R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.

Slides:



Advertisements
Similar presentations
LSC - 28 February M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: v.1.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Barriere O, Le Roux P
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Overview of the LHC Year End Technical Stop
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Linac4-PSB 160 MeV connection readiness review
Update on the Critical Path of the PS Booster Schedule for the EYETS
Equipment simplified model SMR UR safety
Installation of an Instrument on a CERN machine
Julie Coupard Schedule and Coordination
LHC Civil Engineering Activities for YETS – LS2
Update on the Ethernet Network Installation Campaign
SPS activities during LS2 TE-EPC (Power Converter Group)
TE-MSC activities in SPS during YETS
East Hall under construction
K. Foraz on behalf of OSS members
Review of UJ56 relocation options
Collimator Control (SEUs & R2E Outlook)
East Hall under construction
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27 th June 2014

A. L. Perrot, EN-MEF/LE2 2 Points 1 & 4 Michael Jeckel (EN/MEF) Point 5 Bertrand Lefort (BE/OP) Point 7 Oscar Andujar (BE/OP) Point 8 Bettina Mikulec (BE/OP) Planning & General coordination (deputy) Maria Barberan Marin (EN/MEF) The R2E coordination team General coordination Anne Laure Perrot (EN/MEF)

A. L. Perrot, EN-MEF/LE3 Contents  Advancement status of the R2E activities in points 1, 4, 5 & 7  Safety  Summary

A. L. Perrot, EN-MEF/LE4 Main critical areas UJ76 UJ14/16 RR13/17 UJ56 RR53/57 US85 UX45 US85 completed 13 rd Dec. 2013

A. L. Perrot, EN-MEF/LE5 Mitigation activities – general  Phase I: dismantling  Phase III: equipment relocation / installation (equipment owners, EN/HE)  Phase IV: equipment commissioning (equipment owners, GS/ASE, EN/EL, EN/CV, IT/CS) - equipment removal/storage (equipment owners, EN/HE), - services removal (mainly EN/EL, EN/CV) - civil engineering (GS/SE)  Phase II: infrastructures - civil engineering (GS/SE) - services installation (mainly EN/EL, EN/CV, IT/CS) In progress

A. L. Perrot, EN-MEF/LE6 Point 1 – advancement status Point 1 completed UJ14 UJ16 Water Cooled Cables (WCCs) installation WCC installation Commissioning QPS, current lead heaters, collimators, WCCs tests and power converters commissioning (change of one WCC) WCC tests and power converters commissioning Short Circuit Tests (SCTs) WCC orientation and then tests Short Circuit Tests (SCTs) WCC orientation and then tests April June May end June Shielding activities (reinstallation, painting) PAD/MAD reinstallation Today Completed with 2 weeks advance vs baseline Courtesy M. Barberan EN-MEF survey in all areas

A. L. Perrot, EN-MEF/LE7 Today - UL16 Point 1 – photos Before LS1 - UJ16 Today - PAD/MAD in UL16 Today – UJ16 Courtesy M. Jeckel

A. L. Perrot, EN-MEF/LE8 Point 1 – photos Before LS1 – UL16Today – UL16 Today – RR13 cast iron shielding wall Courtesy M. Jeckel Before LS1 – RR13 concrete shielding wall

A. L. Perrot, EN-MEF/LE9  First constraint: completion of the QURCA/B for flushing in adjacent sectors scheduled beginning of July (baseline)  Second constraint: cryogenics special cable delivery  Third constraint: manpower availability for cabling campaign (327 cables) Window of 15 weeks for cable campaign Parallel interventions of TE/CRG and EN/EL Point 4 – advancement status  Main constraints towards completion  Start of the relocation activities in January 2014 Start cabling campaign not before March

A. L. Perrot, EN-MEF/LE10 Point 4 – advancement status Today TE/CRG: RF reconnection activities postponed by 2 weeks due to priority for CD activities EN/MEF: Final survey scan End: 11 st July with 1 week delay vs baseline TE/CRG: AMB-MECOS commissioning to be finalised in nominal cryogenic operation condition (week 34 and weeks in accordance with the LHC general planning) no impact on other LHC activities cables campaign: 3 ½ months Point 4 End foreseen in 2 weeks Courtesy M. Barberan

A. L. Perrot, EN-MEF/LE11 Point 4 – photos Before LS1 – UX451 Today – US45 PAD relocated from US451 Today– UX451 Courtesy M. Jeckel

A. L. Perrot, EN-MEF/LE12 Point 4 – photos Before LS1 – ULs 46 Today– ULs 46 Courtesy M. Jeckel

13 Point 5 – advancement status Today EN/EL cables campaign (started in December 2013) EN/CV activities for Safe room technical issues/complexity, material delivery => delay cables corrective actions WCC & power converters installation EN/CV activities UTAs and control cabinet in UL557 Safe room activities Commissioning activities by equipment owners GS/ASE - Fire detection relocation EN/HE shielding activities EN-MEF survey in all areas Courtesy M. Barberan

14 UL557- Safe room UL557- chilled water pipes UL558 – structure for AHUs (safe room) UL557- EYC R2E project Schedule for LS1 Cool-down S56 Point 5 – advancement status Today Forseen end: 1rst August Safe room CV activities Commissioning activities Short Circuit Tests under LHC general coordination on critical path Point 5 End foreseen in 5 weeks Courtesy M. Barberan

A. L. Perrot, EN-MEF/LE15 Point 5 – photos Today– UJ561 Today– UP56 Today– UP56& UL558Today– UL558 Courtesy R. Bihery, B. Lefort

A. L. Perrot, EN-MEF/LE16 Point 5 – photos Today– UL557 Courtesy R. Bihery, B. Lefort

A. L. Perrot, EN-MEF/LE17 Point 5 – photos Today– UJ561 Today– UL56 Today– RRs new shielding wall (cast iron) Courtesy R. Bihery, B. Lefort

18 Point 7 – advancement status EN/EL cables campaign (started in November 2013) cables corrective actions EN/EL optical fibers IT/CS Ethernet installation EN/CV activities (UTAs, control cabinets) TE/CRG activities (t.b. completed to start CD) TE/VSC activities (part t be completed to start CD) Commissioning by equipment owners TE/EPC power converters installation TE/EPC, TE/MPE power converters, WIC commissioning Courtesy M. Barberan Today = baseline end

A. L. Perrot, EN-MEF/LE19 CSCM tests NO ACCESS Point 7 – advancement status Power converters commissioning & warm magnets tests under LHC general coordination Today = baseline end Forseen end: 25th July False floor installation in UJ76 level 1 (procurement issues) Point 7 End foreseen in 4 weeks  BE/BI- BLM Fast BLMB: relocated beginning of June Fast BLMED: new readout system ordered in June; installation in October- November; commissioning afterwards. not included in the interlock system Courtesy M. Barberan

A. L. Perrot, EN-MEF/LE20 Point 7 – Photos TZ76 before LS1 and after 235 m wall demolition & 534 m ducts dismantling UJ76 level 1 before LS1 and today Courtesy O. Andujar

A. L. Perrot, EN-MEF/LE21 Point 7 – Photos Courtesy O. Andujar TZ76 level 1 before LS1 and today

A. L. Perrot, EN-MEF/LE22 Advancement status - summary Very efficient preparatory works by all groups Point Baseline Duration [weeks] Actual / foreseen end date Delay (D) Advance (A) vs baseline end date [weeks] /06/2014 A:2 Effective Duration [weeks] =28 11/07/2014 D: /08/2014 A: = 63 27/06/2014 D: =49 13/12/2014 D:6.5 Comments week delay due to French holidays; 1 week ELQA delay, 3 weeks CSCM tests (no access), 1 week delay false floor and postpone of PC commissioning 2 weeks delay due to additional cables request, 4 weeks delay linked to change of priority by EN/CV 2 weeks delay linked to change of priority by TE/CRG Very good match between the estimated durations and the effective durations of R2E activities in situ during LS1

A. L. Perrot, EN-MEF/LE23 Safety Inspection typePoint 1Point 4Point 5Point 7 Electrical security Done on 03-04/06/2014 Inspector= J-P Julien Done on 24-25/06 Inspector= J. P. Julien To be scheduled begining of July Inspector= t.b.c. To be scheduled after the CSCM (21rst July?) Inspector= t.b.c. General security Scheduled on 26/06/2014 Inspector = T. Gilles Scheduled on 29/07/2014 Inspector= G. Fontana To be scheduled in July Inspector= M. Renard To be scheduled after the CSCM (21st July?) Inspector= M. Renard  No safety problem during the R2E activities  Safety inspections:  Safe room point 5: performance tests mid July

A. L. Perrot, EN-MEF/LE24 Safety – point 5  Safe room implementation (ECR/ edms: )  Safe room performance tests by EN/CV scheduled on weeks  Filling the holes (services areas / tunnel and machine / CMS) under the supervision of C. Gaignant & S. Grillot R2E provided list /images of holes/ducts performed within the project

A. L. Perrot, EN-MEF/LE25 R2E Mitigation activities - summary UJ76 UJ14/16 RR13/17 UJ56 RR53/57 US85 UX45 US85 UJ14/16 RR13/17 UJ76 UJ56 RR53/57 UX45 completed Still 1 week work towards completion Still 2 weeks work towards completion Still 5 weeks work towards completion Safe room by EN/CV on critical path

A. L. Perrot, EN-MEF/LE26 R2E Mitigation activities - summary  R2E activities are within schedule  Safe room implementation at point 5 is very challenging (CV activities are on critical path)  Very good preparation (started in 2010) and efficient work of all groups during the LS1 allow to stay within schedule Many thanks to all the groups  Last but not least => safety inspections to be scheduled and carried out by HSE colleagues  Continuous follow-up, weekly Friday’s meetings (#103), carefull preparation/planning and contribution of all teams were crucial for the success  Testing & commissioning: in progress; for the moment only few minors problems detected