AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.

Slides:



Advertisements
Similar presentations
AT Equ. Groups / AB-CO Control responsibility Sharing.
Advertisements

TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
AB-CO review Support for Cryogenics. Philippe Gayet AB/CO IS CERN, 20/09/05 Outline Scope Hardware Type, Responsibility sharing, Status Basic software.
Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
FAIR Accelerator Controls Strategy
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
AT Measurement Systems
15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES.
L. Arnaudon BE/RF/CS. Outline  RF systems description  Software environment  RF specialist requirements  RADE tools in use  ACS application  Low.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
The MA section of AB/CO FirstEvent Welcome ! RADE Information Event Adriaan Rijllart (AB/CO) 2 Outline 10:00 The context 10:15 Introduction to RADE 10:35.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
1 / 29 Laurent Deniau CERN – AT – MTM 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
Vacuum Controls Quality Management
R. Denz, A. Gomez Alonso, AT-MEL-PM
11 T Dipole Integration & Plans M. Karppinen
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
Magnet Safety System for NA61/Shine
EN-ICE Technical Committee SM18 activities & projects
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Control System Summary of Changes Since PDR
Review of hardware commissioning
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support to LHC optics Support needed for these 3 projects  Database activities  Scada & PLC’s  Tests & measurement (Labview) !! Does not Include !! Magnet protection [R. Denz, A. Gomez, MEL] Cryogenics for LHC [L. Serio, J. Casas, ACR] AT Measurement Systems - Outline

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 2 Project : to Maintain for LHC Completion Scope   Measurement benches for production and assembly of magnets at manufacturer's : DIMM, QIMM, Corrector Benches at CERN : their reference benches, ACMole   SM18 and Block 4 test stations for the magnet series tests Electrical tests and Power 1.9 K Magnetic measurement systems Schedule   End of production in factories : from Nov. 05 (BNN) to Dec ( + Spare Ansaldo MB’s in 2007 ?)   End of SM18 series tests (including spares) : April 2007

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 3 Scope   PS & SPS magnet measurement after repair or modification   Winding, collaring, welding machines developped by MB, SSS manufacturers, CERN property. need : make new magnet assemblies from spare pieces. => to install operate and maintain at CERN   SM18 will test “repaired” magnet assemblies Schedule   SM18 & Block 4 : replace PCVue by PVSS, S5 by S7 (according to Unicos ?) September 2007   SM18 "simplified & according to L.T. standard" Begin 2008   Maintenance of all systems involved (Power, Magn. Meas.)End of LHC Project : Magnet Rescue ActivitiesMAR

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 4 Scope   Field Description for the LHCFIDEL   Fast Measurement Equipment (3 to 10 Hz)FAME Schedule   FIDEL 1st version to completefor start-up with beams Sept   FAME in non-automatic mode"""""   Increase throughput of cycle (old “RMS”) Later, according to needs [cycle = request for beam, measurement with FAME, modify FIDEL] Project : Support to LHC optics

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 5 For LHC Completion : maintain, upgrade to Oracle v10   Rawdata from "LabView Sun" for Magnetic Measurement   Reference tables (MEB then MAD, AB-OP)   Rawdata for power tests : quenches, H.V tests, etc,...   Hardware Recognition to maintain + develop : configuration files for tests of the MS-DS SSS Urgent SM18 for Magnet Rescue Activities [MAR] & Field Description [FIDEL]   Reconfigure the relevant applications/DBases [small work] Going from 15 Tests/week to 1 + test per month : automatic configuration systems will be downgraded to be more robust (if needed). Support to LHC optics : FIDEL   With hypothesis of 1 month for a cycle : AT-MTM concerned   with faster throughput : presently not a priority DataBases Linked to On-Line systems

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 6 Maintain, for LHC completion, SM18 & Block4 on PCVue   Block 4 : does not evolve much. All PLC's are on S5   SM18 : developped by ACR & maintained with help of AB-OP ! same person ! Web tools to control the test stations   Now most handled by AB-OP & Indian Collaborators.   Much simpler needs after April 2007 (AT-MTM will cover ?) INDUSTRIAL SUPERVISION & PLC'S LINKED (1)

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 7 Going from PCVue to PVSS (from mid-2007 ?)   Block 4 : from PCVue to PVSS : 100 analog+ 100 digital I/O (mainly for cryogenic control) from S5 to S7 : PLC for I/O to PCVue : ongoing (AB-CO) + 10 local PLC's (AT-MTM)   SM18: Cryo of the benches from AT-ACR (AB-OP) to AB-CO when moving to PVSS (PLC's already S7) INDUSTRIAL SUPERVISION & PLC'S LINKED (2)

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 8 Manufacturing Tools for MAR (Winding, collaring, welding machines to install, operate and maintain at CERN)   Documentation exists : most are PLC’s based   Help to commission at CERN : SSS for end 2007 MB : mid 2008 ? INDUSTRIAL SUPERVISION & PLC'S LINKED (3)

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 9 Maintain, for LHC completion, Power & Electrical tests File Server for Quenches, etc (  Post Mortem system for LHC) Labview Applications   Tema : Application to automatise sequence and data storage from all systems   Analysis & On-line control/acquisition AQA, H.V. Tests, Loss, Hardware recognition, MRM (=DB associated to series tests) PLC's linked to LabView Sun systems in SM18 PLCSE & PLCCU : S5 PLC for Interlocks and Controls of power tests, partially linked to the Cryo PLC's Maintain / Upgrade Magnetic Measurement Systems   MMP5 to MMP6 for Resistive Magnets (PS, SPS)(ongoing)   Maintain MMP6 in SM18 & Block 4 (Hardware & software) LABVIEW - SUN SYSTEMS (1)

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 10 Reconfigure SMTP for Magnet Rescue (mid 2007)   Power & electrical tests : Going from 15 tests/week to 1 (more ?) test per month : get rid of complexities no more justified. Minimum to keep : AQA, H.V., Loss PLCSE & PLCCU : S5 to S7 Downgrade Hardware Recognition and MRM Magnetic Measurement Systems follow evolution as requested (all activities concerned) LABVIEW - SUN SYSTEMS (2)

AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 11 Support to LHC optics : Fast Measurement Equipment [FAME]   Fast Integrator in PXI (for rotating coil measurement) AT-MTM develops prototypes of "Intelligent module“ (with help from Unisannio, Italy)   Systems needed for LHC (Reference magnets in SM18) On-line Hall plate acquisition : prototype developped (MTM), to integrate by AB-CO (started : 3 man*month) On-line rotating coil acquisition : prototype to develop (MTM) then to integrate by AB-CO (1 to 2 man*year) LABVIEW - SUN SYSTEMS (3)