Workshop: Work Completion Process May 16, 2006. Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.

Slides:



Advertisements
Similar presentations
International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Advertisements

Workshop: Preventive Maintenance
Welcome to QuadraNet Systems.
What is New in Inventory & Purchasing? Presented by: Derek Kratz.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
1 Welcome To Siebel Training Welcome To Siebel Training.
Workshop: Maintenance Work Requests May 3, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Scheduling Requests and Request Reports Presented by: Sara Sayasane Presented by:
FASET Refresher Welcome to the FASET Refresher course. The following screenshots will take you through the basic FASET Demo. Because this is a slide show,
Track, View, Manage and Report on all aspects of the Recruitment Process… with ease!
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Accounts Receivable Presented by: Robert Myers Presented by: Robert Myers.
Workshop: PM Structure April 26, Agenda  Introductions  Project Overview  Plant Maintenance Project Timeline  Future Blueprinting Sessions 
SAP Preventive Maintenance An Overview
MATERIALS STAGING AND TRACKING Session 3605 Gary Zien Bayer Corporation Pittsburgh PA.
Enrollment Manager Presented By: Shaun McAnulty. ENROLLMENT MANAGER  Came about as an Enhancement request, users wanted a single location to track and.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP Preventive Maintenance An Overview
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Walk-In Scheduling Presented by: Sara Sayasane Presented by: Sara Sayasane.
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
© 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Career Education Computers in the Medical Office Chapter 3: Introduction to.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Workshop: Measurement Points and Permits
Session 8-1 Session 8 The Power and Flexibility of EDExpress.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
Lorie Stolarchuk Learning Technology Trainer 1 What has changed with the 2.7.X Upgrade to CLEW?
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
1 The following presentation is from the Oracle Webcast “What’s New in P6 EPPM Release 8.1.” As a partner, you may not use the Oracle Power Point template,
Introduction to the WebBoard Terry Dennis. The WebBoard - Our Connection The WebBoard URL is
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Mass Assigning Student Data Mass Assigning Student Data Presented by: Halie Paglio.
Session #23 Hands On NSLDS for Beginners Valerie Sherrer & Andrea Wise.
1 Command Field: Use this field to go to transactions directly by entering the transaction code. The transaction codes can be found either in the SAP Easy.
Copyright © 2006, Infinite Campus, Inc. All rights reserved. Year End Processing.
1 TEISS Case Project Introduction Melinda Ronca-Battista and Angelique Luedeker ITEP/TAMS Center.
Custom Report Builder For Learning Solutions February, 2014.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Session Session 15 FAFSA on the Web - Onward and Upward!
1 AARP Tax-Aide Prospective Volunteer Recruitment System Leadership Reports and VMIS Functionality 11/4/09.
Introduction to EBSCOhost Tutorial support.ebsco.com.
NSLDS on the Web Jim Yoder & Andrea Wise Session 3.
Integrated Enterprise System 11/1/11Create travel expense TRIP - SAP GUI ECC 6.03 vers SAP TRIP Transaction Creating a Travel Expense Report (TER)
FAA Access to CPS Online for EDExpress Users - Hands-on Ginger Klock Eric Smith Session 5.
XA Advanced Development with Extender and Enterprise Integrator: RPG is so 1980s… Denise Luther Senior Technical Consultant 704.
FAA Access to CPS Online and the ISIR Datamart Ginger Klock Eric Smith Session 49.
Workshop: Timekeeping June 13, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow.
Page 1 Orchard Harvest ™ LIS Training Order Patient Samples.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
© Copyright Enstrapp IT Solutions Introduction Barcode Scanning Capture & Attach images Long Text Management Offline Processing User Transaction.
 Tata Consultancy Services 1 Financial Information.
1 FAA Access to CPS Online Hands-on Nina Colon Eric Smith Session 5.
ULTIPRO RECRUITMENT: LISTS Prepared by Ordette Allen.
Payroll Allocations Information Session 2 nd February 2016 Heidi Woolf Solution Architect Finance Business Solutions Joanna Woo Business Analyst Large.
PantherSoft Financials Smart Internal Billing
Standard Operating Procedure
Data-Basics Training & Support
Kyle Erwin Manager, Development Engineering
APPROVING A REQUISITION
Workshop: Materials Use
MM03 - Master Data in Purchasing & Contract
Tutorial Introduction to support.ebsco.com.
HEATING, COOLING & WATER HEATING PRODUCTS
DPI Vehicle Fleet Management DR-21
Reliance Supplier Corrective Action Process
Two methods to observe tutorial
Two methods to observe tutorial
Workshop: High Level Reporting
Workshop: Equipment June 29, 2006.
Tutorial Introduction to help.ebsco.com.
Presentation transcript:

Workshop: Work Completion Process May 16, 2006

Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Accommodate the use of GIS with SAP Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and equipment Utilize standard SAP functionality to collect utility usage and cost information for recharge calculations

Agenda  Introduction  Discussion of Work Completion Process  Preview of Next Blueprinting Session  Other Discussion

What is the SAP Work Completion Process? Work Orders are “Technically Completed” Notifications are closed with technical findings recorded Notes may be recorded via an order confirmation

How is an order “Technically Completed”? Orders are usually Technically Completed (TECO) from a list:

How is an order “Technically Completed”? One or more orders are selected:

How is an order “Technically Completed”? The “checkered flag” icon is selected:

How is an order “Technically Completed”? SAP offers to complete the notifications at the same time. Since we are going to record technical results with the notification, “Complete Orders” is selected.

How is an order “Technically Completed”? SAP indicates which orders were processed with the check mark. If the “Refresh” icon is selected, these orders will drop from the list.

How is an order “Technically Completed”?

How is a notification closed? A list is used to select the notifications which are in process:

How is a notification closed? A list of notifications in process is displayed:

How is a notification closed? A notification is chosen for processing:

How is a notification closed? A code may be entered and the “Checkered Flag” icon selected:

How is a notification closed? The date and time of completion are entered:

How is a notification closed? The processed notification is indicated by the check mark:

How is a notification closed? The display is refreshed and the notification is no longer listed:

How is are comments attached to a Work Order? The order confirmation transaction is used for this:

How is are comments attached to a Work Order? The top portion of this screen is for time entry when CATS is not used. The text is entered in the “Confirm Text” field. Long text may be used.

Topics For Next Blueprinting Session  Determine Material Management Requirements Reservations from Orders Requisitions from Orders Goods Issues to Reservations Unplanned Goods Issues Material Availability Display

The “Homework” List  -Fill in the floor number (if you know it) for the spreadsheet with "Unknown" floor.  -Develop a priority list (or lists) by notification type or order type for your area  -Determine which fields should be eliminated or required on the notification screens  -Develop a list of Damage, Cause of Damage, and Activity codes  -Determine if additional (or fewer) order types are required for your area  -Determine a list of "Maintenance Activity Types" for your area and decide which order types should have which Maintenance Activity Types  -Determine a list of "User Statuses" by Order Type for your area.  (Different order types may have different statuses.)  -Determine the criteria for the "Object Info Box" to pop up for repeated work on a room or equipment.  -Determine which fields should be eliminated or required on the order screens