The Clock Distribution inside the CTA Camera Axel Kretzschmann, DESY Zeuthen, 11-2011.

Slides:



Advertisements
Similar presentations
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
Advertisements

XFEL C+C HARDWARE : REQUIREMENTS 1) To receive, process and store Timing Signals from TR ( Timing Receiver ) in same crate : - 5 MHz Bunch CLOCK - Bunch.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 22 October 2009 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, MANNHEIM 02 July 2009 Martin Postranecky, Matt Warren, Matthew Wing.
J. Jones (Imperial College London), Alt. GCT Mini-Meeting GCT Source Card.
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Super Fast Camera System Performed by: Tokman Niv Levenbroun Guy Supervised by: Leonid Boudniak.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Low Cost TDC Using FPGA Logic Cell Delay Jinyuan Wu, Z. Shi For CKM Collaboration Jan
Spring semester (4/2009) High Speed Signal Processing Board Design By: Nir Malka, Lior Rom Instructor: Mike Sumszyk הטכניון - מכון טכנולוגי לישראל הפקולטה.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Clock Distribution for IceCube June 8, 2004 Lawerence Berkeley National Laboratory Gerald Przybylski GTPrzybylski LBNL 10/13/2003.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Pinewood Derby Timing System Using a Line-Scan Camera Rob Ostrye Class of 2006 Prof. Rudko.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Chicago Meeting, /8/2015K.-H. Sulanke, DESY1 Digital Camera Trigger Status May 2013 K.-H. Sulanke DESY.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Nectar F2F, Barcelona /8/2015K.-H. Sulanke, DESY1 Digital Camera Trigger Status September 2013 K.-H. Sulanke DESY.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Some features of V1495 Shiuan-Hal,Shiu Everything in this document is not final decision!
Sales Training 3/14/2013 Owner : SAYD Cypress Confidential IDT ICS8543 vs. Cypress CY2DL1504 Clock distribution in Router applications Clock signals delivered.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
1 Timo Korhonen PSI 1. Concepts revisited…again 3. New (Diamond) cards features and status 4. EPICS interface 5. Conclusions SLS & Diamond Timing System.
EEE440 Computer Architecture
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
11/5/2015Mircea Bogdan1 Annie’s Central Card Status Report - 8/21/2015 The University of Chicago.
8114A Overview. 8114A Overview 10-Feb-04 Page A Overview 1) Specifications and Applications 2) Operational Overview 3) Block Diagram.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
NS Training Hardware. Print Engine Controller NS9775.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
New product introduction:
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Application & Control method for 62000B Series DC Power Supply.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
CTA Trigger and Integration Meeting, HU Berlin, /25/2016K.-H. Sulanke, DESY1 A Digital Trigger for CTA Cameras K.-H. Sulanke DESY.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
Analog Trigger for CTA MST CTA MST Trigger & Integration Meeting Berlin, 7 November 2011 Luis A. Tejedor on behalf of GAE-UCM, IFAE & CIEMAT groups 1.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
The University of Chicago
WP02 PRR: Master Oscillator and RF Reference Distribution
Front-end electronic system for large area photomultipliers readout
XFEL 2D Pixel Clock and Control System Train Builder Meeting, UCL 11 May 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing,
Fiber Based Synchronous Timing System
PDR of Master Oscillator
Presentation transcript:

The Clock Distribution inside the CTA Camera Axel Kretzschmann, DESY Zeuthen,

Features will distribute a clock and a synchronous data- line for date, timestamp etc. up to 500 MHz (400 MHz for Altera interface) interface to external clock source outputs not individual tunable (in this version) transmission : LVDS via CAT6A cable maximal 576 cluster (a 7 pix = 4032 pixel) optional: trigger broadcasting one standard crate, 6U high PCB form factor: Doppel-Euro

ClockData Control Basic Scheme function: providing a clock and timestamp synchronous to all Front-End-Modules interface to external source of clock and data, e.g. MUTIN card

ClockData Control Basic Scheme function: providing a clock and timestamp synchronous to all Front-End-Modules interface to external source of clock and data, e.g. MUTIN card

ClockData Control 1 to 24 Fanout Module main aim of design: low jitter concept: 2 stages of fanouts only a single type of PCB is needed basic scheme of the 1-to-24-Fanout-Module

cascading the basic modules in 2 levels gives max 576 clock lines = 4032 pixel

interface to external source of clock and data, e.g. MUTIN card function: providing a clock synchronous to all Front-End-Modules

optional function: a) collecting a signal from all trigger boards and broadcast this to all Front-End-Modules b) broadcast other information OR

test version of 1 to 24 Fanout Module 1 channel 1=>12

testing performance: maximum frequency => good enough cascaded 2 stages: works up to 900 MHz cascaded 5 stages: works up to 600 MHz BW oszi: 800 MHz

test setup

Overview Jitter Performance of the Clock Distribution Chain ADCLK854 Broadband Random Jitter: typ 150 fs rms ADCLK854 Broadband Random Jitter: typ 150 fs rms Clock Source LVDS Receiver with PLL 2 m cable adds crosstalk induced jitter: ??? ps internal Broadband Random Jitter: 1,3 ps peak-peak => ok => good enough

Overview Skew Performance of the Clock Distribution Chain ADCLK854 Output Skew: max 65 ps On the Same Part ADCLK854 Output Skew: max 390 ps Across Multiple Parts Clock Source LVDS Receiver with PLL 0,5 m cable: ps skew 2 m cable: ps skew sum: max +- 1,0 ns skew => good enough or inadequate ??

discussion skew estimated cable skew: % of traveling time 1 m = 4,2 ns=> at 0,5 m: ps => at 2 m: ps performance given by factory: Draka Light Blue: impedance: Ohm SCP solid:impedance: Ohm ELBROimpedance: Ohm, propagation delay skew 0,2 ns / 1 m Lappkabelimpedance: Ohm ortronicsimpedance: Ohm additional: skew = f( temperature, voltage, age)

timing performance over all components of the camera front endclock distribution system trigger board skew < 1,0 ns PM delay time skew < 5 ns accumulated skew < 1 ns time should be made isochronous at this layer

ClockData Control interface to external source of clock and data, e.g. MUTIN card features: will distribute a clock and a synchronous data-line for date, timestamp etc. up to 500 MHz (400 MHz Altera) interface to external clock source outputs not individual tunable (in this version) transmission : LVDS via CAT6A cable maximal 576 cluster (a 7 pix = 4032 pixel) optional: trigger broadcasting clock distribution system

how to cure to much skew: 1. measure sets of similar cables: lose cost and easy spare parts providing 2. buy sets of similar cables: lose cost and easy spare parts providing 3. use tunable fan-out-drivers:lose jitter, cost, adjustment procedure 4. make cables shorter:leads to complex design of camera 5. use better cables:lose cost 6. use glass-fibrelose cost, complex handling 7. invent a smart method with use of the existing camera hardware to make sure that skew is better than lower limit and automatically find bad skew cables: a challenge, depends on camera hardware 8. the camera hardware has to work with this clock conditions

RJ45 2x6 fold RJ45 2x6 fold RJ45 Cyclone 4 big or small version supply con. interfaceDC/DC 3 col LED RS232 3 col LED -supply: 12 V -SPI Bus 24 jacks LVDS output Block Diagram of the 1 to 24 Fanout Module supply con.

RJ45 2x6 fold RJ45 reset ic 3 col LED Block Diagram of V1 RJ45 oszill.

1 to 24 Fanout Module as Crate Master GPS Module Master- of- Camera- PC front panel 12 V SPI Bus

1 to 24 Fanout Module as stage-2-fanout 24 cables to Front- End front panel 12 V SPI Bus

19 inch crate front-side-only gives 13 x 24 = 312 cluster (= 2184 pixel) 1897 pixel needs 12 modules, => one slot free for…. 6 units = 260mm 6 TE = 30mm

two 19 inch crates front-side-only gives (13+11) x 24 = 576 cluster (= 4032 pixel)