ. Verification must occur prior to product being introduced into our Supply Chain. A tolerance threshold is utilized to accommodate for minor discrepancies. For more detailed information, please refer to Section 11.8 of the Domestic Vendor Guide on the Vendor Extranet.

Best Practices for Initiating New Items Ensure all, active, sellable UPCS have been identified and approved within EDQ. Continuously manage your item master report which can be viewed through Green Lion Digital. Do not release product into the Toys R Us supply chain prior to verification. Allow enough time for the verification process to be completed to avoid potential for any variances.

Communication The Vendor Operations team is here to support Toys R Us vendors and encourages every Vendor to work closely with the Toys R Us Planning and Logistics team. Please be sure to view all of our available trainings in the Vendor University section of the Vendor Extranet ADD HYPERLINK